August 27, 2002
Ph Fox (970y 669-6411
Metro (303) 530-7660
City of Fort Collins
Attn: Steve White
P.O. Sox 580
Fort Collins, CO 80522
RFE. CSU Transit Center
Dear Steve:
RFGs to you with backup and have had
This letter is regarding change order number three that includes RFC numbers 3, 6, ,
and 10. We had previously submitted these
weekly meetings
involvementengineer time
numerous lack o of the ona
dey procediscussions and
responsible for the lack of communication between the owner
weekly basis is largely per Article 11.2 of the general conditions,
and engineer on approving these RFCs. As p
the City c Fort Collins
the engineer shall determine the price o' changes if the owner and contractor a
unable to agree on re
price for additional work. To gr knowledge,
and Environmental tConcerns
e submitted he sE RFCd at an s to youe n our eter dated Augustnt on the price for there 12 s
This
2002, and requested that they be incorporated into a format change order.
I will briefly respond to the questions
a r hi a su miffed to us along wSth their denial
of the change order. These respon
RFC #6, item #2 - Lower existing drainage pipe and dewatering: '
We discussed on site during the installation of the CMPs that there was a clay tile with
ntercepted the new CMP locations. We had Robert Palmer from
running water that iirie what
d that
Huitt-Zollars make a site
d demo and abandon thewvisit to ®cline (see letter from HurttaZollars dated June 3).
we o ravel and 12" pipe to siphon the water
During construction we needed to ri0ition using 9Once
CMP around both cMPs during the
work done we were instdiralled to tie h8 clahese y UEa into the enew CMP. This
he
change was first submitted to You on .June 26, 2002,
RFC #7, item #1 — Additional utility w+uric
After many discussions and destg1� changes to this area, it was agreed thof inlet at the yard
inlets shown on sheet G2 were not included Additionally, Iy they were shoid because the wn outside of the
size and type of pip® ware not tabele stating that the inlets
demo area (see RFI #9)- Huitt-Zollars responded to this RFI by
FACILITIES
No•8238 W. 17/19
S-,ev.18, 2002 10:55AM
e9/18/2002 08:20 9702216534
REQUEST for CHANGE
CSU TRANSIT CENTER
PROJECT.
TO. CITY OF FT. COLLINS FACILITIES
117 N. MASON STREET
FT. COLLINS, CO 80522
ATTN: STEVE WHITE
ENVIRONMENTAL CONCERNS, INC.
2526 E. Highway 402
P.O. Box 2135
Loveland, CO 80639
Phone: (970) M-6291
Fax: (970) 669-6411
DATE- September 12, 2002
SUBJECT: RFC #6 (REVISED 9/12102) MISC. UTILITIES
ITEM #1- UTILITY WORK
LOWER EXISTING DRAINAGE PIPE (TEMP DEWATERING 2 AREA)2,84400
TIE IN 12" PIPE TO 60r CMP W/ CONC COLLAR
RAISE EXISTING MANHOLE 3- NOT SHOWN ON PLANS
ECI MARKUP 6°/6
INSTALL YARD INLETS 3 EA
INSTALL 12" PIPE TO INLETS
SCHEDULE IMPACT T.B.D. DAYS TO DATE
Contractor
Rick Coulter, Project Superintendent Date
Environmental COncern9, Inc..
SUBTOTAL
$ 1,330.00
REVISED RFC #7
REVISED RFC #7
u-so&w 4 3s? .Za
TOTAL THIS RE UEST
4382.7o
Accepted:
City of Ft. Collins Paciiities Date
FACILITIES
No,8238 4. 18/19
9eP,18. 2002 10:55AM
09/19/2002 08:20 9702216534
REQUEST for CHANGE
CSU TRANSIT CENTER
PROJECT:
TO: CITY OF FT. COLLINS FACILITIES
117 N. MASON STREET
FT, COLLINS, CO 80522
!ENVIRONMENTAL CONCERNS, INC.
