HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - 2200543JAN-15-2002 TUE 11:36 AM CFC ENG, FAX N0, 9702216378 P. 04/07
December 11, 2001
City of Fort Collins — Engineering Department
Street Oversizing Program
281 North College Avenue
P,O, Box 580
Fort Collins, Colorado 80522
Attn: Mr. Eileen Bayens
1 rerracon
301 N I Imea • P.O. BOX 503
Fun C011ina• CNlo adn ROM-M03
X0)484.03!;0 Fax.(070)404-0454
Re; ProposallAgreement for Geotechnical Engineering Services
Larimer County Road 36 (Kechter Road) Improvements
Larimer County Road 9 to Larimer County Road 7 - Pavement Evaluation Project
Fort Collins, Colorado
Terracon Proposal No. D2001422
Terracon is pleased to submit this proposal for providing geotechnical exploration and engineering
services for the subject project. This proposal includes an outline of the project information provided
to us, the proposed scope of services, our fee, and the proposed schedule.
PROJECT INFORMATION
We understand the City of Fort Collins — Engineering Department intends on improving Larimer
County Road 36 from LCR 9 east to LCR 7 along with improvements to the existing culvert structure
at the crossing of Muskrat and Mail Creek Ditch. We have been requested to provide existing
pavement thicknesses and subgrade characteristics for the project and provide pavement thickness
recommendations for the improvements to arterial standards. Traffic Control operations will be
required for the field drilling operations.
PROPOSED SCOPE, OF SERVICES
The purpose of the geotechnical engineering services will be to evaluate the subsurface soil,
groundwater conditions, and to determine geotechnical engineering and pavement design criteria for
the design and development of the project. We propose to explore the subsurface conditions on the
site with a total of 14 test borings located within the area of the proposed roadway improvements at
the locations as shown on the enclosed site plan. Twelve test borings will be located along the
proposed roadway alignment at approximate 500-foot intervals with one of those borings along with
one additional test baring located adjacent to the proposed culvert structure at the crossing of
Muskrat and Mail Creek Ditch. Two additional test borings will be located within the proposed borrow
source area to determine suitability of fill material for the project. These borings will be located along
the alignment of the ditches and will be cased with 3-inch diameter PVC casing in an effort to
monitor fluctuations in the groundwater. The above -referenced scope of services was discussed
Aivcwl ■ A,kancns ■ Celenlde ■ Georg-3 ■ Idnho ■ WIWI I ■ Inwa ■ Kan.^.as ■ KAMUCky ■ MMMCeeli, ■ W rqun ■ Monlana
Noblaska M Nevada ■ NeW Me.w Will OW-111Ma ■ TennOF-wo ■ Tuxss ■ Umh ■ WM,n 11510 ■ WI -Ming
Quality EnghneCring Since 1965
' JAN-15-2002 TUE 11 : 36 AM CFC ENG, FAX N0, 9702216378 P. 05/07
Proposal/Agreement for Geotechnical Engineering Services
City of Fort Collins — Engineering Department
Larimer County Road 36 Improvements
Proposal No. D2001422
during a site visit with Terracon and City of Fort Collins personnel on December 3, 2001
borings will be drilled to approximate depths of 10 to 25 feet.
Terracon
The test
All borings will be advanced to the minimum depths outlined unless refusal to drilling is encountered
prior to full boring advancement, The depth and location of test borings may be further adjusted
depending upon actual subsurface conditions encountered.
During the drilling operations, a geotechnical engineer or engineering geologist will log the borings,
record the results of penetration tests, and will obtain representative samples for further laboratory
evaluation. Groundwater measurements will be made in each boring during exploration. All drilling
and sampling will be conducted in general accordance with applicable ASTM or local standards.
At the completion of drilling operations, all samples will be returned to our laboratory where they will
be examined by the project geotechnical engineer. At that time, the field descriptions will be
confirmed or modified, an applicable laboratory -testing program will be formulated and final -boring
logs prepared.
