Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5669 STUMP GRINDINGADDENDUM BID SCHEDU E Bid #5669 Stump Grinding City reserves the right to a and to more than one contractor depending on price and ability to complete the work by April 1' 2002. 1. Cost per inch for str t stumps to grind, fill the hole with chips/soil and haul excess away. `� �F` 6 $ per]inch X 2709 inches = $ Total 2. Cost per inch for par stumps to grind, haul excess anb fill stump cavity with approved soil. $—I-/ LO _,_perk inch X 628 inches = 2 da $_..�CiQ�,.,.� Total 3. Cost per inch for ce4etery stumps to grind with no clean Iup Ll i $_ __.peril inch X 200 inches = $ �y. ~a6 Total // GRAND TOTAL FIRM NAM P Are yo a Co oration, Partnership, DBA, LLC, or PC SIGNATURE ADDRESS /010 In%'s # (Vo /) SP - L/Y)) -7 -7UI 2gol