2526 E. HighwaY 402
P.O. Box 2135
Loveland, CO 80639
Phone: (970) 669.6291
Fez: (970) 669 6411
DATE: September 12. 2002
ATTM STEVE WHITE
SUaIEcT: RFC #7 (REVISED 8112/02) REVISE YARD INLET AND ADD 12" CMP DRAINAGE PIPE
ITEM #1- UTILITY WORK- DISREGARD THE YARD INLETS AND PIPING ON RFC #6
RELOCATED YARD
INSTALL
60LF
$ 408B,-A0-
60011 ' \Ago
lNLgKA0p
0.50 %4 QM
1NSTAL`E $ —�B 00"`
INSTALL (2) 12" CMP PIPE 8OLF (REVISED DUE TO INCORRE $T O RO I NG REVISIONS 7/9/02)
INSTALL (4) 12" CMP F.E S. $ 1,760.00
DEMOLITION OF EXISTING 10' X 10' BROKEN CONCRETE STONE OUTSIDE OF
DEMO PLA14 FOR YARD INLET REPLACEMENT OFCONCRETEI TCNEINGE-IN'S TOWIDEDGMANHOLE
$ 835,01
ECI MARKUP Q 5% ON CHANGES CF :;MP ADD ONLY $ 281,75
ADING
ITEM WEARTHWORK / GRADING ORK AND HAND GRADING NEXT TO THE BUILDING TIONAL SAND TO CURT AND GRADE
NEW SWALE
ECI FOR ADDITIONAL HAND/ SMJDLOADER GRADING FOR NEW SWALE AND ALONG
BUILDING DUE TO GRADING RE VISICNS AFTER EARTHWORK SUB MOBILIZED
EARTHWORK EQUIPMENT OFF THIS SITE $ 1,743..84
ADDITIONAL SURVEYING/ LAYOUT OF GRADING REVISIONS 365.00
,ECI MARKUP 6 15% ON CHANGE°
316.33
TOTAL,, TFI ) REQUEST $ -�} , S� 5� •� 3
SCHEDULE IMPACT T B,p�DAYS TO DATE Accepted:
Contractor
City of Ft. Collins Facilities Date
REck Coulter, Project Superintendent Date
Environmental Concerns, Inc.
FACILITIES
No•8238 PP. 19/19
JeP,18. 2002 10;55AM
09/18/2002 08:20 9702216534
REQUEST for CHANGE
CSU TRANSIT CENTER
PROJECT:
TO: CITY OF FT. COLLINS FACILITIES
117 N. MASON STREET
FT COLLINS, CO 80522
ATTN: STEVE WHITE
RFC #10 (REVISED 9/12102 TO INCLUDE CURVED HANDRAILS)
ITEM # 1-0EMO WEST CURB AT SERVICE DRNE, (:URE TO RECEIVE CONCRETE INLAY FOR SE56B 00 AROUND EXISTING
STEAM TUNNEL.
REM #1A- RE -WORKING OF EXISTING SUBGRADE ON'_AST SIDE OF SERVICE ORIvB DUE TO UNSTABLE CONDITIONS
ENCOUNTERED PRIOR TO POURING THE CONCRETE I3US PAVING. 1 S 389.59
$ 97,40
ENVIRONMENTAL CONCERNS, INC.
2526 E. Highway 402
P.O. Box 2135
Loveland, CO 80539
Phone: (970) 09-US I
Fax, (970) 669-6411
DATE: SepteMber 12, 2002
SUBJECT
ECI 5% MARKUP
SUBTOTAL ITEM 01 S At.99
ITEM # TUNNEL LID K CONCRETE
PAVING IN FOR US PAVINGATE POURS INCLUDING BONDING AGENT FOR ADHERING CONCRETE TO
STEAM
A).. POUR BACK MONOLRHIC CURB W/ PAVING (PAVING ALREADY INCLUDED IN BASE BID)
00�
-CURB ONLY..
