Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 2205088 CHANGE ORDER 1�slsl r0 #,2�205088 CHANGE ORDER NO. PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.:I DESCRIPTION: 1. Reason for change: 6, wf�acl.._oQ 2. Description of Change: 1r)CrC-a-sx. -A-oy* C�fp Cos 3. Change in Contract Cost:'�JOI 2') — oY- 4�61, z,q 4. Change in Contract Time: AJ//-,- ORIGINAL CONTRACT COST $ 52176 00 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O.: _% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.=S: i ADJUSTED CONTRACT COST $ 61.2 C4 (Assuming all chanae ordersa approved) ACCEPTED BY: I� c DATE: Con ac s Re i entative ACCEPTED BY: DATE: _ of ct Manager REVIEWED BY DATE: 'y ��— _ T 1 t : Lc�/-Y✓z� G4�n �+� 6/Ld �+Mf c.t U APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 CC: Purchasing There is an original work order for $5470.00 from Walsh Environmental Scientists and Engineers dated 7/15/02. The work was to do lead and asbestos testing prior to demolition at 740 N. College. The $5470.00 was divided to $4000.00 under charge number 504243000.528180 and $1470.00 under 50450452503- 529290 on requisition 13413. Following completion of the testing is was determined that: 1. The cost for testing was going to be lower than $5470.00 2. There was asbestos requiring abatement and that we needed Walsh to create and work specification to get bids for the abatement work. Since the whole amount encumbered was not used I requested Walsh to do a revised estimate for the original proposal that was submitted by them (dated 7/27/02) and is an approximate cost for the original work of $3980.00. Walsh then submitted a proposal to create the Work Specifications/Summary dated 7/24/02 for $1450.00. This was placed under the same P.O. number as the original work. The actual costs from the original sampling project exceeded the $3980.00 approximated figure as it did not take into account some of the charges under in- house service/vehicle. The difference is a result of $101.24 from the invoice of $4081.24 and the approximate estimate of $3980.00. In total we got two services for $61.24 more than the cost of the original proposal.