HomeMy WebLinkAboutCHANGE ORDER - RFP - P812 SECOND SHEET OF ICE AT EPIC (2)SECTION 00950 CHANGE ORDER NO. 2 PROJECT TITLE: Second Sheet of Ice at EPIC CONTRACTOR: The Neenan Company BID NUMBER: P-812 DESCRIPTION: The design and construction of an addition to the Edora Pool Ice Center (EPIC) to house a full size ice arena and associated facilities and equipment. In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: To extend the piping from the ice refrigeration system in the new addition to accommodate adding the existing rink for a two -rink operation in the future. 2. Description of change: Addition of the piping from the ice refrigeration system mechanical room in the new addition to the existing rink wall for connection at a later date. Change in Contract Cost: $20,362.00 4. Change in Contract Time: 0 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $3,360,896.00 TOTAL APPROVED CHANGE ORDERS 0 TOTAL PENDING CHANGE ORDERS 31,587.00 TOTAL THIS CHANGE ORDER 20,362.00 ADJUSTED CONTRACT COST $3,412,845.00 (Assuming all change orders approved) ACCEPTED BY: Representative APPROVED BY: C;p col1 Facilities Project Mai cc: City Clerk Project File D/B Contractor Purchasing �21tg/O?, Date $ 0 Date