HomeMy WebLinkAboutCHANGE ORDER - RFP - P812 SECOND SHEET OF ICE AT EPIC (3)SECTION 00950 CHANGE ORDER NO. 3 PROJECT TITLE: Second Sheet of Ice at EPIC CONTRACTOR: The Neenan Company BID NUMBER: P-812 DESCRIPTION: The design and construction of an addition to the Edora Pool Ice Center (EPIC) to house a full size ice arena and associated facilities and equipment. In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: To provide dehumidification for the existing rink. 2. Description of change: Add to the dessicant system for the new addition to provide dehumidification for the existing rink. Change in Contract Cost: $19,705.00 4. Change in Contract Time: 0 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $3,360,896.00 TOTAL APPROVED CHANGE ORDERS a TOTAL PENDING CHANGE ORDERS 51,949.00 TOTAL THIS CHANGE ORDER 19,705.00 ADJUSTED CONTRACT COST $3,432,550.00 (Assuming all change orders approved) ACCEPTED BY: APPROVED BY 7 L--- Kepresentative Facilities Project cc: City Clerk Project File D/B Contractor Purchasing Date 7 Z I E3 Z02 Date