CHANGE ORDER NO. 7
PROJECT TITLE: Community Horticulture Center -
CONTRACTOR: EDAW, Inc.
PROJECT NUMBER: P-731
DESCRIPTION: Professional Design Services
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Add1 fees to redesign storm drainage system on Horticulture
Center property to carry developed flows generated from CSURF property to the south of
the Horticulture site.
2. Description of change: See attached — EDAW fee request and back-up information
3. Change in contract cost: Yes (total) $ 20,966.00
4. Change in contract time: Yes (professional services agreement extended to 3116103).
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
:) TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
ACCEPTED BY:
Greg F)6rst, PE EDAW, Incorporated
REVIEWED BY:
Gianola. PE
APPROVED BY:
CCCA
cc: City Clerk Project File
Contractor urchasing
Engineer
$ 225,000.00
192,762.00
00
PMPD Supervisor
Facilities Project Manager