HomeMy WebLinkAboutCHANGE ORDER - BID - 5680 KECHTER ROAD IMPROVEMENTSMAY-29-2002 WED 02:33 PM CFO ENG, FAX NO, 9702216378 P. 01
Change Order Form
PROJECT TITLE: Kechter Road Improvements Project e
PROJECT NUMBER: 30537000.6 (Sid #5680) W
CONTRACTOR: Gerrard Excavation (PO #2201852)
CHANGE ORDER NUMBER: 2 G
1. Reason for change. 2. Description of Change.
3. Change In contract cost. 4. Change in contract time,
1&2, See attached sheet for detail.
3. The contract cost will increase by $ 18,871.10
4. There will he no change in contract time,
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
$2,197,893.65
$14,521.66
$0.00
$18,871.10
0.86%
1.52%
$2,231,286.31
a
•n
X
z
0
to
rn
w
►
may
ACCEPTED BY: ^� �� ' � t_.—� DATE: �(� Zsrb �,
( C9nt .!%RepresentativgJ /
ACCEPTED BY:
REVIEWED BY:
t�nyn,cci�
ACCEPTED BY
APPROVED BY:
(Purchasing Agent over $30,000)
w: Contractor
Purchasing
Project File
DATE: �! r'°%C�b 7
DATE: 5•
DATE: S Z$ DZ
DATE:
MAY-29-2002 WED 02:35 PM CFO ENG, FAX N0, 9702216378 P. 10
CHANGE OkbER -•02d
KECHTER ROAD IMPROVEMENTS PROJECT
Gerrard Excavating
Extra time spent on installing storm sewer thru Ziegler due to
utility conrlicts,
- See attached submittal
Item
Gerrard Excavatin 345 excavator
Unit
6.5 hours
I Unit
Tolal
Garrard Excavatin Labor
$
160.00
$
1,040.00
Garrard Excavatin 950E Loader
11 hours
$
35.00
$
305.00
Carnes Services Traffic Control
2.5 hours
$
95.00
$
237.50
errar xcavattng 1 ove oa an supervision
1 LS
1 LS
$
977.60
396.02
$
$
977.60
TOTAI
395.02
Light and rower needed to connect to a vault in the intersection
of Ziegler and Kechter to placo a 10 foot duct bank along the
south side of Kechter. The elyplieal pipes were placed in the location
Light and Power needed to go.
Posted to Pay Estimate # 2
P. 11
MAY-29-2002 WED 02:35 PM OR ENG. FAX NO. 9702216378
MAY. 9.2002 i0147AM CEPRAPD EXCAVATING
Ge"44d
EXCAVATING INC.
1739 South County Road 13C
Loveland, 00 80537
Phone: (970) 869-1463
PAX: (970) 669.1964
S 10.6„e.
DATE: May 9, 2002
PROPOSAL #: 020513
SUBMTTTED'TO: Chy of Ft Collins
Attu; Eileen Bayens
JOB NAME: Kochtnr Road Improvements — Irrigation duu Ziegler Road
N0.547 P.4/7
Time spent to Install storm sewer thru Ziegler. Work could not continue because of utility
conflicts.
345 excavator. 6,5 hrs @ 160.00ft
Labor.11 hrs @ 35,00/hr
95OF loader; 2.51us @ 95.00/hr
'lie control per attached
15% overhead and supervision
TOTAL
$ I,040.00
$ 385.00
S 237,50
S 977.60
Subtotal $ 2,640.10
$ 396.02
S 3,036.12
See additional provislom, included as part of this proposal and to be made a part of the
contract.
Authorized Signatulrc_ 1_
IniolmZteg o d
MAY-29-2002 WED 02:35 PM CFC ENG.
MAY. 9,2002 10:47AM GERRARD EXCAVATING
r. CARNES SERVICE
13510 Notch County Road 7
WELLINGTON, COLORADO 80649
Phone (970) 568.3632
rax (970) 568.3165
BILL. T0:
Ge4tvd Pxc aVa* Wn
1730 S. County Road 13C
LoPelaad, CO 805d7
v&t2 it Net 35 ale 4WM2
,. �w ('fit A• b:-'/ VR':'.K'G'i, Yq..iM I
QUANTrTy ITEM GQBE• '.c..��„;,:��.:.. Q:
FAX N✓O�S99702216378 P. 12
7 P.5/7
BATE INVOICE NO,
412M 02331
RECEIVED MAY 03 20
SHIP TO:
lobi& FOCI Coli m
Kecltie'r'Rd•iCR7-CR9).i. ."`:�J+r'�,"'i,.•:
Per Bill/Quant
Pmj.o t bey 0"2
,�,.• .. F��y,?oeatelnv,PriliilVcjuatt,_,.,,,,:,......_. ,.,
Caw I Qd&
l
prnft
wmuwbprcs
34.69
34.69
1
614.15
h & Cons of Supamor Pa day per m
349N
30A
8
il •
UBBM
17,99
143.92
3,25
fWA
k80TlwsMvK0l
26"
97.72
s
a
Uw
1799
14392
3
fotmh
lag OT/SAlm'HoL
26.99
80.97
6
d
Imw
1799
107,94
6
tea
w Sign
1.79
10.74
20
lw'vw
" Cane w/&eL
029
17.80
TOTAL. I ;M''Q0
MAY-29-2002 WED 02:36 PM CFC ENG. FAX NO, 9702216378 P. 13
Ell ' C ANGE 4Rp�R
KECHTER ROAD IMPROVEMENTS PROJECT
Gerrard Excavating
Install 6" conduit for Poudre R1 School District
- Soo attached submittal -
The Fort Collins - Loveland Water District has requested that
the existing sarvicn (from a proposed Irrigation tap) be
replaced will, a now 3/4" service from the 12" main that w o
are installing with this project.
