Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - ADDENDUMCity of Fort Collins Proposed Addendum to 2025 Model Update and Consistency Findings ADDENDUM BACKGROUND The City of Fort Collins is currently performing an environmental assessment (EA) of the Mason Street Corridor as part of an ongoing planning process for funding and building a transit system in the corridor. FTA has requested that the baseline system for continued New Starts funding be enriched to provide a similar level of service (in terms of frequency of service) to the build alternative. While this work is being performed by the City and their selected consultant team, some modifications to the modeling process are required to summarize the data now required by FTA for ranking proposed transportation systems for new starts funding. In addition, due to time constraints, certain transit summaries and post -processing of the modified systems are required in a short time frame. Finally, although it might be necessary to modify either the build or baseline transit network to maximize the efficiency of the system, those tasks are not included here. Parsons provides expertise necessary to perform these tasks in a timely manner. rMPage 1 City of Fort Collins Proposed Addendum to 2025 Model Update and Consistency Findings PHASE 1 Task 1: Summarize / Post -Process Modified Baseline and Build Alternative Model Runs Objective: The objective of this task is to summarize and post -process the results of the revised baseline and, if necessary, the build alternative runs to produce information necessary for submittals to the FTA. Discussion: The City of Fort Collins is currently rerunning the baseline alternative for the Mason Street Corridor EA to implement changes requested by the FTA. In addition, due to changes in the Fort Collins travel model, it might be necessary to rerun the currently specified build alternative using the current versions of TransCAD and the Fort Collins travel model for consistency between the baseline and build alternatives. Parsons will perform post -processing and summaries of the transit ridership forecasts to produce the information required for submittal to the FTA. Products: A memorandum summarizing the transit ridership forecasts will be produced. Task 2: Document Transit Post -Processing / Summarization Procedures Objective: The objective of this task is to document the procedures used for transit post -processing and summaries so that they can be applied in a consistent manner for future analyses. Discussion: Task 1 will focus on summarizing the transit ridership results for the current submittal to FTA. The documentation prepared in Task 2 should allow others to perform summaries in a consistent manner for future submittals. Task 2 may use information from Task 1 for illustrative purposes. Products: This task will produce a stand-alone document or chapter that can be added to the Fort Collins travel model documentation. Task 3: Modify GISDK Script to Summarize Information Necessary for the Summit Spreadsheet Distributed by FTA Objective: The objective of this task is to modify the GISDK scripts necessary to implement the Fort Collins travel model to produce the data necessary to implement the FTA's Summit spreadsheet. IN I Page 2 City of Fort Collins Proposed Addendum to 2025 Model Update and Consistency Findings Discussion: FTA has modified the criteria used for evaluating and ranking new starts submittals. The new procedures are implemented using special spreadsheets provided by FTA. The spreadsheets require data from the mode choice model used for the region as input; however, the spreadsheet requires that the data be input in a specific format. The GISDK script used to implement the Fort Collins travel model will be modified to produce the required information for the Summit spreadsheets. It is anticipated that the implementation procedures will consist of a simple check box or button within the Fort Collins graphic user interface (GUI). FTA provides the documentation for the Summit spreadsheets. Thus, it is anticipated that minimal or no documentation will be required for this added option. Products: Modified GISDK script will be produced. BUDGET The proposed project amendment budget is shown below. The budget shown is in addition to the $25,134 budget for the original contract. In I Page 3 Table 1 Fort Collins 2025 Model Update Addendum Budget 08/05/02 Phase 1 Phase 2 Task 1 Task 2 Task 3 Task 1 Summarize/Post- Document Post- GISDK Optional Baseline Total Process Modified Modifications for Baseline and Processing Summit and Build Hourly Build procedures Spreadsheet Alternatives Rate Hours Cost Hou11 rs Cost Hours Cost Hours Cost Hours Cost Rodgers $ 28.00 40 $1,120 24 $672 32 $896 0 $0 96 $2,688 Kurth $ 51.00 12 $612 4 $204 24 $1,224 0 $0 40 $2,040 Jackson $ 72.00 0 $0 0 $0 0 $0 0 $0 0 $0 Support $ 16.00 8 $128 4 $64 8 $128 0 $0 20 $320 Labor Subtotal 60 $1,860 32 $940 64 $2,248 0 $0 156 $5,048 PTG Burden 1.3424 $2,497 $1,262 $3,018 $0 $6,777 PTG Subtotal $4,357 $2,202 $5,266 $0 $11,825 ,�- 'ate `"` WE �„�.' m� .. ..'t—`. Surface Travel $ 0.365 160 $58 130 $47 140 $51 0 $0 430 $156 Communications $0 $0 $0 $0 0 $0 Delivery Services 0 $0 Reproduction $ 10 $0 2 $20 $0 $0 2 $20 Miscellaneous 0 $0 Subtotal $58 $67 $51 $0 $176 y:. z - of Labor Parsons Fixed Fee 10% $436 $220 $527 $0 $1,183 & Burden Phase 1 cost is $13.184 Note: Assumes 2 days for JR, 1 day for DK for summarizing and post -processing each model run Note: Phase 2 assumes up to four alternatives. Ralph Jackson's time is for review and advice as needed.