B) ADD BONDING AGENT OVER STEAM TUNNEL, JOINT SEAL BOTH SIDS OF STEAM TUNNEL
COORDINATIONADTIONALLABOR AND O SANG OR 2 AE)DITIONAL POURS DUE TO UNFORSEEN
WITH $ 1,2W.00�
D).. ADD FIBERMESH TO T GONCRETE PAVING 51.100SF ®.21/SF $10,731.00�
S 80T 57
ECI 5% MARKUP
SUBTOTAL ITEM :p $ ilL658=97
rr CASS ADDSFIHANDRAILS
R INTHE Fl LD) AIRS (IN LIEU OF ADDING 4 HANDRAILS PER STAIR SECTION, WE ARE ADDING 3 AS APPROVED
By PROVIDED AND INSTALLED PER DETAIL SUPPLIED BY
A), ADD 6 NEW HANDRAILS FIELD MEASURED TO EMBED PLATES
COOVER CLARK AND ASSOcIATE:S. $ 5,421.00
B). CURVE 30 LF OF STAIR HANDRAIL
ECI 51A MARKUP
SOKEDULE IMPACT 5 DAYS TO DATE
Contractor
Rick Coulter, Project SUpedritendent Dab;
Environmental Concerns, Inc.
$ 450.00
§ 293.55
SUBTOTAL ITEM 03 S 6 16
Accepted:
City of Ft. Collins EadiitiEs Date
Sep•18. 2002 10:50AM
No,8238 P- 1/19
!L
Architects A Fanners A Landscapes i Interiors
455 Shannon Street, Suite 205,4 Denver, CO 80203
Phone:303-783.0040 AFax: 303-783-0060
webmail@ccover•clark-com
1.
Fax Transmittal
To: Steve White
From: Phaedra Lankutis
Fax: (970) 221-6534 Date: September 18, 2002
Phone: (970) 221-6273 _ Pages: 19
Re: RFC's
O Urgent ❑ For Review
-Comments:
Hello Steve,
Cc: file
0 Please comment 11 Please Reply ❑ Please Recycle
Here is the signed change order you sent roe. As I mentioned on the phone, we stand by the
recommendations as noted, but I have only noted this on the first page and didn't mark up the overall
amount, so that you can process as YOU see fit Please let me know 0 you need anything else.
Thankyou,
Phaedra Lankutis
J:2M1pheXll114- Kan CoMm Tr4WWP ReslSlever- LMC
Sep •18, 2002 10:53AM FACILITIES No,8238PAP• 9/19
09/18/2002 06:20 9702916534
City of Fort Collins
Page 2
were not shown on the approximate exisUrg conditions sheet C-1. We have discovered
ams not shown
through ut the that the sheet C-2that rdrawings doe are many tnot match the architecturalrawiingson sheet C-1 that ,forlthis
the fie
area- This is why we had numerous rede. igns for this area and is the additional work
shown for this RFC.
RFC #10, Item *20 - Add fibermesh to 8" colored concrete paving:he only
It was agreed that we would a plans weal or sheet ) C-3 nsdetail F 5 for thet
paving becausetcurb and lace
fibermesh was shown in the p
gutter. Fibermesh was not called out on detail #16 for the concrete pavement an was
not listed in the specifications for the concrete mix design.
' Due to the fact thatWe
couldthis no with the a�� eementt extendthat you frga eus to proceed ad no
choice but to compe
e and we have not bean
Some of the RFCs have been autsta-1. ee since going
to be consulted that they bete to bill
for this work. I suggest that if the engineer is going
included in all RFCs as they are presented to you.
n these RFCs so that we can
ne
aWe are requesting a final ction we need to take to resolve the1se current issues as wenaton still have otherrourtstandang
of fall classes.
RFCs to deaf with he
I feel that we ha\-'e done our part to complete a very difficult Project
starfionon time in order for buses to use the transit center
fonthadditional tfirst work that was
at CSU, We are requesting that we be oomp
requested by CSU and the City of Fort Collins on this project.
sincerely,
60atb—
Rick Coulter, General Supenntendent
Environmental Concerns, Inc,
RCac
Cc: Cass Beitler, CSU
Phaedra Lankutis, Coover-Clark
FACILITIES
No•8238PACP. 10/19
Seo.18. 2002 10;53AM
09/19/2002 02:20 9702216524
REQUEST for CHANGE
CSU TRANSIT CENTER
PROJECT:
TO: CITY OF FT. COLLINS FACILITIES
117 N. MASON STREET
FT. COLLINS, CO 80522
ENVIRONMENTAL CONCERNS, INC.