Posted to Pay Estimafe 8 2
FAX NO, 9702218378
P. 14
MAY-29-2002 WED 02:36 PM CFC ENG.
MAY. 9.2002 10:47AM GERRARD EXCAVATING
GEn�
EXCAVATING INC.
1739 South County Road 13C
Loveland, CO 80537
Phone: (970) 669-1463
FAX: (970) 669-1964
KAMNIA63
DATE; May 9, 2002
PROPOSAL #: 020511
SUBMITTED TO: City of Ft Collins
Attn: Eileen Bayens
IOR NAME: ICechter Road - Upsize conduit from 4" to 6"
• Install 200 LF of 6" conduit:
700 LF of conduit @ 9,451LF
■ Pipe size change 4" to 6"t
200 LF Q 1.80lLF
TOTAL CHANCl
$ 11890.00
$ 360,00
S 2112.50.00
NO.S47 P.7//
��✓G .@. � �zGtw+� 4..h a P�i`C�
See additional provisions, Included as part of this proposal and to be made a part of the
contraet. �- ,
Authorized Signature
UPRIZeCondult
MAY-29-2002 WED 02:33 PM CFO ENG, FAX NO, 9702216378 P. 02
G • AM 'ORD
KECHTER ROAD IMPROVEMENTS PROJECT
Ram OPWOFW�
Gerrard Excavating
Install a water tap for Dino Dilulio's property to the east of tho
ntomontary school. The price inctudos all work necessary
to install n 12x8 tap assembly with a blow off (fire hydrant) that meets
the Foil Collins - Loveland Wafer District specifications.
- See attached submittal -
' T7_ 1 I
This prnperly will require an 8" water servlcc that connects to the
FCLWD waterline when they develop in the near future. We decided
to make the conncclion at this time to prevent the developer from
cutting into Kechler Road. The FCLWD has approved their tap size and
location.
Posted to Pay Estimate # 2
MAY-29-2002 WED 02:33 PM CFC ENG, FAX NO, 9702216378 P. 03
,
G INC,
1739 South Countly Road 13C
Loveland, CO 80537
Phone; (970) 669-1463
FAX: (970) 669-1964
1.•iL' i73T.1T.T.!!1
DATE: May 1, 2002
PROPOSAL #: 020501
SUBMI1" rED TO: City of1.,t Collins
Attu; Hileen Bayous
.JOB NANM: Keebter Road - Puture 8" Water Line
• Install 12 x 8 tap assembly
• Install 40I.P of 8" pVC
Install one 8 X 6 reducer
• Install fire hydranr assembly
• Survey
• Mobilization
Lump Surn price
_1>kn
S 9,859.00
See additional provisions, included as part of this proposal and to be made a part of the
contract.
Authorized Signaturel"�'.
r11 h lm,Qinnl, Wor );_
MAY-29-2002 WED 02:33 PM CFC ENG,
EXCAVATING INC.
Phone: (970) 669-1463
Fi1X: (970) 669-1964
PROJECT %,w ,, -
FAX N0. 9702216378
P. 04
G-106
DATE
PAGE_.-._ _CF .`PAGES
u _
MAY-29-2002 WED 02t34 PM CFO ENG, FAX N0, 9702216378 P. 06
KECHTER ROAD IMPROVEMENTS PROJECT
„D-
Gerrard Excavating
Extend Ziegler road culverts.