Relatively undisturbed samples will be tested for moisture content, dry density, expansion, and
compression characteristics. Representative disturbed samples will be tested for liquid limit,
plasticity index, percent fines, Hveem stabilometer characteristics and water-soluble sulfates. All
laboratory testing will be conducted in accordance with applicable ASTM or other locally recognized
standards.
The information obtained from the field exploration and laboratory -testing program will be used to
evaluate the soil and subsurface conditions at the project site. From these determinations,
engineering analyses will be undertaken in order to formulate specific design criteria for the project.
Based upon our analyses, a geotechnical engineering report will be prepared. The following
information will be provided in the report:
• A brief review of our field and laboratory procedures, and the results of all
testing conducted;
• A discussion of the general subsurface conditions including soil and
groundwater conditions;
4
JAN-15-2002 TUE 11:37 AM CFC ENG, FAX N0, 9702216378 P. 06/07
proposal)Agreement for Geotechnlcal Engineering services
City of Fort Collins — Engineering Department
Larimer County Road 36 Improvements
o o osal No D2001422
Terracon
rp
Location and characteristics of groundwater, and recommended dewatering methods
Unsatisfactory soil conditions and recommended remedial measures;
A general evaluation of possible alternate foundation systems (if applicable), and a
discussion of the recommended foundation system for the proposed culvert;
Design criteria related to the recommended foundation system, including allowable
bearing pressures, minimum sizes, predicted performance and lateral earth pressures for
the proposed culvert;
• Alternative pavement thickness designs and recommended specifications for
planned pavement areas based on the AASHTO design criteria;
• Unsatisfactory soil conditions and recommended remedial measures; and
Recommended earthwork construction procedures and quality control
measures.
SCHEDULE
It is anticipated that the field work for this project could commence one to two weeks after
authorization to proceed, and that about 1 day would be required for completion. Before the borings
can be drilled It is necessary to obtain utility clearances, which require 48-hour notification. In
addition, a traffic control plan along with signs, cones and flaggers will be necessary to properly
complete the drilling program. An additional 7 to 10 working days would be required for the
completion of laboratory testing, engineering analyses and development of the final report and
recommendations. Verbal communications, including preliminary findings and recommendations,
can generally be issued approximately 3 to 5 working days after completion of the field work and
prior to issuing the final report.
COST OF SERVICES
The cost for our services, including all field work, traffic control plan and signs, cones and flaggers
required to accomplish the required drilling, laboratory testing, engineering analyses, and report
3
JAN-15-2002 TUE 11:37 AM CFC ENG, FAX N0, 9702216378 P. 07/07
Proposal/Agreement for Geotechnical engineering Services
Terracon
City of Fort Collins - Engineering Department
Larimer County Road 36 Improvements
Proposal No. D2001422
preparation, (four copies will be provided), will be charged on a time and materials estimated fee, not
to exceed (NTE) $5,250.0_0, or approximately $375.00 per test boring. The unit price and/or hourly
rate fees used to justify the NTE fee are in accordance with our standard City of Fort Collins annual
contract. Should additional services be required beyond the scope of work outlined above, our
standard unit rates will be applicable,
AUTHORIZATION
We appreciate the opportunity of submitting this proposal, and are available to discuss the details
with you. Our Terms and Conditions are considered a part of this proposal and have been attached
for your review. To authorize us to proceed with the proposed services please indicate by signing
below and returning one executed copy of this agreement to us. Acceptance of our proposal will be
considered permission by the owner for our entry onto the site.
We appreciate your consideration of Terracon for this work, and look forward to working as your
geotechnical consultant on this and future projects.
Sincerely,
TERRACON
avid A. Ric r, P.E.
Geotechnical Engineer/Department Manager
Copies to: Addressee (2)
Enclosures: Site Plan— Proposed Test Boring Location Diagram
Terms and Conditions
Accepted this day of
By:
Title:
of:
4
2001