HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 9931560 (3)CHANGE ORDER NO. 03
PROJECT TITLE: Nix Farm
CONTRACTOR: Cottier Construction, Inc.
PROJECT NUMBER: 30547107
DESCRIPTION: Remodel of Main Farm House and new Maintenance Building.
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Owner adds and unforeseen conditions.
2. Description of change: See Attachments of 7 pages.
3. Change in contract cost: $26,170.00
4. Change in contract time: Changed to September 1, 2002 as per Work Change Directive 01-
2002
(Attach additional sheets as required)
ORIGINAL CONTRACT COST .......... ......................... ............... ........ $1,558,956.00
TOTAL APPROVED CHANGE ORDERS. ............................................ 48,217.00
TOTAL PENDING CHANGE ORDERS ................................................
TOTAL % OF THIS CHANGE ORDER ....... 1.6%
TOTAL C.O. % OF ORIGNINAL CONTRACT .... 4.8%
TOTAL THIS CHANGE ORDER ....................................................... 26,170.00
ADJUSTED CONTRACT COST .................... ................................ $1,633,343.00
ACCEPTED BY:
Cottier Construction, Inc.
REVIEWED BY:
Engineer, JR Engineering
REVIEWED BY:
REVIEWED BY:
APPROVED BY:
Program
Sears
Project Manager, Steve White
cc: City Clerk Project File
Contractor Purchasing
Engineer
Date
Date
Date
Date
817 c,z
Date