See ottachod svbtn/dat -
N
Property on the 3outhwost corner of Ziegler Road and Kechter Road
has submitlod plans to DeVelopmont Review to develop
this irca, We coordinated with the developers to oxtond the pipe past
tho improvements lhoy will be required to mako.
i N O T
r'osted to F'ay Estimate # 2
MAY-29-2002 WED 02:34 PM CFC ENG, FAX NO. 9702216378 P. 06
MAY. 6,2002 11c47AM GERRARD EXCAVATING
Ge 406
EXCAVATING INC,
1739 South County Road 13C
Loveland, Co 80537
Phone: (970) 669-1463
FAX: (970) 669.1964
DATE: May 3, 2002
PROPOSAL #: 020504
SURNIMED TO; City of Ft Collins
Attn: Eileen Bayens
JOB NAM: Kechter Road
19 x 30 pipes at Ziegler;
Add headwall, survey, exeava4 on and backfill
Lump Stun Price
$ 3,260.00
M.429 P.2/2
Tt is assumed that the additional 45 LF of 19 x 30 MCP wiU ba added to the pmjest totals and the
FES scgdons will be deleted from the project totals and therefonro, are not included in the above,
See additional provisions, included as part of this proposal and to be made a pant of the
Contract
AtithOrfUd Signature�� 1 l c e Q t' X
19x30IMRCP
MAY-29-2002 NED 02:34 PM CFO ENG,
FAX NO. 9702218378 P. 07
1. G`HANGE 0Rbc '
KECHTER ROAD IMPROVEMENTS PROJECT
Garrard Excavating
Haul debris to landfill.
- See attached submittal -
Item
Gerrard Excavating 950F loader
Unit
/ Unit
I
Total
Gerrard Excavating_ Tandem
1 hour
$
g5.00
$
95.00
Gerrard Excavatin Dum Fees
3.5 hours
$
60,00
$
21p.00
errar xcavat ng o ver ea an supervision
1 LS
1 LS
$
$
100.20
60.78
$
$
100.20
TOTAI
60.78
REASON FOR CHARGE---- 771
Plank properly had debris that was in our easement that we wanted
to haul off.
H
Posted to Pay Estimate # 2
m
MAY-29-2002 WED 02:34 PM CFO ENG. FAX NO, 9702216378
MAY. 9,2002 10146AM GERRARD EXCAVATING
asv" _ "
EXCAVATING ING,
1739 South County Road 130
Loveland, CO 80637
Phone: (970) 669-1463
FAX: (970) 669-1964
DATE: May 9, 2007
PROPOSAL Il; 020512
SUBMITTED TO: City of Ft Collins
Attn: EileenBayeus �( -
JOB NAME: Keehter Road Improvements , Ip e's Residence
.Per verbal request from Ciaig, haul debris to landfill:
95OF loader: 1 br C3a 95.00/hr $ 95,00
Tandem; 3,5 hrs @ 60,00/hr $ 210.00
Dump fees (attached) $ 100.20
Subtotal $ 405.20
15 % overhead and supervision $ 60.78
TOTAL $ 465.99
NO.547 P,2i7
See additional provisions, included as part of this proposal and to be made a part of the
contract.
Authorized Signature7R-; 1 L
LuffaPt"Haul
MAY-29-2002 WED 02:34 PM CFO ENG, FAX NO. 97022IB378 P. 09
MAY, 9.200 10;46AM GERRARD EXCAVATING 0867 S. Tatt dill No. 02 419974 NO 547;ky P, 3/7
P 0 Box 1190, I
Fort Collins, CO 60522 OATS IN DATE QUf TIME 1114 L 00 VEiU= 80u
006664 GERRARp F:XCAVATIN(3INC 04/11102
1739 S COUNTY RD 13C
LOVELANO CO 80697
FORT COLLINS
Inbound - Charge tlekat
10,00 CU Y1 COMMERCIAL L 99 444Tv W 48.40 1.70 60,10
pone
Y`-
Fur 24 aiir laritimllittbimd0on, call 496.5770. 50.10
P�CdSCSyHfty9 sl0'W"tvhllq'1�1hq IandBq,
Thank you,
SIGNATURFAW--
$4"18, Taft Hill Rd, 02 42001S ROoky
P 0 Box 11Do,
Fcni C011lna, CO 80522 CATR IN oATa OUT TIME IN 'RME OUt ' VENICLt< ROLL OFF
0411t/02 KJV02 0:49 09;4g
005554 GFJitiAR10 EXCAVATING INC
1739 S COUNTY Rd 13C
LOVELAND CO 50537 FORT COLLINS
Inbound - Charge ticket
prr •'m!5J4�J.•,,,.,^Gfi1Pn RATE exteNSION .r,
TOTAL
1a.00 CU YOCOMMERCIAL LOOSE _ 4.84 46,40 1.70 50.10
76,0
Operating lieure� to k:30 W10n thru Sat.
For24-hour WWII Inkrrne6on, call 499-6770, 50.10
Plga'se erlva slow while In the Iandfli,
Thank you.
I I ")
SIGNATURE
14V14-
I