January 11, 2002
Mr. Jason Stutzman
City of Fort Collins
Parka Planning Department
216 N. Mason St.
Fort Collins, Colorado 80521
RE: City Park Boardwalk Structural Engineering
Dear Mr. Stutzman:
J.R ENGINEERING
ei.nm.ac aVrca.'"
ThanK you for meeting with me at your office this week. JR Engineering (JR) was
requested by the City of Fort Collins to perform structural design of an elevated
boardwalk for proposed improvements at the City Park pond -
Our deliverables will include:
Structural design of the boardwalk and foundation.
• Structural details certified by a Colorado Registered Professional Engineer
• P.E. - Certified Structural Calculations (if required)
Cost estimates (value engineering) of two ditferent foundation alternatives
Survey Data and a Geotechnical report will be provided by the City.
Tasks and design fees have been broken down into separate lump sum costs as
follows:
Basic Plan layout of Boardwalk ..................................... ............ .... $824.00
Foundation Options Cost Estimates / Value Engineering .......................$592.00
Structural Engineering Caloulations...................... ............................. $1,360.00
Donated Product Coordination & Associated Specifications ................. $464.00
Structural Plan Drafting .............. ... ---- ............................................ $1,264.00
Minor Calc. & Plan Revisions per City Review Comments .....................$552.00
Structural Specifications ...............................................................$932.00
A budget spreadsheet detailing the hours per each of the above tasks has been
atrached for your information_
Additional meetings at the City's offices and/or on site and construction services have
not been included in the above costs and will be billed on a Time and Materials basis.
P07498
6010 Cr en..ead Ph.a .,_ . v:t11, �WOa V.tlnF CCJ 84) )
303.74o4m c has: A5.721 J019 • www-jry a aai,My.xvu
01/11/2002 THU 12:00 FAX 970 221 6586 CITY OF FT COLLINS CLRS IM003/005
01-11-02 06:54AM FRW- T-055 P.03/04 F-581
Mr Jason Stutzman January 9, 2002
Provisions in the current master contract between the City and JR Engineering shall
apply to this project.
Please review the above and call with any questions. If acceptable, please sign and
return one copy for our files to authorize us to begin work, You may line out any tasks
you wish to delete from our scope of services_
We look forward to working with you.
Respectfully submitted,
JR ENGINEERING
John J. Migliacc , PE
Project Manager
Structural Engineering