Loading...
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - QUOTEJan•11. 2002 11:22AM ALLER LINGLE ARCH No-8934 P. 2/6 ED* 748 WHALERS WAY • BLDG E. SUITE 200 • FORT COLLINS . COLORADO 80525 . (970) 223-1820 Revised January 11, 2002 Mr. Steve Seefeld City of Fort Collins Operation Services P.O. Box 580 Fort Collins, CO 80522 RE: Proposal for Phase I Master Planning and Schematic Design Police Services Remodel of the Ricker Brothers Building City of Fort Collins. Colorado Project No. 0141.13 Dear Steve: Alle►•Lingle Architects P.C. is pleased to provide you with this revised Proposal for master planning and schematic design services for remodeling the Ricker Brothers Building for Police Services. In response to our meeting of December 12, 2001, Phase I Scope of Work developed by Wendy Irving -Mills, and your revised Scope of Work memo dated January 8, 2002, we propose the following scope of services and associated fees: Project Description Remodeling of the Ricker Brothers Building, 200 N. Howes Street, in downtown Fort Collins for use by the Investigative Services Division of Police Services. Uses to be relocated from 300 W. LaPorte Avenue and the Police Annex buildings will include the following: Investigative Services: 8,500 net sq. ft. Evidence Storage: 2,300 net sq. ft. for for support services. Found Items and Bicycles: 1,500 net sq. ft. Fitness Area: 4,750 net sq. ft. Scope of Basic Services The Scope of Basic Services shall be as follows: high -density storage plus 500 net sq, ft. Phase I 1. Site Survey: Site survey to locate the existing building on the site and identify available utilities and connections to the building. Show site improvements and topography at one - foot intervals. Show any easements or other restrictions to the site. 2. Field Measurements: Field measure the existing building and develop full existing condition floor plans in CAD format. Include locations and capacities of electrical, mechanical, plumbing and teledata systems and components. Jx-11 . 2002 '1;22AM ALLER LINGLE ARCH No.8934 P. 3/6 Police Services Remodel of the Ricker Building Page 2 3. Code Analysis: Perform a conceptual code review to determine the renovations necessary to have the building and site comply with current building and zoning codes for the new uses. 4. Planning Approval Process: Determine the level of Development Review necessary for implementing this project (i.e. Type 1 or Type 2), and determine what documents will be needed for that particular development review process. Develop a schematic site plan to show the improvements required for the Development Review Process, and submit for a Conceptual Review meeting with the City of Fort Collins. 5. Master Planning and Schematic Design: Master Planning and Schematic Design shall run concurrently. Develop a building Master Plan and a subsequent Schematic Design floor plan based on Operation Services' and Police Services' input. Begin master planning by showing the approximate locations and areas of the various uses in 'bubble -diagram" format, progressing into architectural floor plans, including electrical, mechanical, plumbing and teledata plans to identify the upgrades needed to existing systems. Show potential phasing, if needed to fit within funding constraints. Anticipate developing up to two (2) design options for review by the customer in the Master Planning stage, prior to selection of a final master plan, and up to two (2) options in Schematic Design. Anticipate up to five (5) meetings with the customer (one to review master plan options, one to review proposed schematic options, one to review revised options, one to review the final approved plan and the cost estimate, and one to obtain direction to move into Design Development). Only one (1) completelCity review will be done at the end of Schematic Design. 6, Cost Estimating: Develop a schematic cost estimate for the site work and building remodel, based on the plans reviewed and approved by Police Services and Operation Services. Work Not Included 1. Planning, landscape architecture and other related services for taking the Ricker Building site plan through a Type 1 or 2 Preliminary Development Plan or other site plan approval process with the City of Fort Collins. 2. Phase 2 architectural, structural, civil, mechanical/plumbing, electrical and taledata design and engineering services for Design Development, Construction Documents, Bidding/Negotiation and Construction Administration phases of the project. 3. CAD -generated 3-D renderings or models of the approved Schematic Design phase solution. 4. Identify design elements where it might be co%t effective to implement substainability goals of the 1998 City of Fort Collins/Facility Services' Green Building Criteria above and beyond the prerequisites required for all projects. This will be implemented in the Design Development and Construction Documents phase of the project. Owner -Provided Information 1. Plats or other site plan documents for Block 32, including existing GIS CAD files, Civic Center Master Plan and other relevant documents. 