Loading...
HomeMy WebLinkAboutBID - 5656 PAINTING CONTRACTOR ANNUALFort Collins Admim..-ative Services rurcnasmg vivision CITY OF FORT COLLINS INVITATION TO BID BID #5656 PAINTING CONTRACTOR — ANNUAL BID BID OPENING: DECEMBER 21, 2001, 3:00P.M. (our clock) Sealed bids will be received and publicly opened at the office of the Director Of Purchasing and Risk Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80522, at the time and date noted on the bid proposal and/or contract documents. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522- 0580. Bids must be received at the Purchasing Office prior to 3:00p.m. (our clock), December 21, 2001. A copy of the Bid may be obtained as follows: Call the Purchasing Fax -line, 970-416-2033 and follow the verbal instruction to request document #25656. (The bid number must be preceded by a 2 when using the Fax -line.) 2. Download the Bid from the Purchasing Webpage, Current Bids page, at: www.fcgov.com/purchasing. 3. Come by Purchasing at 215 North Mason St., 2nd floor., Fort Collins, and request a copy of the Bid. Special Instructions All bids must be properly signed by an authorized representative of the company with the legal capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour set for closing. Once bids have been accepted by the City and closing has occurred, failure to enter into contract or honor the purchase order will be cause for removal of supplier's name from the City of Fort Collins' bidders list for a period of twelve months from the date of the opening. The City may also pursue any remedies available at law or in equity. Bid prices must be held firm for a period of forty-five (45) days after bid openings. Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained in the City's specifications initially provided to the bidder. Any proposed modification must be accepted in writing by the City prior to award of the bid. Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly identified by the bid number and bid name contained in the bid proposal. No proposal will be accepted from, or any purchase order awarded, to any person, firm or corporation in default on any obligation to the City. Bids must be furnished exclusive of any federal excise tax, wherever applicable. Ala LNurrn widsun aoeer • &na rioor • P.V. box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 Bidders must be properly licensed and secure necessary permits wherever applicable. Bidders not responding to this bid will be removed from our automated vendor listing for the subject commodities. The City may elect where applicable, to award bids on an individual item/group basis or on a total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities. Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision -making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity, favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight charges must be included in prices submitted on proposal. Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and not entered as separate pricing on the proposal form. Purchasing restrictions: your authorized signature of this bid assures your firm's compliance with the City's purchasing restrictions. A copy of the resolutions are available for review in the Purchasing Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions. Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and reported to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is not a collusive or sham bid. Bid results: for information regarding results for individual bids send a self-addressed, self -stamped envelope and a bid tally will be mailed to you. Bid results will be posted in our office 7 days after the bid ening. a B. O'Neill Il, CPPO, FNIGP ctor of Purchasing and Risk Management 2 CITY OF FORT COLLINS BID PROPOSAL BID #5656 BID OPENING: DECEMBER 21 2001 3.00001RM (our clock) WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR PAINTING CONTRACTOR - ANNUAL Bid PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS: Service Provider will supply experienced general painting to include: painting prep work, priming, painting, staining, and clear coat finishing for interior and exterior surfaces on new construction, alterations, repairs, and remodeling in commercial applications. Repainting and refinishing for same. The contractor will occasionally be required to work non-traditional hours, ie., hours other than 8:00 A.M. to 5:00 P.M., Monday through Friday; and weekends. The City of Fort Collins expects quality work which may exceed minimum industry standards. Needed services during the contract period will be requested through issuance of work orders. There is no guaranteed minimum amount of services to be ordered. No work order exceeding $50,000 will be issued. The City reserves the right to supply any or all materials. Service Provider to: A. Provide painting services as described above, as set out in specific work orders. B. Carry insurance levels and provide bonding as required in the attached Services Agreement. C. Clean-up the job site at the end of each day and at work completion. D. Move and re -set all furnishings such as desks, chairs, filing cabinets, etc. which interferes with doing the work. E. Use sufficient drop cloths and protective coverings for the protection of floors and furnishings. Protect mechanical, electrical, computer hardware and other sensitive components of the building from paint spray and sanding dust. F. Maintain a local telephone number, and must be able to be reached by telephone and facsimile transmissions during prescribed business hours. (8 hours per each 24 hour working period - Monday through Friday) Contractor will respond to all City non - emergency telephone transmissions in a reasonably prudent time. (Generally meaning within 24 hours on the next working day). G. Protect paint materials from fire and freezing. H. Any invoices received 45 days or more beyond job completion are subject to a penalty of 15% of the total amount. Any invoices received 60 days or more beyond job completion are subject to a penalty of 30% of the total invoice amount. The Contractor may be allowed a grace period by contacting the acting Project Manager prior to the original time expiration. 3 Keep a log consisting of the following information: 1.) building address and specific area where paint product was used. 2.) paint color samples and paint code numbers for all products being used on City work. 3.) MSDS information for all products used on City work. Store paint, in a product friendly environment, minimum amounts of left over products, for touch up and repair work, for a maximum time period of 18 months. 