Loading...
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - LETTER TO JASON STUTZMAN01/17/2002 THU 12:00 FAX 970 221 6586 CITY OF FT COLLINS CLRS 01-11-02 06:54AM FROM - IaOO2/00a T-065 P.02A4 F-000 January 11, 2002 Mr. Jason Stutzman City of Fort Collins Parka Planning Department 216 N. Mason St. Fort Collins, Colorado 80521 RE: City Park Boardwalk Structural Engineering Dear Mr. Stutzman: J.R ENGINEERING ei.nm.ac aVrca.'" ThanK you for meeting with me at your office this week. JR Engineering (JR) was requested by the City of Fort Collins to perform structural design of an elevated boardwalk for proposed improvements at the City Park pond - Our deliverables will include: Structural design of the boardwalk and foundation. • Structural details certified by a Colorado Registered Professional Engineer • P.E. - Certified Structural Calculations (if required) Cost estimates (value engineering) of two ditferent foundation alternatives Survey Data and a Geotechnical report will be provided by the City. Tasks and design fees have been broken down into separate lump sum costs as follows: Basic Plan layout of Boardwalk ..................................... ............ .... $824.00 Foundation Options Cost Estimates / Value Engineering .......................$592.00 Structural Engineering Caloulations...................... ............................. $1,360.00 Donated Product Coordination & Associated Specifications ................. $464.00 Structural Plan Drafting .............. ... ---- ............................................ $1,264.00 Minor Calc. & Plan Revisions per City Review Comments .....................$552.00 Structural Specifications ...............................................................$932.00 A budget spreadsheet detailing the hours per each of the above tasks has been atrached for your information_ Additional meetings at the City's offices and/or on site and construction services have not been included in the above costs and will be billed on a Time and Materials basis. P07498 6010 Cr en..ead Ph.a .,_ . v:t11, �WOa V.tlnF CCJ 84) ) 303.74o4m c has: A5.721 J019 • www-jry a aai,My.xvu 01/11/2002 THU 12:00 FAX 970 221 6586 CITY OF FT COLLINS CLRS IM003/005 01-11-02 06:54AM FRW- T-055 P.03/04 F-581 Mr Jason Stutzman January 9, 2002 Provisions in the current master contract between the City and JR Engineering shall apply to this project. Please review the above and call with any questions. If acceptable, please sign and return one copy for our files to authorize us to begin work, You may line out any tasks you wish to delete from our scope of services_ We look forward to working with you. Respectfully submitted, JR ENGINEERING John J. Migliacc , PE Project Manager Structural Engineering ACCEPti BD BY: pate: P0740