Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - P816 PROSPECT ROAD IMPROVEMENTS (8)John Stephen - Prospect Road Proposal From: Maryam Babaki<mbabaki@lorisandassociates.com> To: "'jstephen@fcgov.com"' <jstephen@fcgov.com> Date: Fri, Dec 14, 2001 11:42 AM Subject: Prospect Road Proposal John, Thank you for taking my questions 1. What is the current classification of Prospect Road (Minor Arterial, Major Arterial)? Is the ultimate improvement aimed at improving design speeds and upgrading the classification of the roadway? If so, what design speed and classification? 2. Do you have any information on current ADT for Prospect Road? 3. When do you expect the current hydraulic study for the Poudre River to be complete, and hydraulic recommendations made available? 4. Based on the proposed typical sections for Prospect Road ( 70-foot roadway + 50-foot buffer on each side), it appears the limits of the survey should be about 85 feet on each side of the center line. Do you find this adequate (for survey fee estimating purposes)? Thank you. Maryam Babaki, P.E. Loris and Associates, Inc. 5775 Flatiron Parkway, Suite 207 Boulder, CO 80301 Tel: (303) 444-2073 Direct: (303) 444-2013 x17 Fax: (303) 444-0611