2526 E. Highway 402
P.O. Box 2135
Lgveland, CO 80639
Phone; (970) 669-6291
Fax: (270) 669-411
DATE: septernber 12, 2002
ATTN. STEVE WHITE `—
pI AND ELECTRICAL GRANGES 640
SUBJECT: RFC #14 SHELTER RE-0ESIG
ITEM # 1-ADDITIONAL DETAILING COSTS INCURRE D BY CDI SEE ATTACHED LETTER $ 5,94100
$ 297 05
ECI MARKUP @ 5% SUBTOTAL ITEM #1 $ 0,238.05
NO CHARGE
ITEM # 2- POLICARBONATE ROOF CHANGED r0 ; TANDING SEAM NO CHARGE
SUBTOTAL ITEM #2
ITEM # 3- ADD ONE NEW WINDSCREEN TO END CIF EACH SHELTER AND CHANGE $12 720 00
ALL WINDSCREENS FROM LEXAN TO PERFORATED $ 6.m.00
ECI MARKUP Cal 5Y0 SUBTOTAL ITEM #3 $13,356.00
ITEM #44NFO PANELS ARE NOW STAND ALONE S 7 830,00
A), MATERIAL CHANGES 820
B). CORE DRILLING AND PATCHBACK 01; COLORED CONCRETE FOR.00
$ $ 2,820 50
INSTALLATION $11,152.50
ECI MARKUP SUBTOTAL ITEM #4
ITEM # 5-CDI OVERTIME TO COMPLETE SHELTER BY END OF SEPTEMBER
ECI MARKUP Q 5%
:SUBTOTAL ITEM #5
$ 4,032.00
$ 201.60
S 4,233.60
ITEM # 0- ELECTRICAL REVISIONS S 507 R
A). RELOCATE UNDERGROUND GRC CDNDUIT FOR SIGN LIGHTS PER CASE BIETLE
$ 1,995..00
B), INSTALL WIRE AND CONDUIT TO LINK TRAFFIC GATES ON A T&M BASIS PERK O E WHIT
ECI MARKUP 5% SUBTOTAL ITEM #6 $ 2,62710
--
-PLEASE NOTE THAT W6 NEED AN IMMEDIATE APPP.OVAL TO PROCEED COORDINATION'IL FURTHER ON THESE SHELTERS.. UPON
R�EgUIOERT5EAN0 4aNERAL CONpSCHEDULED TO rt10N3 W CN a NOT NCL DE FFIC CIN THIS PONTRC ROP0.SA^'TEMPORARY FENCING
SCHEDULEIMPACT 0 0AY5.T0 DATE
Contractor:
Rick Coulter, Proleat Superintendent Date
Pnvironmental Concerns, Inc.
Accepted:.
City of Ft. Collins Facilities Date
FACILITIES
NO.8238 PAIP, 11/19
8ev.18. 2002 10:54AM
09/18/2002 08:20 9702216534
09/11/2o0E SPED 14:14 FA8 303 433 3002 CENTRAL DI]PPER,MONW0=5
CDI
September 11, 2002
Wuitcr
�� gp .&i CONCMZNS
Yra fataiwi 97"6y-6411
Re:Csu TRANW
D= Rick:
1@ 001/ 002
a4wrs Quelft
Sinee1947
i and d® below our ad&fion31 'Osts on this job to date.
Maqydesign chanS� e b xn :Wade tbxoilgh the course of the appzovS-�
which bave regt*cd 90=cm, sUlmnilial s Pmd have increased our detatling
additional ckarSes are broken out first:
A,ddial D
Extrabo==gdred! EI bm X S64.30 rate.- $5,401 Ozoludes ooerhead)
1G% profit: $540
Total'Iitis Chmgr- g$,941
o -� atz r:�F was ehan to staadin seam
No cbarge for this change
new wimdec a w:ied to the�end shelter & xU wince
m ncrlorated
�]�angced tromp— �s ardloly)
�Infbrmatioa panels are r:: stand-alone sad installed eP
D,tatarial: S12,720
beta to install: (nocharp)
Total this chancee$
= 2+
iak:.pan
Materials: a. �e noW d-atone C'c72
$2,620
li abcr TO Install: 051210
Total ad$ change: S7,836
Cgyritw,.DOVER Ixonwott"q INC.
