Revised January 11, 2002
Mr. Steve Seefeld
City of Fort Collins
Operation Services
P.O. Box 580
Fort Collins, CO 80522
RE: Proposal for Phase I Master Planning and Schematic Design
Police Services Remodel of the Ricker Brothers Building
City of Fort Collins. Colorado
Project No. 0141.13
Dear Steve:
Alle►•Lingle Architects P.C. is pleased to provide you with this revised Proposal for master
planning and schematic design services for remodeling the Ricker Brothers Building for Police
Services. In response to our meeting of December 12, 2001, Phase I Scope of Work developed
by Wendy Irving -Mills, and your revised Scope of Work memo dated January 8, 2002, we
propose the following scope of services and associated fees:
Project Description
Remodeling of the Ricker Brothers Building, 200 N. Howes Street, in downtown Fort Collins for
use by the Investigative Services Division of Police Services. Uses to be relocated from 300 W.
LaPorte Avenue and the Police Annex buildings will include the following:
Investigative Services: 8,500 net sq. ft.
Evidence Storage: 2,300 net sq. ft. for
for support services.
Found Items and Bicycles: 1,500 net sq. ft.
Fitness Area: 4,750 net sq. ft.
Scope of Basic Services
The Scope of Basic Services shall be as follows:
high -density storage plus 500 net sq, ft.
Phase I
1. Site Survey: Site survey to locate the existing building on the site and identify available
utilities and connections to the building. Show site improvements and topography at one -
foot intervals. Show any easements or other restrictions to the site.
2. Field Measurements: Field measure the existing building and develop full existing condition
floor plans in CAD format. Include locations and capacities of electrical, mechanical,
plumbing and teledata systems and components.
Jx-11 . 2002 '1;22AM ALLER LINGLE ARCH No.8934 P. 3/6
Police Services Remodel of the Ricker Building Page 2
3. Code Analysis: Perform a conceptual code review to determine the renovations necessary
to have the building and site comply with current building and zoning codes for the new
uses.
4. Planning Approval Process: Determine the level of Development Review necessary for
implementing this project (i.e. Type 1 or Type 2), and determine what documents will be
needed for that particular development review process. Develop a schematic site plan to
show the improvements required for the Development Review Process, and submit for a
Conceptual Review meeting with the City of Fort Collins.
5. Master Planning and Schematic Design: Master Planning and Schematic Design shall run
concurrently. Develop a building Master Plan and a subsequent Schematic Design floor
plan based on Operation Services' and Police Services' input. Begin master planning by
showing the approximate locations and areas of the various uses in 'bubble -diagram"
format, progressing into architectural floor plans, including electrical, mechanical, plumbing
and teledata plans to identify the upgrades needed to existing systems. Show potential
phasing, if needed to fit within funding constraints. Anticipate developing up to two (2)
design options for review by the customer in the Master Planning stage, prior to selection
of a final master plan, and up to two (2) options in Schematic Design. Anticipate up to
five (5) meetings with the customer (one to review master plan options, one to review
proposed schematic options, one to review revised options, one to review the final
approved plan and the cost estimate, and one to obtain direction to move into Design
Development). Only one (1) completelCity review will be done at the end of Schematic
Design.
6, Cost Estimating: Develop a schematic cost estimate for the site work and building
remodel, based on the plans reviewed and approved by Police Services and Operation
Services.
Work Not Included
1. Planning, landscape architecture and other related services for taking the Ricker Building
site plan through a Type 1 or 2 Preliminary Development Plan or other site plan approval
process with the City of Fort Collins.
2. Phase 2 architectural, structural, civil, mechanical/plumbing, electrical and taledata design
and engineering services for Design Development, Construction Documents,
Bidding/Negotiation and Construction Administration phases of the project.
3. CAD -generated 3-D renderings or models of the approved Schematic Design phase
solution.
4. Identify design elements where it might be co%t effective to implement substainability
goals of the 1998 City of Fort Collins/Facility Services' Green Building Criteria above and
beyond the prerequisites required for all projects. This will be implemented in the Design
Development and Construction Documents phase of the project.
Owner -Provided Information
1. Plats or other site plan documents for Block 32, including existing GIS CAD files, Civic
Center Master Plan and other relevant documents.
2. As -built or any other drawings of the Ricker Building layout, if available.
Jan,ll, 2002 11:23AM ALLER LINGLE ARCH
No.8934 P. 4/6
Police Services Remodel of the Ricker Building
Consultants
AllereLingle Architects P.C. proposes the following consultants for this project.
Surveying
Nolte Associates
Rob Van Uffelen
1901 Sharp Point Drive, Suite A
Fort Collins, CO 80525
(970) 221-2400
Mechanical Engineering
Abrahamson Engineering
Roger Abrahamson, P.E.