2. Workmanship and Materials: A. Work must be performed by skilled tradesman. B. All materials used shall be new or of sufficient condition to represent a quality application in the finished product. C. Cleanliness and congeniality are of the utmost importance when working around the customers employees who must generally remain on the job during construction. If there is a need for the contractor's trades people to address the customer's employees, it shall be done in a pleasant, business like manner. Foul language will not be tolerated when working around customer's employees. Inside air quality must not be compromised during construction without prior consent. The City Representative in charge of the project, must be notified before any construction materials, or material byproducts, are introduced into the surrounding air. D. Work must be evenly uniform in sheen, color, and texture; free from brush marks, sags, crawls, runs, or other defects detrimental to appearance or performance. E. Work must be done in a manner to prevent spattering or spilling over finished surfaces. F. Paints must have good flowing and brushing properties as to cure free of streaks or sags. G. Correct defects and deficiencies in surfaces which may affect quality finish. H. Remove all hardware from doors before painting or staining. Masking is unacceptable. 3. Bidder Qualifications: A. At least five (5) years consistent hands on experience in commercial painting applications. Must be able to demonstrate this through references. B. At least three (3) years experience in institutional, and/or industrial remodel projects where contractor's tradespeople have worked in close proximity to the customer's employees. Must be able to demonstrate this through references. C. Work must be performed by the contractor's payroll employees under the contractor's immediate supervision. Service Agreement Contractor must enter into the attached services agreement (SAMPLE) and provide the required insurance. This agreement is effective for one year from the date on the service agreement. At the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Pricing changes shall be negotiated by and agreed to by both parties and may not exceed the Denver - Boulder CPI-U as published by the Colorado State Planning and Budget Office. Written notice of renewal shall be provided to the Service Provider and mailed no later than ninety (90) days prior to contract end. 5. Work Order Procedure: A. All job estimates must be submitted on a unit price basis consistent with the prices established in the Methods of Award/Bid Schedule section. B. Contractor will invoice for all jobs completed on a unit price basis with the prices established in the Method of Award/Bid Schedule section, including appropriate mark up on materials. City will not pay more that 10% mark-up on items under $500.00 or more that 8% mark-up on materials over $500.00. Material invoices must be included with the billing invoices. The contractor may be required, by the City user Department Representative, to submit for review a breakdown of hours worked per man/day for journeyman and/or helpers on any project or item of work requested. C. Work order number must be included on the billing invoices. 6. Trip Charge: A. Minimum trip charge: $50.00 B. Trip charge does not apply to customary "new project' touch up work. C. Estimates for trip charges should be discussed immediately with the City Representative ordering the work. D. Any dispute over trip charges will ultimately be resolved based on the final decision of the actin( Contract Administrator for this contract. Hourly rates charged for work order under this agreement will be: A. Normal Hours (From —A.M. To _P.M.) $ Per Hour (Journeyman) $ Per Hour (Helper) B. Overtime Rates: $ Per Hour (Journeyman) $ Per Hour (Helper) Contractor Name U Schedule of Bid Prices for Most Common Painting Work: Normal After Hours Hours A. Interior Masonry, Plaster, or drywall surfaces -Prime &Finish coat: ($/S.f.) ($/S.f.) 1. Less than 5,000 sq. ft. $ $ 2. Between 5,000 and 10,000 sq. ft. $ $ 3. More than 10,000 sq. ft. $ $ B. Exterior Masonry, Plaster, or Wood Surfaces - Prime & Finish coat: 1. Less than 5,000 sq. ft. $ $ 2. Between 5,000 and 10,000 sq. ft. $ $ 3. More than 10,000 sq. ft. $ $ C. Prepare and Repaint Painted Interior Masonry, Plaster or Drywall Surfaces: 1. Less than 5,000 sq. ft. $ $ 2. Between 5,000 and 10,000 sq. ft. $ $ 3. More than 10,000 sq. ft. $ $ D. Prepare and Repaint Painted Exterior Masonry, Plaster or Wood Surfaces: 1. Less than 5,000 sq. ft. $ $ 2. Between 5,000 and 10,000 sq. ft. $ $ 3. More than 10,000 sq. ft. $ $ Normal After Hours Hours E. Prepare, Stain and Varnish Std. 3 Ft. New Wood Doors -- 2 Coats ($/door) ($/door) 1. 10 Doors or less $ $ 2. More than 10 Doors $ $ F. Prepare and Paint Std. 3 Ft. New Wood or Metal Doors -- 2 Coats 1. 10 Doors or less $ $ 2. More Than 10 Doors $ $ Contractor Name H Normal After Hours Hours ($/door) ($/door) G. Prepare and Paint Std. 3 Ft. New Wood or Metal Door Jambs -- 2 Coats I: J 1. 10 Doors or less $ 2. More than 10 Doors $ Prepare and Revarnish Std. 3 Ft. "Old" Interior Wood Doors - 1 Coat 1. 10 Doors or less $ 2. More than 10 Doors $ Prepare and Repaint Std. 3 Ft. "Old" Exterior Metal Doors - 1 Coat 1. 10 Doors or less 2. More than 10 Doors Material Costs: Cost Plus percent (maximum of 10%)for individual materials costing Less than $500. Cost Plus percent (maximum of 8%)for individual materials costing more than $500. 9. Method of Award: Award will be based upon (1) the most favorable total cost for the labor and materials requirement stated below and (2) the service provider meeting the requirements of the attached Services Agreement. Calculate the costs for the work listed below using values shown in paragraph 7. Work to be done during normal work hours except as noted. A. Paint 2,000 sq. ft. of new interior drywall ........ $ B. Repaint 8,000 sq. ft. of interior drywall ......... $ C. Paint 12,000 sq. ft. of new exterior masonry walls..... $ D. Prepare, stain & varnish four new wood int. doors (3 ft.) . $ E. Prepare and paint six new metal exterior doors (3 ft.)... $ Contractor Name 7 F. Prepare and revarnish eleven old wood int. doors (3 ft.).. $ G. Prepare and paint nine new wood door jambs (3 ft.)..... $ H. Repaint 9,000 sq. ft. of int. drywall outside norm. work hrs $ 16 Hours X $ (Normal Hourly rate for Journeyman) _ $ 5 Hours X $ (Overtime Hourly rate for Journeyman) _ $ TOTAL COST ALL WORK ITEMS $ Contractor Name Firm Name (Are you a corporation, DBA, Partnership, LLC, PC) Signature PRINTED NAME Title Address Phone/Fax 0