4, AP5 Vox �rratar Derrvsa, COL'J&.f➢Uto 90216 (303) 4g3 also k'+X (s03) 4i3-'W2
www..irotrn0wutlu'a°�^
Sep •18. 2002 10:54AM FACTLTTIES No,8238 PA(P• 12/1Q
09/le/2002 09:20 970221GS34
i&OE/002
-09/11/2002 M 14:14 FAX 303 433 300E GFMI L xIIVn IR@t00R89
CDI
CD>c over time to eompl.tn sbeil:er to huCtU by end of 9epsember
Over -time hcra s nettled: 159 hrs
pv � rate: $21.45 2
Tot., tUf ehang
klcasa let me I.Wvr ii: you have any qu65�io,4•
ShicerelY,
Toni DuffieY
Pap two
SeP-18. 2002 10;54AM
09/18/2002 08:20 9702216534
FACILITIES
No•8238 PPP. 13/19
O9/04/ZO08 14:57 M 303 e665554
AITA MILLA 6LECiRIC CORP.
September 4, 2002
Alta 111%la 6latsric cony
bfr. Ted Johnson Tnc.
Environmental Concerns,
2526 E. Highway 402
P.O. Box 2135
Loveland, CO 80539
Th 001/ 001
Dear Ted=
Listed below are the cost :3reakdo,,ns for additional work
that has been completed -at the C513 Transit pro?
1. Relocate the undergrcuncl SRC Conduit for the sign lights
per KAS with Csu-
S
:358.00
Labor
25.00
Material
58,00
Rental/DJ£
66.00
Markup
Total.
Per
2. Lnstall conduit and 'airing for the automati c ;gate
Steve White.
Labor
Material
Rental/D.TZ
(Markup
Total
S1,307.00
$ 115.00
$ 312.00
$ 261,00
Please give sLe a call if you hac=_ any questions.
Sincerely,
Dean A. Grasser
1408 Ave.. Suite 101 tafayf , Colorado 80026 • (303) 666-6407 . FAX (303) 666-5554
SeP•18. 2002 10:54AM
09/18/2002 08:20 9702216534
FACILITIES No•B238 PAP. 14/19
Intl
September 12, 2002
City of Fort Collins
Attn: Steve White
117 N. Mason Street
Fort Collins, Co 80522
RE: CSU Transit Center
Construction
Athletic Complexes - Parks , Trails
2526 E, Hwy A02
Po Box 2136
Loveland, Colorado 80539
Phone (970) 669-6291
Fox (970) 669-6411
Metro (303) 530•7660
Dear Steve:
Listed below are outstanding RFG's that we have not received work directives or
change orders for. It is imperative that vie n receive a subs antirizapttio i nforofhhe p 1®ct work as sWe have
as
possible as we are nearing the comp
attached copies of these RFC's for your review-
1. RFC #3: per work directive #01-2002 $3,607.16
Re -align sidewalk and utility chang9s p
2. RFC #6=
Miscellaneous utility works
3_ RFC #7 (Revised•8112J02 to delete (1) yard inlet);
Revise yard inlet and add 12° CMF> drainage pipe.
4. RFC #10 (Revised 9/12/02 to include curved handrails):
bgrade on East
Demo West curb at service clrivEa, re -work existing bonding agent to side of service drive, pour back concrete paving U4 878 51
adhere concrete to steam tunnel lid, and add handrails to stairs.
Subtotal outstanding RFC's listed above to date: a41,2M .30
Please let me know the status of the approval of these RFC's as soon as possible.
Sincerely,
4d6 �.iJ�"i'
Rick Coulter, General Superintendent.
Environmental Concerns, Inc.
