Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5719 SOUTHRIDGE GOLF CART STORAGE (2)TRANSACTION REPORT P.01 JUL-03-02 WED 09:56 AM x SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE NO DP X JUL-03 09:55 AM BUILDERS EXCHANGE 1'02" 3 SEND ( M) OK 121 )K TOTAL iM 2S PAGES: 3 Administrative Services - Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 BID #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July 11.2002 To all prospective bidders under the specifications and contract documents describect r1e, the following changes are hereby made - Drawings; Sheet A2 and Sheet S2.1 : Sloping the interior concrete slab per Addendum 1 will require raising thi of the foundation curb 5". Raise curb on detail 11A2 and 5/S2.1 per attached de, Extend rebar and add one horizontal bar. Sheet SDI:derail- P. 01 TRANSACTION REPORT JUN-26-02 WED 01:47 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE NO DP )K JUN-26 01:40 082 t PM 913032212907 41 K' 0 SEND ( M) BUSY 01:38 PM 96631566 28" 1 SEND ( M) OK 082 01.39 PM 94824537 29" 1 SEND t M) OK 082 01:40 PM 913034446774 33" 1 SEND ( M) OK 082 1 01.47 PM 95324051 *x'x*" 0 SEND ( M) BUSY 082 01.42 PM 919707850767 28" 1 SEND ( M) OK 082 TOTAL 1M 58S PAGES: 4 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No, 1 Bid #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #6719 Southridge Golf Cart Storage OPENING DATE: July 11, 2002, 3:00p,m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al, Floor Plan Beginning at the center of the building, slope the concrete floor slab at 1 % towards each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be issued before construction. P. 01 TRANSACTION REPORT BROADCAST DATE START RECEIVER TX TIME PAGES TYPE JUN-26-02 WED 03:19 PM NOTE M# DP JUN-26 03:12 PM 92212907 29" 1 SEND ( M) OK 083 1 03:19 PM 95324051k" 0 SEND ( M) BUSY 083 TOTAL 29S PAGES: 1 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 Bid #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July 11, 2002, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet All, Floor Plan Beginning at the center of the building, slope the concrete floor slab at 1 %n towards each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be issued before construction. Ctie�� Ch1 P. 01 TRANSACTION REPORT JUN-26-02 WED 03:28 PM SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUN-26 03:28 PM 919705324051 0 SEND ( M) BUSY 084 TOTAL OS PAGES: 0 Purchasing Division CITY OF FORT COLLINS ADDENDUM No.1 Bid #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE, July 11, 2002, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings; Sheet Al, Floor Plan Beginning at the center of the building, slope the concrete floor slab at 1 % towards each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be issued before construction. eti„<. cn1 P. 01 TRANSACTION REPORT JUL-03-02 WED 08:55 AM SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUL-03 08:54 AM 92212907 1'04" 3 SEND ( M) OK 119 TOTAL 1M 4S PAGES: 3 City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 BID #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July 11, 2002 To all prospective bidders under the specifications and contract documents described above. the following changes are hereby made. Drawings: Sheet A2 and Sheet S2.1: Sloping the interior concrete slab per Addendum 1 will require raising the top of the foundation curb 5". Raise curb on detail 1 /A2 and 5/S2.1 per attached detail. Extend rebar and add one horizontal bar. Sheet SD1: P, O1 TRANSACTION REPORT JUL-03-02 WED 09:02 AM BROADCAST t DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUL-03 09:02 AM BUILDERS EXCHANGE'" 0 SEND ( M) BUSY 118 TOTAL OS PAGES: 0 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 BID #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July 11, 2002 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet A2 and Sheet S2.1: Sloping the interior concrete slab per Addendum 1 will require raising the top of the foundation curb 5". Raise curb on detail t/A2 and 5/S2.1 per attached detail. Extend rebar and add one horizontal bar. Sheet SD1: P. 01 TRANSACTION REPORT JUL-02-02 TUE 11:55 AM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUL-02 11:54 AM-91�93221290i2� 6� W W, 0 SEND ( M) BUSY 111 11:55 AM 46922424OZ.2 *Mffi 0 SEND ( M) BUSY 111 11:52 AM 96631566 1105" 3 SEND ( M) OK 111 11:36 AM 94824537 1'04" 3 SEND ( M) OK 111 11:37 AM 913034446774 8119" 3 SEND ( M) OK 111 11:46 AM 95324051 2'06" 3 SEND ( M) OK 111 11:49 AM 919707850767 1'04" 3 SEND ( M) OK III )K TOTAL 13M 38S PAGES: 15 Fort Collins Administrative services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 BID #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July '11, 2002 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet A2 and Sheet 52.1: Sloping the interior concrete slab per Addendum 1 will require raising the top of the foundation curb 5". Raise curb on detail 1 /A2 and 5/S2.1 per attached detail. Extend rebar and add one horizontal bar. Sheet SD1: P,O1 TRANSACTION REPORT JUL-02-02 TUE 01:58 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUL-02 01:58 PM BUILDERS EXCHANGE W W, 0 SEND ( M) BUSY 115 01:50 PM CMD 1'04" 3 SEND ( M) OK 115 01:55 PM DAILY JOURNAL 1'04" 3 SEND ( M) OK 115 01:52 PM PLAN ROOM 1'43" 3 SEND ( M) OK 115 TOTAL 3M 51S PAGES: 9 f � City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 BID #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid *5719 Southridge Golf Cart Storage OPENING DATE: July 11, 2002 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet A2 and Sheet S2.1: Sloping the interior concrete slab per Addendum 1 will require raising the top of the foundation curb 5". Raise curb on detail 1/A2 and 5/S2.1 per attached detail. Extend rebar and add one horizontal bar. Sheet SDI: P. 01 TRANSACTION REPORT JUN-26-02 WED 04:39 PM BROADCAST 1 DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUN-26 04:35 PM BUILDERS EXCHANGE 26" 1 SEND ( M) OK 086 0C 36 PM CMD 28" 1 SEND ( M) OK 086 04;37 PM DAILY JOURNAL 27" 1 SEND ( M) OK 086 04:37 PM PLAN ROOM 1'36" 1 SEND ( M) CANCEL 086 TOTAL 2M 57S PAGES: 4 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 Bid #8719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July 11, 2002, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al, Floor Plan Beginning at the center of the building, slope the concrete floor slab at 1 % towards each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be issued before construction. P. 01 TRANSACTION REPORT JUN-26-02 WED 04:43 PM SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUN-26 04:42 PM 917194719500 50" 1 SEND ( M) OK 087 TOTAL 50S PAGES: 1 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 Bid #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July 11, 2002, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al, Floor Plan Beginning at the center of the building, slope the concrete floor slab at 1 % towards each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be issued before construction. cr,00t cnI P. 01 TRANSACTION REPORT JUN-26-02 WED 04:47 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUN-26 04:47 PM PLAN ROOM *x'*x" 0 SEND ( M) BUSY 086 TOTAL OS PAGES: 0 P. 01 TRANSACTION REPORT JUN-26-02 WED 04:32 PM SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUN-26 04:31 PM 95324051 36" 1 SEND ( M) OK 085 K TOTAL 36S PAGES: 1 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No.1 Bid #5719 SOUTHRIDGE GOLF CART STORAGE SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5719 Southridge Golf Cart Storage OPENING DATE: July 11. 2002, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al, Floor Plan Beginning at the center of the building, slope the concrete floor slab at 1 % towards each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be issued before construction. Chcet Cn 1