Change Order
PROJECT TITt L Mulberry Bridge Extension (Bid No, 5670)
PROJECT NUMBER: 30525022.6
CONTRACTOR: TLM Constructors, Inc. (PO 92201624)
CHANGE ORDER NUMBER: 2
n prT—` ep2 rTig c range nr c rs s row it or er as separa a num ore paragrap is e o owing:
1 Reason for change. 2. Description of change.
3. Chenge in contract cost. 4. Change in contract tune.
1&2. Sea altached invoice for details.
3. Tho contract cost will increase by $10,117.85
4. The final completion data will ba extended by 7 days to November 8, 2002,
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL, THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTCD CONTRACT COST
ACCEPTED BY:
ACCEPTF T) BY:
REVIEWLD BY'.
(1:10gineer)
APPROVED BY: J✓I
APPROVED BY:
cc: Accounting
Controctor
Project File
av— 24.53%
�
,24.53%
Agent over $30,000)
[ ii
$77,947.00
$0.00
$0.00
$19,117.85
$97,064.us
DATE: _—& ^
)ATE:`--U--
DATE:
DATE;
lo--2- a Z
MutherntEidgeExtensiorChange Order summar,
Change Order t,;o: 2 S'3Dt02
Original
r Difference
Item
Description
Quantity
Unit
SfUnit
Revised Quantity
from Bid
t
Reraaals after Rerncoilaa+ion
E 0
LS
S4 02;1.00
1
4 02D.D0
2
Rafia"ra
'
LS
53,350.00
D
(3,350.00)
3
Struct:ral Excavation after Remani:izabcn
0
CY
$24.00
96
2,304.CO
4
Stru_-WM5 Excavation
190
i CY
S20.00
0
(3,80 u0}
i 5
Strarta2. Backtill ;Class 1) otter R: mobilization
G=
CY
$32t10
I
SG
2,S60.OG
5
Sirie!eratBaekGL (Class I
1 165
CY
$20.03
0
(3,300.00)
7
Ho[ 6tcminocs Psiemant (G ceding S) (ksp.'lattj
8.5
TON
Sl80.00
.0A
342.00
8
ConcaL Gass B
13
CY
5430.00
O
(5,590.00)
5
Ccnarete C-assD
12
CY
$9E0.00
3.29
f8,53580;
10
Concrete Class D after Remobllization
0
CY
$885.00
17
15,C45.D0
( 11
Reinforcing Seel
2220
LB
WE
1021.76
(1,018.51))
Reinforcing Seel �Eaoxy Coated)
2975
LS
51.10
1536.8
(1,582021
Reinforcing Steel after Remobilization
0
LB
$0 85
268724
2,284.15
Reinforcing Steel (Epoxy Coa:etl) after Remoba¢aGon
0
LB
51.10
1438-2
1,582.02
StoneFacing(RiverRack)
120
SF
53500
0
(4.320.CG)
j20
Ston=_ Facing (Red Flagstone)
0
SF
S42 00
120
5, D40.00
Remo:,ilizat+on
0
LS
:dabiliza5ar.1
LS
$9S00.00
0.39
(5,795.G0)BppOj
Calssons ;24`)
0
LF
5146A0
92
13,432.01)
SubTatal Net Chancre to Contract Amount 19.417.85