Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - CHANGE ORDER NUMBER 2nm2g2002 09:33 9702216530 FACILITIES PAGE 02 CHANGE ORDER NO. -2 PROJECT TITLE: Cable 27 ShWo Prgact 0 CClly Hall CONTRACTOR: WoOt-A-Hauaca, Inc -- PROJECT NUMBER: 5683 Cdy pt Fort Ca ' s DESCRIPTION. Cable275hrdio(Ph!1)— In preparing change orders show in order as selwnde numbered paragraphs the following: i. Reason for change: unbroseen conditians -below grade non -typical conatmclion on orginal bhlg. _ zru—wl Heel for a-33IE= wai? - 2. DeSenphon of Chgngemnstmcimmnrnste wag (AdCok ad WM) not iderMW on architectural drawings 3. Change in contract coat: s en47.7a 4. Change in contract tire: nine (ANach additional shoats as muged) -- ORIGINAL CONTRACT COST _ $85,000.00 TOTAL APPROVED CHANGE ORDERS $2,286.00 TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER35,617 44 ADJUSTEDCONTRACT COST (Assuming all cha M orders approved) -- ACCEPTED BY< ---- _ B Contractor's Representative a .,,,,J 4 Q,y„ „ „ Date ACCEPTED BY: , L41 8a se a Project Manager Ste wr Seelaid Date REVIEWED BY: __ PrirdName NA APPROVEDBY: �lc'� u.�S-..:'( Print N e Stephen 6ee(5e — oc: City Clerk Project Fiha Contractor Purchasing Engineer NA Date a � a Date