No preview available
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - CHANGE ORDER 1PROJECT TITLE: Downtown Streetscape - Phase III (Bid No. 5663) PROJECT NUMBER: 30533900.6 CONTRACTOR: MBI, Inc. CHANGE ORDER NUMBER: 1 n preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1.&2. See attached invoice for details 3. The contract cost will increase by $15,316.80 4. There will no change in contract time. ORIGINAL CONTRACT COST $286,300.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER $0.00 $15.316.80 TOTAL % OF THIS CHANGE ORDER 5.35% TOTAL C.O. % OF ORIGINAL CONTRACT 5.35% ADJUSTED CONTRACT COST $301,616.80 (Assuming all change orders approved) ACCEPTED BY: REVIEWD BY: APPROVED BY: APPROVED BY: cc: City Clerk Contractor Purchasing Project File DATE: -r �— v )ATE: S— 1y D Z DATE: S/�1//l%L DATE: 5 - Z.L- p2. narks $9,574.80 -T0 0)01. S29290, iOStormwater $5,742.00 -*13[Li I SiL(.( I'OZ 6-7-02 Downtown Streetscape -- Phase III Change Order Summary Change Order No: , 1 5/10/02 Parks Summary Original Difference Item Description Quantity Unit $/Unit Revised Quantity from Bid Remove and dispose of sidewalk pavers, setting bed & 4" 1 thick conc. slab 9945 SF $1.00 8889 -$1,056.00 Remove and dispose of sidewalk pavers, setting bed & 10" 2 to 12" thick conc. slab 0 SF $8.30 1056 $g 764 80 3 Structural fill 0 TON $25.50 42 $1,071.00 4 Traffic Control 0 DAY I 265.00 3 $795.00 SubTotal Net Change to Contract Amount $9,574.80 Stormwater Summary Item Description Original Quantity Unit $/Unit Revised Quantitv Difference from Bid 1 Modify 3 existing street inlets 0 LS $2,231.00 1 $2,231.00 2 Lower existing manhole 0 LS $2,981.00 1 $2,981.00 3 Traffic Control 0 DAY $265.00 2 $530.00 SubTotal Net Change to Contract Amount $5,742.00 Total Net Change to Contract Amount $15,316.80