HomeMy WebLinkAboutRESPONSE - BID - 5669 STUMP GRINDINGADDENDUM BID SCHEDU E
Bid #5669 Stump Grinding
City reserves the right to a and to more than one contractor depending on price and ability to
complete the work by April 1' 2002.
1. Cost per inch for str t stumps to grind, fill the hole with chips/soil and haul excess away.
`� �F` 6
$ per]inch X 2709 inches = $ Total
2. Cost per inch for par stumps to grind, haul excess anb fill stump cavity with approved soil.
$—I-/ LO _,_perk inch X 628 inches = 2 da
$_..�CiQ�,.,.� Total
3. Cost per inch for ce4etery stumps to grind with no clean Iup
Ll i
$_ __.peril inch X 200 inches = $ �y. ~a6 Total
// GRAND TOTAL
FIRM NAM P
Are yo a Co oration, Partnership, DBA, LLC, or PC
SIGNATURE
ADDRESS /010 In%'s
# (Vo
/) SP
- L/Y))
-7 -7UI
2gol