Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 5670 MULBERRY BRIDGE EXTENSIONOCT-15-2002 TUE 07:41 AM CFC ENG, FAX NO. 9702216378 P. 01/02 Change Order PROJECT TITt L Mulberry Bridge Extension (Bid No, 5670) PROJECT NUMBER: 30525022.6 CONTRACTOR: TLM Constructors, Inc. (PO 92201624) CHANGE ORDER NUMBER: 2 n prT—` ep2 rTig c range nr c rs s row it or er as separa a num ore paragrap is e o owing: 1 Reason for change. 2. Description of change. 3. Chenge in contract cost. 4. Change in contract tune. 1&2. Sea altached invoice for details. 3. Tho contract cost will increase by $10,117.85 4. The final completion data will ba extended by 7 days to November 8, 2002, ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL, THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTCD CONTRACT COST ACCEPTED BY: ACCEPTF T) BY: REVIEWLD BY'. (1:10gineer) APPROVED BY: J✓I APPROVED BY: cc: Accounting Controctor Project File av— 24.53% � ,24.53% Agent over $30,000) [ ii $77,947.00 $0.00 $0.00 $19,117.85 $97,064.us DATE: _—& ^ )ATE:`--U-- DATE: DATE; lo--2- a Z MutherntEidgeExtensiorChange Order summar, Change Order t,;o: 2 S'3Dt02 Original r Difference Item Description Quantity Unit SfUnit Revised Quantity from Bid t Reraaals after Rerncoilaa+ion E 0 LS S4 02;1.00 1 4 02D.D0 2 Rafia"ra ' LS 53,350.00 D (3,350.00) 3 Struct:ral Excavation after Remani:izabcn 0 CY $24.00 96 2,304.CO 4 Stru_-WM5 Excavation 190 i CY S20.00 0 (3,80 u0} i 5 Strarta2. Backtill ;Class 1) otter R: mobilization G= CY $32t10 I SG 2,S60.OG 5 Sirie!eratBaekGL (Class I 1 165 CY $20.03 0 (3,300.00) 7 Ho[ 6tcminocs Psiemant (G ceding S) (ksp.'lattj 8.5 TON Sl80.00 .0A 342.00 8 ConcaL Gass B 13 CY 5430.00 O (5,590.00) 5 Ccnarete C-assD 12 CY $9E0.00 3.29 f8,53580; 10 Concrete Class D after Remobllization 0 CY $885.00 17 15,C45.D0 ( 11 Reinforcing Seel 2220 LB WE 1021.76 (1,018.51)) Reinforcing Seel �Eaoxy Coated) 2975 LS 51.10 1536.8 (1,582021 Reinforcing Steel after Remobilization 0 LB $0 85 268724 2,284.15 Reinforcing Steel (Epoxy Coa:etl) after Remoba¢aGon 0 LB 51.10 1438-2 1,582.02 StoneFacing(RiverRack) 120 SF 53500 0 (4.320.CG) j20 Ston=_ Facing (Red Flagstone) 0 SF S42 00 120 5, D40.00 Remo:,ilizat+on 0 LS :dabiliza5ar.1 LS $9S00.00 0.39 (5,795.G0)BppOj Calssons ;24`) 0 LF 5146A0 92 13,432.01) SubTatal Net Chancre to Contract Amount 19.417.85 ON O N O N