HomeMy WebLinkAboutCHANGE ORDER - BID - 5705 FOSSIL CREEK IMPROVEMENTSChange Order Form woos aftyort Collins PROJECT TITLE: Fossil Creek Parkway Street Improvements Project PROJECT NUMBER: 30523230.6 (Bid #5707) CONTRACTOR: Connell Resources, Inc. (PO#2204044) CHANGE ORDER NUMBER: 1 n preparing cnange oraers snow in oraer as separate numoerea paragrapns the ronowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED ACCEPTED REVIEWED APPROVED APPROVED BY: a: Purchasing Accounting Contractor Project File $55,089.30 Agent over $30,000) 9.84% 9.84% $559,892.50 $0.00 $0.00 $55,089.30 $614,981.80 7 /d FOSSIL CREEK PARKWAY STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Installed fly ash along north side of Fossil Creek Parkway. - See attached submittal - Item 1 Unit / Unit Total Son Haul North side of Fossil Creek Parkway 7653 SY 1 $ 5.60 1 $ 42,856.80 TOTAL $ 42,858.80 Due to pumping and rolling along the north side of the job it was determined that to fly ash was more economical and time efficient for the job. Posted to Pay Estimate 4 1 FOSSIL CREEK PARKWAY STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Installed additional silt fence as directed by inspector - See attached submittal - Item Unit / Unit I Total lConnell Resources Silt Fence 400 LF 1 $ 4.25 1,700.00 TOTAL $ 1,700.00 The designer had failed to display the need for silt fence within there design so it was decided that the need was present to place silt fence at the outfalls of the storm sew er pipe. Posted to Pay Estimate # f FOSSIL CREEK PARKWAY STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Extra Flow Fill for storm sewer pipes See attached submittal - Item Unit $ / Unit Total lGonnell Resources, Inc. Non -Shrink ow Fill75.5 CY $ 75.00 5,662.50 Connellesources,Inc. Concrete loin encasement4 EA 800.00 (3,200.00 TOTAL $ 2,462.50 To decrease the delay time on the road, flow fill was used around and over the roadway crossings of the storm sewer pipe. Posted to Pay Estimate # f FOSSIL CREEK PARKWAY STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Additional irrigation Sleeving See attached submittal - Item Unit $ /Unit Total onne Resources irrigation eeving 140 LF 13.00 1,820.00 I U I AL $ 1,820.00 Due to landscaping requirements and future need to preserve the roadway irrigation sleeving was added to the medians near College Avenue Posted to Pay Estimate # 1 FOSSIL CREEK PARKWAY STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Install additional 24" pipe at Parkway Circle West See attached submittal - Item I Unit $ / Unit 1 Total lGonnell Resources, Inc. Lxtra 105 LF $ 50.00 $ 5,250.00 TOTAL $ 5,250.00 Installed an additional amount of pipe under Parkway Circle West to accomidate the Side Walk and slope restrictions for the site Posted to Pay Estimate # 1 FOSSIL CREEK PARKWAY STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Remove Section of median See attached submittal - Item Unit / Unit I Total lGonnell Resources, Inc. Median emova 1 LS 1,000.00 1 $ 1,000.00 TOTAL $ 1,000.00 Removed a section of the third median from College Avenue to create the entrance for the future Discount Tire Company and the future Snead Drive Connection Posted to Pay Estimate # f