RC;tc
Pnrinsures
SeP,18. 2002 10 5 4 A M
09/18/2002 08:20 9702216534
REQUEST for CHA GE,
CSU TRANSIT C-FNTF-R
pROJHCT`
TO, C1iY OF FT. COLLINS FACILITIES
117 N. MASON S 1 REED
FT. COLLINS. GO 911522
FACILITIES
BMIjRONUEWAL CORCERH
ZUS fi. ftbway 402
P.O. Box 21w,
Iavaba>a, co gow
Photto_ (970) PS-62=1
F0. (sm ggg.e414
I)ATi~ August 12, 2002
No.8238 PAY, 15/19
aTTN: STEvE Wlil is= CI kp,NGE3 PER W
sueaPcr RFC #3 RE.ALIGN StDONALK All" MLrTy02
AtREC7N p- , WQ2 TKN--
f_ UTy 00T- CT46'%:iT'RS FER p> U1SE0 $K 7 OF AYA SG 1,174.32)
f1EM 1- CF�Za 29 FA Ii 97FEA AND
iTerA €2• pKavIjDf APoMO"AL CONCRETE FLA1V✓ORK PER REVISED DE
W 9ED AF2£AS
THIi;MNM APRON FROM ORIGINAL P1.4DIs: $ S� SF
a' SCORED AtO `rf414EO CONCRETE
AOD 4105E OE 4' X CONCRETE @ S 9-491 SF $ 835.17
ADD eesf Of
8" x 8' gCOR� AND STAR)E1� C-4 DE i ASS
ORJGINAI JUNCTION B<7XE:3 AS SHQ'NN ON OAJGINPL PLAN SH"�
rmm #'5- SuBSTIT 1 CATCH BAS1N 14ET
z5 & 25 PROV105 R�5W .IUHC�nON BW OM9Q 1NL�
3 7.2h4-00
ADO FROM ORIGINAL (S 4,147.50)
CPW T ORpm(AL JUNCWN V'X
CWfr OWGI oI LL-r ,
NET ADD SUN N
SOVA
sci 5% mtKUP AN BOXmi
$
� 112.84.no
a
SUBTOTAL- OW S 1 ,34L,00
NF
PROVIDE RSVOED JtyNCTION BOY."�' COMBO S (LEi! CATCH BP8 S g,W-00
AOD FROM ORiom1AL (S 047.50)
(S2 55�1j
CREpiTOitICxII'1AI-JUNC-'IOr eCX
C?Mrr 01RIGIMAL 1NLF� .r S 34.10
NEC APO Jjj"CTIDN 607 s
ECI 5%MAFWJP ON BoX
SUgTOTAL"T �
DEMO & sEC"E mSTING ,'CH BIZAN (WAS TO RAN IN PLACE) S
rf�M �rISE 26" RCS $cnvu9>:o ETCH $
qPD TLF OF 2#.
CO'ATRdLSO ON PAGRT*o
716..10
541.04
S•e;.18. 2002 10:55AM
09/18/2002 08:20 970221GS34
FACILITIES
1EC:C
No•8238'-'P, 16/19
CONTINUED FROM PAGE DNE
ffi+IN 5 ADD CONCRETE COLLARS �33 cUF;e INTO Smlr OF UND"RGROUND C'W PIPE PER WORK
nEM 4 rb£ D/C CNC4kNE 4� 20AF cos T= C = D'=TERMINED AS TFtERE IS ON C-OWG WORK
DIRECWttH THIS ITEM IM
AOJEC7lAA i�Eh1�y't Sli> INVESTIGATION AND CHANGE ORDER
C
ITEM or,p1,DIT10NAL P
N06S INTO THE PROJt:GT
ADMINISTRATIOWcOORDR3ATIONTOgVCORPCi 7ETHESE EL
G pFPROV ID :SIfC •• r AYs
acHWUL£ M P� £
AcCaP�;
t;orsactor _ —_~ �iiy of Ft, GalGrs padGHes
gu�niandent Da4:
Ride couvw, �° S, Inc.
ErnvWme I Conte
DM