CHANGE ORDER - RFP - P812 SECOND SHEET OF ICE AT EPIC
SECTION 00950 CHANGE ORDER NO. 1 PROJECT TITLE: Second Sheet of Ice at EPIC CONTRACTOR: The Neenan Company BID NUMBER: P-812 DESCRIPTION: The design and construction of an addition to the Edora Pool Ice Center (EPIC) to house a full size ice arena and associated facilities and equipment. In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: To increase the ice refrigeration system capacity to accommodate a two -rink operation in the future. 2. Description of change: Increase the size of the chiller, condenser and skid for a two -rink operation. Skid does not include the compressor or pump needed for a two -rink operation. Skid will be configured to add the third compressor and pump needed for the two -rink operation. 3. Change in Contract Cost: $31,587.00 Change in Contract Time: 0 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $3,360,896.00 TOTAL APPROVED CHANGE ORDERS n TOTAL PENDING CHANGE ORDERS 0 TOTAL THIS CHANGE ORDER 31,587.00 ADJUSTED CONTRACT COST $3,392,483.00 (Assuming all change orders approved) ACCEPTED BY: / REVIEWED BY Kepresentative 7 I(;/© Date : (R U.' . :4 0 a % 1 8 Q Z Facilities Project Manager Date APPROVED BY Dath cc: City Clerk Project File D/B Contractor Purchasing