3101 Kintzley Court, Unit D
LaPorte, CO 80535
(970) 221-2569
Electrical Engineering
Electrical Systems Consultants
Mike Welenc/Randy Bremmer
212 W. Mulberry
Fort Collins, CO 80521
(970) 224-9100
Cost Consultant
B&C Project Services
Bill Kraus, P.E.
4500 Bluefin Court
Fort Collins, CO 80525
(970) 206-0947
Page 3
Fees
AllereLingle Architects P.C. and our consultants propose to complete the Scope of Basic Services
for the following hourly fees, excluding reimbursable expenses:
AllereLingle Architects P.C.:
Nolte Associates:
Abrahamson Engineering:
Electrical Systems Consultants:
B&C Project Services:
Subtotal:
Reimbursable Expenses:
Total Not -to -Exceed:
Hourly -not -to -exceed: $ 6,500.00
Hourly -not -to -exceed:
$
2,400.00
Hourly -not -to -exceed:
S
2,800.00
Hourly -not -to -exceed:
$
3,600.00
Hourly -not -to -exceed:
s
900.00
$16, 200.00
$
400.00
$16,600.00
Reimbursable Expenses
In addition to Basic Services, the following expenses in connection with this project shall be
reimbursable in accordance with our master contract:
1. Blueprinting
2. Copying
3. Long distance telephone/FAX
4. Mileage and related travel expenses
5. Postage
6. Federal Express/Express Mail and other delivery services
7. Photography or other miscellaneous expenses
8. Plotting of CAD -generated drawings for City reviews and presentations
Additional Services
If the City requests additional services beyond those set forth in this Proposal, or for additional
services as described elsewhere in this Proposal, such services shall be agreed to in writing
between the City and the Architect and the fees adjusted accordingly per the following, current
hourly rates:
J.an,ll, 2002 11:23AM ALLER LINGLE ARCH
No-8934 P. 5/6
Police Services Remodel of the Ricker Building
Aller•Lingle Architects P.C.:
Principal/Project Manager;
$90/hour
Project Architect:
$75/hour
Intern/CAD Tech 2:
$57/hour
Intern/CAD Tech I:
$45/hour
Clerical:
$35/hour
Nolte Associates:
Principal:
$125/hour
Associate:
$1021hour
Manager:
$93/hour
Senior Engineer/Planner:
$88/hour
Associate Engineer/Planner:
$79/hour
Assistant Engineer/Planner:
$72/hour
Senior CADD Designer/Tech:
$67/hour
CADD Tech III:
$65/hour
CADD Tech II:
$57/hour
CADD Tech I:
$46/hour
Engineering Aide/Planning Aide:
$48/hour
Senior Surveyor:
$74/hour
Associate Surveyor:
$67/hour
Junior Engineer/Planner:
r
$62/hour
Assistant Surveyor:
$58/hour
Survey Technician:
$52/hour
Construction Manager:
$95/hour
Assistant Construction Manager:
$80/hour
Resident Engineer:
$70/hour
Assistant Resident Engineer:
$62/hour
Field Observer:
$55/hour
Survey Crew:
$100/hour
Senior Chief of Survey:
$88/hour
Chief of Survey:
$801hour
Chief of Party:
$57/hour
Instrument person:
$43/hour
Rodperson:
$38/hour
Abrahamson Engineering Inc.:
Principal/Project Engineer $75/hour
Mechanical Engineer/Senior Designer $55/hour
Draftsperson $35/hour
Clerical $35/hour
Electrical Systems Consultants Inc.:
Project Manager
$68/hour
Project Engineer
$62/hour
Designer 1
$46/hour
CAD Technician 1
$38/hour
Clerical
$28/hour
Page 4
JX-11 , 2002 11:23AM ALLER LINGLE ARCH
No-8934 P. 6/6
Police Services Remodel of the Ricker Building
B & C Associates, Inc.:
Principal
$60/hour
Senior Estimator
$53/hour
Estimator
$46/hour
Clerical
820/hour
Page 5
Contract Terms
All terms of this Proposal shall be in accordance with our master contract with the City of Fort
Collins.
Schedule
Scope of Basic Services for this project will be performed in accordance with the following
schedule, assuming notice to proceed from the City of Fort Collins by January 7, 2002:
Complete Field Measurements and Record Drawings: January 14, 2002
Complete Site Survey:
January 21, 2002
Initial Master Planning Complete:
January 28, 2002
Conceptual Review Meeting:
February 4, 2002
Complete Schematic Design Phase:
February 11, 2002
Complete Cost Estimate:
February 18, 2002
City Review Complete: „
February 25, 2002
Thank you for this opportunity to work with you on the proposed Ricker Brothers Building
Remodel project. Please contact me if you have any questions concerning this Proposal. We shall
await a Work Order prior to beginning work.
Sincerely,
ALLER•LINGLE ARCHITECTS P.C.
David B. Lingle;
DBL/tr