Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 5680 KECHTER ROAD IMPROVEMENTSMAY-29-2002 WED 02:33 PM CFO ENG, FAX NO, 9702216378 P. 01 Change Order Form PROJECT TITLE: Kechter Road Improvements Project e PROJECT NUMBER: 30537000.6 (Sid #5680) W CONTRACTOR: Gerrard Excavation (PO #2201852) CHANGE ORDER NUMBER: 2 G 1. Reason for change. 2. Description of Change. 3. Change In contract cost. 4. Change in contract time, 1&2, See attached sheet for detail. 3. The contract cost will increase by $ 18,871.10 4. There will he no change in contract time, ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) $2,197,893.65 $14,521.66 $0.00 $18,871.10 0.86% 1.52% $2,231,286.31 a •n X z 0 to rn w ► may ACCEPTED BY: ^� �� ' � t_.—� DATE: �(� Zsrb �, ( C9nt .!%RepresentativgJ / ACCEPTED BY: REVIEWED BY: t�nyn,cci� ACCEPTED BY APPROVED BY: (Purchasing Agent over $30,000) w: Contractor Purchasing Project File DATE: �! r'°%C�b 7 DATE: 5• DATE: S Z$ DZ DATE: MAY-29-2002 WED 02:35 PM CFO ENG, FAX N0, 9702216378 P. 10 CHANGE OkbER -•02d KECHTER ROAD IMPROVEMENTS PROJECT Gerrard Excavating Extra time spent on installing storm sewer thru Ziegler due to utility conrlicts, - See attached submittal Item Gerrard Excavatin 345 excavator Unit 6.5 hours I Unit Tolal Garrard Excavatin Labor $ 160.00 $ 1,040.00 Garrard Excavatin 950E Loader 11 hours $ 35.00 $ 305.00 Carnes Services Traffic Control 2.5 hours $ 95.00 $ 237.50 errar xcavattng 1 ove oa an supervision 1 LS 1 LS $ 977.60 396.02 $ $ 977.60 TOTAI 395.02 Light and rower needed to connect to a vault in the intersection of Ziegler and Kechter to placo a 10 foot duct bank along the south side of Kechter. The elyplieal pipes were placed in the location Light and Power needed to go. Posted to Pay Estimate # 2 P. 11 MAY-29-2002 WED 02:35 PM OR ENG. FAX NO. 9702216378 MAY. 9.2002 i0147AM CEPRAPD EXCAVATING Ge"44d EXCAVATING INC. 1739 South County Road 13C Loveland, 00 80537 Phone: (970) 869-1463 PAX: (970) 669.1964 S 10.6„e. DATE: May 9, 2002 PROPOSAL #: 020513 SUBMTTTED'TO: Chy of Ft Collins Attu; Eileen Bayens JOB NAME: Kochtnr Road Improvements — Irrigation duu Ziegler Road N0.547 P.4/7 Time spent to Install storm sewer thru Ziegler. Work could not continue because of utility conflicts. 345 excavator. 6,5 hrs @ 160.00ft Labor.11 hrs @ 35,00/hr 95OF loader; 2.51us @ 95.00/hr 'lie control per attached 15% overhead and supervision TOTAL $ I,040.00 $ 385.00 S 237,50 S 977.60 Subtotal $ 2,640.10 $ 396.02 S 3,036.12 See additional provislom, included as part of this proposal and to be made a part of the contract. Authorized Signatulrc_ 1_ IniolmZteg o d MAY-29-2002 WED 02:35 PM CFC ENG. MAY. 9,2002 10:47AM GERRARD EXCAVATING r. CARNES SERVICE 13510 Notch County Road 7 WELLINGTON, COLORADO 80649 Phone (970) 568.3632 rax (970) 568.3165 BILL. T0: Ge4tvd Pxc aVa* Wn 1730 S. County Road 13C LoPelaad, CO 805d7 v&t2 it Net 35 ale 4WM2 ,. �w ('fit A• b:-'/ VR':'.K'G'i, Yq..iM I QUANTrTy ITEM GQBE• '.c..��„;,:��.:.. Q: FAX N✓O�S99702216378 P. 12 7 P.5/7 BATE INVOICE NO, 412M 02331 RECEIVED MAY 03 20 SHIP TO: lobi& FOCI Coli m Kecltie'r'Rd•iCR7-CR9).i. ."`:�J+r'�,"'i,.•: Per Bill/Quant Pmj.o t bey 0"2 ,�,.• .. F��y,?oeatelnv,PriliilVcjuatt,_,.,,,,:,......