Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 5612 ASPHALT OVERLAY PROJECT ANNUALOCT-08-2002 TUE 09:14 AM CFO ENG, FAX N0, 9702216378 P. 01 Change Order Form City of tort Col)iru �W PROJECT 11TLE: 2002 Street Maintenance Project PROJECT NUMBER: 30522121.6 (Asphalt Overlay pmjed) - Rid #6512 CONTRACTOR: Connell Resources, Inc. (PO 02202547) CHANGE ORDER NUMBER: 3 n preparing c range n ers show to or er as separe o num er paragraphs e owing: 1. Rcasnnforchange, 2. DesorlpUonotchange. 3. Ch4ngo in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3.•i The contract cost will decrease by -$159,891.70 4• There will be no change In contract time, ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C,O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: $1,390,960.60 $47,645.50 $O.DO ($1.-- 59'69�+ �11.60Y. -8A7% $1,278,714,30 DATE: ACCEPTED BY:i� c �- DATE: C/'�CJ — D (Protect Manager) REVIEWED BY: -I,/ DATE: (Engineer) APPROVED BY: APPROVED BY: ^ DATE: (Purchasing Agent over $30,000) �: conuaotn. plrtdtesina PIWsd File q-,-9 3-4a fncinponnw nonanmgnt • 'G'1 Vn..w r.n.._. _ _ ... - OOT-08-2002 TUE 09114 AM CFO ENC. FAX NO. 9702216378 P. 02 20C ksphait Overlay Project • Bid No; ;1z Connell Resources Change Order No.: 3 Dote: 0/11t/02 1. Reason For Change: a. The Falrbrooke eras was akr* eted (mm the program, b. The binder on Llrwstn was changed to a Modified bndar for arterial saolbna. 2, Description of Charge: I Remove 01e FairbrwM quantities fmm the conlrad. b. Add to Item 403,70 Upgrade to Modified Binder- Grading 8 2. Charge In Contract Amount: Hem QtV Unit Unit coat Total Coat :z a. 210.01 AdfuatVahoSam 21a,10 Adjust 8psolal MMnhole.24' 3 FA $ 2ti5.OD S 403,20 HAP-GraftaX 30 EA S 835.00 lt (8080.00) 403.30 H3P-Grar0ng8 -280 TON S 38.80 S (102,400.00) 403.00 Ovolerd0a Pwing Fabric -m TON $ 35.80 $ (35,764.20) b. 403.70 Upgrade to Modified Binder. Grading 9 -3500 8T $ 2.15 $ (7AW.00) TON $ 5.35 $ 7,222.50 TOTAL CHANGE IN CONTRACT AMOUNT S (16g,g1,T0) A, Change In CoMraot Time A, There Is no dmnge In oontrect time b. Them is no change in Conked lima