2. As -built or any other drawings of the Ricker Building layout, if available. Jan,ll, 2002 11:23AM ALLER LINGLE ARCH No.8934 P. 4/6 Police Services Remodel of the Ricker Building Consultants AllereLingle Architects P.C. proposes the following consultants for this project. Surveying Nolte Associates Rob Van Uffelen 1901 Sharp Point Drive, Suite A Fort Collins, CO 80525 (970) 221-2400 Mechanical Engineering Abrahamson Engineering Roger Abrahamson, P.E. 3101 Kintzley Court, Unit D LaPorte, CO 80535 (970) 221-2569 Electrical Engineering Electrical Systems Consultants Mike Welenc/Randy Bremmer 212 W. Mulberry Fort Collins, CO 80521 (970) 224-9100 Cost Consultant B&C Project Services Bill Kraus, P.E. 4500 Bluefin Court Fort Collins, CO 80525 (970) 206-0947 Page 3 Fees AllereLingle Architects P.C. and our consultants propose to complete the Scope of Basic Services for the following hourly fees, excluding reimbursable expenses: AllereLingle Architects P.C.: Nolte Associates: Abrahamson Engineering: Electrical Systems Consultants: B&C Project Services: Subtotal: Reimbursable Expenses: Total Not -to -Exceed: Hourly -not -to -exceed: $ 6,500.00 Hourly -not -to -exceed: $ 2,400.00 Hourly -not -to -exceed: S 2,800.00 Hourly -not -to -exceed: $ 3,600.00 Hourly -not -to -exceed: s 900.00 $16, 200.00 $ 400.00 $16,600.00 Reimbursable Expenses In addition to Basic Services, the following expenses in connection with this project shall be reimbursable in accordance with our master contract: 1. Blueprinting 2. Copying 3. Long distance telephone/FAX 4. Mileage and related travel expenses 5. Postage 6. Federal Express/Express Mail and other delivery services 7. Photography or other miscellaneous expenses 8. Plotting of CAD -generated drawings for City reviews and presentations Additional Services If the City requests additional services beyond those set forth in this Proposal, or for additional services as described elsewhere in this Proposal, such services shall be agreed to in writing between the City and the Architect and the fees adjusted accordingly per the following, current hourly rates: J.an,ll, 2002 11:23AM ALLER LINGLE ARCH No-8934 P. 5/6 Police Services Remodel of the Ricker Building Aller•Lingle Architects P.C.: Principal/Project Manager; $90/hour Project Architect: $75/hour Intern/CAD Tech 2: $57/hour Intern/CAD Tech I: $45/hour Clerical: $35/hour Nolte Associates: Principal: $125/hour Associate: $1021hour Manager: $93/hour Senior Engineer/Planner: $88/hour Associate Engineer/Planner: $79/hour Assistant Engineer/Planner: $72/hour Senior CADD Designer/Tech: $67/hour CADD Tech III: $65/hour CADD Tech II: $57/hour CADD Tech I: $46/hour Engineering Aide/Planning Aide: $48/hour Senior Surveyor: $74/hour Associate Surveyor: $67/hour Junior Engineer/Planner: r $62/hour Assistant Surveyor: $58/hour Survey Technician: $52/hour Construction Manager: $95/hour Assistant Construction Manager: $80/hour Resident Engineer: $70/hour Assistant Resident Engineer: $62/hour Field Observer: $55/hour Survey Crew: $100/hour Senior Chief of Survey: $88/hour Chief of Survey: $801hour Chief of Party: $57/hour Instrument person: $43/hour Rodperson: $38/hour Abrahamson Engineering Inc.: Principal/Project Engineer $75/hour Mechanical Engineer/Senior Designer $55/hour Draftsperson $35/hour Clerical $35/hour Electrical Systems Consultants Inc.: Project Manager $68/hour Project Engineer $62/hour Designer 1 $46/hour CAD Technician 1 $38/hour Clerical $28/hour Page 4 JX-11 , 2002 11:23AM ALLER LINGLE ARCH No-8934 P. 6/6 Police Services Remodel of the Ricker Building B & C Associates, Inc.: Principal $60/hour Senior Estimator $53/hour Estimator $46/hour Clerical 820/hour Page 5 Contract Terms All terms of this Proposal shall be in accordance with our master contract with the City of Fort Collins. Schedule Scope of Basic Services for this project will be performed in accordance with the following schedule, assuming notice to proceed from the City of Fort Collins by January 7, 2002: Complete Field Measurements and Record Drawings: January 14, 2002 Complete Site Survey: January 21, 2002 Initial Master Planning Complete: January 28, 2002 Conceptual Review Meeting: February 4, 2002 Complete Schematic Design Phase: February 11, 2002 Complete Cost Estimate: February 18, 2002 City Review Complete: „ February 25, 2002 Thank you for this opportunity to work with you on the proposed Ricker Brothers Building Remodel project. Please contact me if you have any questions concerning this Proposal. We shall await a Work Order prior to beginning work. Sincerely, ALLER•LINGLE ARCHITECTS P.C. David B. Lingle; DBL/tr