HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - CHANGE ORDER NUMBER 2r Change Order Form City of Fart Calling rKUJtc i i i i t_t: South Shields Street Improvement Project PROJECT NUMBER: 30523210.6 (Bid #5696) CONTRACTOR: Connell Resources, Inc. (PO#2203022) CHANGE ORDER NUMBER: 2 n preparing change orders show In order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by 4. There will.be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: (C ACCEPTED BY: (Project Me REVIEWED BY: (Engin er- APPROVED BY: (Prue Ma APPROVED BY� APPROVED BY: artmer APPROVED BY: ur asinc cc: Purchasing Accounting Contractor Project File $50,399.00 Street Oversizing) Management) (Project Managdr- Pedestrian Access) Agent over$30,000) Street Oversiang $46,974.00 Pavement Mgmt. $3,425.00 Pod. Access $0.00 6.21% 9.40% $811,015.40 $25,874.00 $0.00 $50,399.00 $887,288.40 _ DATE: DATE: (� � 1 DATE: DATE: 2- /0 _ D Ef DATE: DATE: 7 DATE: v L.� D DOCUMENT TRANSMITTAL DATE: '7-/9-Oz TO: 151� 1. � .� & FROM�,�� REFERENCE:fat ,,e, Roaol,�,�� THERE ARE TRANSMITTED AS CHECKED BELOW: ❑ For approval ❑ For your use ❑ As requested ❑ For review and comment ❑ Returning after loan to us ❑ Returned for corrections ❑ Revise and resubmit ❑ Rejected [A Sign and return REMARKS: SIGNED: Transportation Services Engineering Department 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6605 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Additional Landscape Materials - See attached submittal - Item Unit $ / Unit I Total A&M Landscaping Steel Edging 10LF $ 2.40 1 $ 24.00 A&M Landscaping Shrubs CIP 18 EA $ 9.50 1 $ 171.00 A&M Land sca in 2"-6" Cobbles 1 LS $ 155.00 $ 155.00 Lan scaping re e Redwood Bark1 LS $ 1,100.00 $ 1,100.00 TOTAL $ 1,450.00 Due to the grade change on the sidewalk along Spring Creek Plaza the existing landscaping (juniper shrubs) needed to be cut back. We had the assistant City Forester explained that the shrubs would turn brown if we were to cut them back. The property owner shared in the cost of removing the junipers and replanting smaller shrubs, etc... Posted to Pay Estimate # 2 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Additional Sod Installation - See attached submittal - Item I Unit $ / Unit Total A&M Landscaping Additional Sod Installation West Shields 9800 SF $ 1.10 $ 10,780.00 A M Landscaping Additional Sod Installation East Shields 4120 SF $ 1.10 $ 4,532.00 TOTAL $ 15,312.00 Both the east and west sides of Shields Street had areas that w e did not consider prior to construction to need sod installation. After the project started to take form, we changed our minds to include these areas. Posted to Pay Estimate # 2 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Exposed Aggregate Concrete See attached submittal - Item Unit / Unit Total xpress concrete Exposed Aggregate 128 SF 1 $ 5.501 $ 704.00 IUTAL $ 704.00 We poured exposed aggregate concrete in an area that we had originally intended to place sod and irrigation. T his area was too small for irrigation and we did not want to have to worry about replacing the sod in this area. Posted to Pay Estimate # 2 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Install Geogrid Stabilization Material - See attached submittal - Item Unit I Unit Total lConnell Resources Geogrid Stabifizatio—n—PraTeMal2540 SY $ 3.70 $ 9,398.00 TOTAL $ 9,398.00 On the west half of Shields Street in the reconstruciton area we found a lot of utilities that were too shallow for us to stabilize with flyash. Terracon suggested the geogrid stabilization material. Posted to Pay Estimate # 2 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Pavement Management -Additional Truck Cost for City Mill - See attached submittal - Item Unit $ / Unit Total 1(;onnell Resources Trucks for City Mill operation 1 LS 3,425.00 3,425.00 TOTAL $ 3,425.00 The City of Fort Collins Milling Crew helped with our overnight operation on June 21, 2002. Connell Resources supplied the extra trucking for the City mill. The area that the City milled will not be paid to Connell as it was originally intended on the bid documents. Posted to Pay Estimate # 2 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Message Boards and Specialty Signs - See attached submittal - Item Unit / Unit Total United Rentals Massa a Boards 1 LS $ 3,500.00 $ 3,500.00 nrte Rentals pecia ty igns 1 LS $ 800.00 $ 800.00 TOTAL $ 4,300.00 We asked the traffic control company to keep the message boards up for a few days after the project was complete to thank the citizens of Fort Collins for their patience during the construction process. The specialty sighs were put together by United Rental because the City of Fort Collins Traffic Department did not have time to work on the signs in the necessary time frame. Posted to Pay Estimate # 2 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Install Coco Mat soil stabilization Material - See attached submittal - Item Unit $ / Unit I Total onne Resources Install Coco a 1350 SY 4.80 6,480.00 TOTAL 6,480.00 The construction documents ask for Mirafi paper and our after further investigation we found that the Coco Mat would help with the drought issues and seed germination. It will also create a buffer between development and Spring Creek. Posted to Pay Estimate # 2 SOUTH SHIELDS STREET IMPROVEMENTS PROJECT Connell Resources, Inc. Additional Irrigation - See attached submittal - Item Unit I Unit I Total JAW Landscaping Additional irrigation—Ty—sre—m— 1LS 9,330.00 9,330.00 TOTAL $ 9,330.00 Necessary upgrade to include irrigation for a 15' parkway. Posted to Pay Estimate # 2