CHANGE ORDER NO. 1
PROJECT TITLE: Cache La Poudre Master Drainage Plan Revisions
CONTRACTOR: Owen Ayres do Associates, hrc.
P.O. NUMM , M7170
VENDOR NUMBER 102630
CHARGE NUMBER: 50452812.528180.3
DESCRIPTION
In preparing change orders show inorder as separate numbered paragraphs the
following:
1. Reason for change. 2. Deacriptiori of change.
3. Changa in contrdot cost. 4. Change in contract time
1. Additional work requested by the City beyond the o»ginal Scope of Work
2. Identify 50-year level of pl+otection.
3. Six -Thousand Nine Hundred Seventy -Six Dollars ($6,976.00)
4. Six Weeks.
Attach additional sheets as
ORTaNAL CONTRACT COST
TOTAL APPROVED CfiANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
ACCEPTED BY:
RBVMWED DY:
Manager)
S47 808.00
$0.00
$0.00
S6.976.00
S54.784.00
DATE: 5 O�
DATE: 3 p 2—
APPROVED BY: V-/,1!04 R C-1f) C* . DATE: 3- ' o t
(Fort Collins thilities General Manager)
APPROVED BY: DATE:
(Purchasing ASS Over $15.000)
CC: City CIO& Purchasing NOTE: SWML%m of Contractor indicates
Contractor Project File agreement horewithim, inehrding any adjustment
StormwxW Finance Manager in contract sum or Contract time.
lb 002
P. 02
�_S_
ASSOCIATES
March 5, 2002
Mr. Bob Smith
City of Fort Collins Water Utility
P.O. Box 580
Fort Collins, Colorado 80522
Re: Cache La Poudre River Master Drainageway Plan Revisions —
50-Year Flood Damage Assessment
Dear Bob,
Per your request, we have considered the level of effort necessary to evaluate the flood
damages associated with 50-year flood event, assess improvements required to mitigate
damages, and add a brief discussion to the Master Drainageway Plan documents. Following is
our proposed scope of work, cost estimate, and schedule to compete this task.
SCOPE OF WORK
Revisions to the Draft Cache La Poudre Master Drainageway Plan (MDP) have been addressed
under a previous task order and the final draft of the MDP is currently being prepared. The
objective of this supplemental task order is to add additional information to the MDP addressing
estimates of damages associated with the 50-year flood and the cost for improvements that are
needed to mitigate the 50-year damages. A summary of the tasks required to complete the 50-
year flood damage assessment is as follows:
Evaluate 50-year damages for FDRs — Using the existing MDP hydraulic model and EAD model
results, flood damages will be evaluated at each of the Flood Damage Reaches (FDRs)
identified in the MDP.
Determine 50-year improvements - One -hundred year flood improvements identified in the MDP
will be modified to provide a 50-year level of protection for the affected FDRs.
Estimate 50-year improvement costs — Once the 100-year improvements have been modified,
the cost estimates will be revised to reflect the 50-year improvements.
Meet with City to discuss results — Ayres Associates project manager will meet with City staff to
discuss the results of the 50-year flood damages and improvements.
Summarize results in Master Drainageway Plan and Executive Summary — The results of the
assessment will be summarized and incorporated into the MDP documents.
SMITH-3.DOC
8.32
Mr. Bob Smith
Page Two
March 5, 2002
COST ESTIMATE
Our total estimated cost to complete the tasks described above, as shown by Attachment 1, is
$6,976.00.
SCHEDULE
The final MDP including the 50-year flood assessment discussions will be submitted within 6
weeks following approval of this task order.
If you have any questions please give me a call at (970) 223-5556
Sincerely,
Owen Ayres & Associates, Inc.
Scott A. Hogan, P.E.
Project Manager, Hydraulic Engineering
SAH:sp
Enclosure
SMITH-3.DOC
8.32
ATTACHMENT
Ayres Associates - Fort Collins
Professional Services Estimate
Project: Cache La Poudre River Master Drainageway Plan Revisions
50 year flood damage assessment
Date Prepared: 3/5/2002
By: Scott Hogan
Task Identification
Project
Manager
$85.00
Project
Engineer
1 $75.00
Word
Processor
1 $45.00
LaborCost
DiroctCosts
Total
by
Task
Evaluate 50-year flood protection
Evaluate 50-yr damages for FDRs
2
14
$
1,220
$
121
$
1,341
Determine 50-year improvements
3
40
$
3,255
$
330
$
3,585
Determine improvement costs for FDRs
1
8
$
685
$
68
$
753
Summarize results and add information
into Master Plan and Executive
Summary
4
8
2
$
1,030
$
85
$
1,115
Meet with City to discuss results
2
$
170
$
11
$
181
TOTALS
12
70
2
$
6,360
$
616
$
6,976
Administrative Services
Purchasing Division
March 12, 2002
Scott Hogan, P. E.
Project Manger
Owen Ayers & Associates Inc
P. O. Box 270460
Fort Collins, CO 80527 0460
RE: Cache La Poudre River Master Drainage Plan Revisions
Dear Mr. Hogan:
Enclosed please find your copy of the signed Change Order for the above -mentioned matter.
Sincerely,
am B. O'Neill II, CPPO, FNIGP