_. ,., Caw I Qd& l prnft wmuwbprcs 34.69 34.69 1 614.15 h & Cons of Supamor Pa day per m 349N 30A 8 il • UBBM 17,99 143.92 3,25 fWA k80TlwsMvK0l 26" 97.72 s a Uw 1799 14392 3 fotmh lag OT/SAlm'HoL 26.99 80.97 6 d Imw 1799 107,94 6 tea w Sign 1.79 10.74 20 lw'vw " Cane w/&eL 029 17.80 TOTAL. I ;M''Q0 MAY-29-2002 WED 02:36 PM CFC ENG. FAX NO, 9702216378 P. 13 Ell ' C ANGE 4Rp�R KECHTER ROAD IMPROVEMENTS PROJECT Gerrard Excavating Install 6" conduit for Poudre R1 School District - Soo attached submittal - The Fort Collins - Loveland Water District has requested that the existing sarvicn (from a proposed Irrigation tap) be replaced will, a now 3/4" service from the 12" main that w o are installing with this project. Posted to Pay Estimafe 8 2 FAX NO, 9702218378 P. 14 MAY-29-2002 WED 02:36 PM CFC ENG. MAY. 9.2002 10:47AM GERRARD EXCAVATING GEn� EXCAVATING INC. 1739 South County Road 13C Loveland, CO 80537 Phone: (970) 669-1463 FAX: (970) 669-1964 KAMNIA63 DATE; May 9, 2002 PROPOSAL #: 020511 SUBMITTED TO: City of Ft Collins Attn: Eileen Bayens IOR NAME: ICechter Road - Upsize conduit from 4" to 6" • Install 200 LF of 6" conduit: 700 LF of conduit @ 9,451LF ■ Pipe size change 4" to 6"t 200 LF Q 1.80lLF TOTAL CHANCl $ 11890.00 $ 360,00 S 2112.50.00 NO.S47 P.7// ��✓G .@. � �zGtw+� 4..h a P�i`C� See additional provisions, Included as part of this proposal and to be made a part of the contraet. �- , Authorized Signature UPRIZeCondult MAY-29-2002 WED 02:33 PM CFO ENG, FAX NO, 9702216378 P. 02 G • AM 'ORD KECHTER ROAD IMPROVEMENTS PROJECT Ram OPWOFW� Gerrard Excavating Install a water tap for Dino Dilulio's property to the east of tho ntomontary school. The price inctudos all work necessary to install n 12x8 tap assembly with a blow off (fire hydrant) that meets the Foil Collins - Loveland Wafer District specifications. - See attached submittal - ' T7_ 1 I This prnperly will require an 8" water servlcc that connects to the FCLWD waterline when they develop in the near future. We decided to make the conncclion at this time to prevent the developer from cutting into Kechler Road. The FCLWD has approved their tap size and location. Posted to Pay Estimate # 2 MAY-29-2002 WED 02:33 PM CFC ENG, FAX NO, 9702216378 P. 03 , G INC, 1739 South Countly Road 13C Loveland, CO 80537 Phone; (970) 669-1463 FAX: (970) 669-1964 1.•iL' i73T.1T.T.!!1 DATE: May 1, 2002 PROPOSAL #: 020501 SUBMI1" rED TO: City of1.,t Collins Attu; Hileen Bayous .JOB NANM: Keebter Road - Puture 8" Water Line • Install 12 x 8 tap assembly • Install 40I.P of 8" pVC Install one 8 X 6 reducer • Install fire hydranr assembly • Survey • Mobilization Lump Surn price _1>kn S 9,859.00 See additional provisions, included as part of this proposal and to be made a part of the contract. Authorized Signaturel"�'. r11 h lm,Qinnl, Wor­ );_ MAY-29-2002 WED 02:33 PM CFC ENG, EXCAVATING INC. Phone: (970) 669-1463 Fi1X: (970) 669-1964 PROJECT %,w ,, - FAX N0. 9702216378 P. 04 G-106 DATE PAGE_.-._ _CF .