HomeMy WebLinkAboutCORRESPONDENCE - BID - 5719 SOUTHRIDGE GOLF CART STORAGE (2)TRANSACTION REPORT P.01
JUL-03-02 WED 09:56 AM x
SEND(M)
DATE START RECEIVER TX TIME PAGES TYPE NOTE NO DP X
JUL-03 09:55 AM BUILDERS EXCHANGE 1'02" 3 SEND ( M) OK 121 )K
TOTAL iM 2S PAGES: 3
Administrative Services -
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July 11.2002
To all prospective bidders under the specifications and contract documents describect r1e, the
following changes are hereby made -
Drawings;
Sheet A2 and Sheet S2.1 :
Sloping the interior concrete slab per Addendum 1 will require raising thi of the
foundation curb 5". Raise curb on detail 11A2 and 5/S2.1 per attached de, Extend
rebar and add one horizontal bar.
Sheet SDI:derail-
P. 01
TRANSACTION
REPORT
JUN-26-02
WED 01:47 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES TYPE
NOTE
NO DP
)K JUN-26 01:40
082 t
PM
913032212907 41
K'
0 SEND
( M)
BUSY
01:38
PM
96631566
28"
1 SEND
( M)
OK
082
01.39
PM
94824537
29"
1 SEND
t M)
OK
082
01:40
PM
913034446774
33"
1 SEND
( M)
OK
082
1 01.47
PM
95324051
*x'x*"
0 SEND
( M)
BUSY
082
01.42
PM
919707850767
28"
1 SEND
( M)
OK
082
TOTAL
1M 58S
PAGES:
4
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No, 1
Bid #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #6719 Southridge Golf Cart Storage
OPENING DATE: July 11, 2002, 3:00p,m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al, Floor Plan
Beginning at the center of the building, slope the concrete floor slab at 1 % towards
each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be
issued before construction.
P. 01
TRANSACTION REPORT
BROADCAST
DATE START RECEIVER TX TIME PAGES TYPE
JUN-26-02 WED 03:19 PM
NOTE
M# DP
JUN-26 03:12 PM 92212907 29" 1 SEND ( M) OK 083
1 03:19 PM 95324051k" 0 SEND ( M) BUSY 083
TOTAL 29S PAGES: 1
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
Bid #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July 11, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet All, Floor Plan
Beginning at the center of the building, slope the concrete floor slab at 1 %n towards
each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be
issued before construction.
Ctie�� Ch1
P. 01
TRANSACTION REPORT
JUN-26-02
WED 03:28 PM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M#
DP
JUN-26 03:28 PM 919705324051
0 SEND
( M) BUSY
084
TOTAL
OS PAGES:
0
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No.1
Bid #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE, July 11, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings;
Sheet Al, Floor Plan
Beginning at the center of the building, slope the concrete floor slab at 1 % towards
each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be
issued before construction.
eti„<. cn1
P. 01
TRANSACTION REPORT
JUL-03-02
WED 08:55 AM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M#
DP
JUL-03 08:54 AM 92212907
1'04" 3 SEND
( M) OK
119
TOTAL
1M 4S PAGES:
3
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July 11, 2002
To all prospective bidders under the specifications and contract documents described above. the
following changes are hereby made.
Drawings:
Sheet A2 and Sheet S2.1:
Sloping the interior concrete slab per Addendum 1 will require raising the top of the
foundation curb 5". Raise curb on detail 1 /A2 and 5/S2.1 per attached detail. Extend
rebar and add one horizontal bar.
Sheet SD1:
P, O1
TRANSACTION REPORT
JUL-03-02
WED 09:02 AM
BROADCAST
t
DATE START RECEIVER TX TIME PAGES TYPE
NOTE
M#
DP
JUL-03 09:02 AM BUILDERS EXCHANGE'" 0 SEND
( M) BUSY
118
TOTAL
OS PAGES:
0
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July 11, 2002
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet A2 and Sheet S2.1:
Sloping the interior concrete slab per Addendum 1 will require raising the top of the
foundation curb 5". Raise curb on detail t/A2 and 5/S2.1 per attached detail. Extend
rebar and add one horizontal bar.