`PAGES u _ MAY-29-2002 WED 02t34 PM CFO ENG, FAX N0, 9702216378 P. 06 KECHTER ROAD IMPROVEMENTS PROJECT „D- Gerrard Excavating Extend Ziegler road culverts. See ottachod svbtn/dat - N Property on the 3outhwost corner of Ziegler Road and Kechter Road has submitlod plans to DeVelopmont Review to develop this irca, We coordinated with the developers to oxtond the pipe past tho improvements lhoy will be required to mako. i N O T r'osted to F'ay Estimate # 2 MAY-29-2002 WED 02:34 PM CFC ENG, FAX NO. 9702216378 P. 06 MAY. 6,2002 11c47AM GERRARD EXCAVATING Ge 406 EXCAVATING INC, 1739 South County Road 13C Loveland, Co 80537 Phone: (970) 669-1463 FAX: (970) 669.1964 DATE: May 3, 2002 PROPOSAL #: 020504 SURNIMED TO; City of Ft Collins Attn: Eileen Bayens JOB NAM: Kechter Road 19 x 30 pipes at Ziegler; Add headwall, survey, exeava4 on and backfill Lump Stun Price $ 3,260.00 M.429 P.2/2 Tt is assumed that the additional 45 LF of 19 x 30 MCP wiU ba added to the pmjest totals and the FES scgdons will be deleted from the project totals and therefonro, are not included in the above, See additional provisions, included as part of this proposal and to be made a pant of the Contract AtithOrfUd Signature�� 1 l c e Q t' X 19x30IMRCP MAY-29-2002 NED 02:34 PM CFO ENG, FAX NO. 9702218378 P. 07 1. G`HANGE 0Rbc ' KECHTER ROAD IMPROVEMENTS PROJECT Garrard Excavating Haul debris to landfill. - See attached submittal - Item Gerrard Excavating 950F loader Unit / Unit I Total Gerrard Excavating_ Tandem 1 hour $ g5.00 $ 95.00 Gerrard Excavatin Dum Fees 3.5 hours $ 60,00 $ 21p.00 errar xcavat ng o ver ea an supervision 1 LS 1 LS $ $ 100.20 60.78 $ $ 100.20 TOTAI 60.78 REASON FOR CHARGE---- 771 Plank properly had debris that was in our easement that we wanted to haul off. H Posted to Pay Estimate # 2 m MAY-29-2002 WED 02:34 PM CFO ENG. FAX NO, 9702216378 MAY. 9,2002 10146AM GERRARD EXCAVATING asv" _ " EXCAVATING ING, 1739 South County Road 130 Loveland, CO 80637 Phone: (970) 669-1463 FAX: (970) 669-1964 DATE: May 9, 2007 PROPOSAL Il; 020512 SUBMITTED TO: City of Ft Collins Attn: EileenBayeus �( - JOB NAME: Keehter Road Improvements , Ip e's Residence .Per verbal request from Ciaig, haul debris to landfill: 95OF loader: 1 br C3a 95.00/hr $ 95,00 Tandem; 3,5 hrs @ 60,00/hr $ 210.00 Dump fees (attached) $ 100.20 Subtotal $ 405.20 15 % overhead and supervision $ 60.78 TOTAL $ 465.99 NO.547 P,2i7 See additional provisions, included as part of this proposal and to be made a part of the contract. Authorized Signature7R-; 1 L LuffaPt"Haul MAY-29-2002 WED 02:34 PM CFO ENG, FAX NO. 97022IB378 P. 09 MAY, 9.200 10;46AM GERRARD EXCAVATING 0867 S. Tatt dill No. 02 419974 NO 547;ky P, 3/7 P 0 Box 1190, I Fort Collins, CO 60522 OATS IN DATE QUf TIME 1114 L 00 VEiU= 80u 006664 GERRARp F:XCAVATIN(3INC 04/11102 1739 S COUNTY RD 13C LOVELANO CO 80697 FORT COLLINS Inbound - Charge tlekat 10,00 CU Y1 COMMERCIAL L 99 444Tv W 48.40 1.70 60,10 pone Y`- Fur 24 aiir laritimllittbimd0on, call 496.5770. 50.10 P�CdSCSyHfty9 sl0'W"tvhllq'1�1hq IandBq, Thank you, SIGNATURFAW-- $4"18, Taft Hill Rd, 02 42001S ROoky P 0 Box 11Do, Fcni C011lna, CO 80522 CATR IN oATa OUT TIME IN 'RME OUt ' VENICLt< ROLL OFF 0411t/02 KJV02 0:49 09;4g 005554 GFJitiAR10 EXCAVATING INC 1739 S COUNTY Rd 13C LOVELAND CO 50537 FORT COLLINS Inbound - Charge ticket prr •'m!5J4�J.•,,,.,^Gfi1Pn RATE exteNSION .r, TOTAL 1a.00 CU YOCOMMERCIAL LOOSE _ 4.84 46,40 1.70 50.10 76,0 Operating lieure� to k:30 W10n thru Sat. For24-hour WWII Inkrrne6on, call 499-6770, 50.10 Plga'se erlva slow while In the Iandfli, Thank you. I I ") SIGNATURE 14V14- I