Sheet SD1:
P. 01
TRANSACTION
REPORT
JUL-02-02
TUE 11:55 AM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
JUL-02 11:54
AM-91�93221290i2�
6� W W,
0
SEND
( M)
BUSY
111
11:55
AM 46922424OZ.2
*Mffi
0
SEND
( M)
BUSY
111
11:52
AM 96631566
1105"
3
SEND
( M)
OK
111
11:36
AM 94824537
1'04"
3
SEND
( M)
OK
111
11:37
AM 913034446774
8119"
3
SEND
( M)
OK
111
11:46
AM 95324051
2'06"
3
SEND
( M)
OK
111
11:49
AM 919707850767
1'04"
3
SEND
( M)
OK
III )K
TOTAL
13M 38S
PAGES:
15
Fort Collins
Administrative services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July '11, 2002
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet A2 and Sheet 52.1:
Sloping the interior concrete slab per Addendum 1 will require raising the top of the
foundation curb 5". Raise curb on detail 1 /A2 and 5/S2.1 per attached detail. Extend
rebar and add one horizontal bar.
Sheet SD1:
P,O1
TRANSACTION
REPORT
JUL-02-02
TUE 01:58 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
JUL-02 01:58 PM
BUILDERS EXCHANGE
W W,
0
SEND
( M)
BUSY
115
01:50 PM
CMD
1'04"
3
SEND
( M)
OK
115
01:55 PM
DAILY JOURNAL
1'04"
3
SEND
( M)
OK
115
01:52 PM
PLAN ROOM
1'43"
3
SEND
( M)
OK
115
TOTAL
3M 51S
PAGES:
9
f
�
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid *5719 Southridge Golf Cart Storage
OPENING DATE: July 11, 2002
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet A2 and Sheet S2.1:
Sloping the interior concrete slab per Addendum 1 will require raising the top of the
foundation curb 5". Raise curb on detail 1/A2 and 5/S2.1 per attached detail. Extend
rebar and add one horizontal bar.
Sheet SDI:
P. 01
TRANSACTION REPORT
JUN-26-02
WED 04:39 PM
BROADCAST
1
DATE START
RECEIVER
TX TIME PAGES
TYPE
NOTE
M# DP
JUN-26 04:35
PM
BUILDERS EXCHANGE
26" 1
SEND
( M)
OK
086
0C 36
PM
CMD
28" 1
SEND
( M)
OK
086
04;37
PM
DAILY JOURNAL
27" 1
SEND
( M)
OK
086
04:37
PM
PLAN ROOM
1'36" 1
SEND
( M)
CANCEL
086
TOTAL
2M 57S
PAGES:
4
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
Bid #8719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July 11, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al, Floor Plan
Beginning at the center of the building, slope the concrete floor slab at 1 % towards
each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be
issued before construction.
P. 01
TRANSACTION REPORT
JUN-26-02
WED 04:43 PM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M#
DP
JUN-26 04:42 PM 917194719500
50" 1 SEND
( M) OK
087
TOTAL
50S PAGES:
1
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
Bid #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July 11, 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al, Floor Plan
Beginning at the center of the building, slope the concrete floor slab at 1 % towards
each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be
issued before construction.
cr,00t cnI
P. 01
TRANSACTION REPORT
JUN-26-02
WED 04:47 PM
BROADCAST
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
JUN-26 04:47 PM PLAN ROOM
*x'*x" 0 SEND
( M) BUSY
086
TOTAL
OS PAGES:
0
P. 01
TRANSACTION REPORT
JUN-26-02
WED 04:32 PM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M#
DP
JUN-26 04:31 PM 95324051
36" 1 SEND
( M) OK
085
K
TOTAL
36S PAGES:
1
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No.1
Bid #5719
SOUTHRIDGE GOLF CART STORAGE
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5719 Southridge Golf Cart Storage
OPENING DATE: July 11. 2002, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al, Floor Plan
Beginning at the center of the building, slope the concrete floor slab at 1 % towards
each of the overhead doors. Cricket the slab at each of the jambs. A drawing will be
issued before construction.
Chcet Cn 1