HomeMy WebLinkAboutRESPONSE - BID - 6075 TROLLEY BRICK RESTORATION,}
oe
\
f
Bond Number COC49611
10 WITNESO WHERWF, the Principal and the surety have hereunto bet their hands
and seals this _5th day of December , 2007, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set
forth above
PRINCIPAL SURETY
Name GLH Construction Inc Merchants Bonding Company (Mutual)
Address 780 E Garden Drive 2100 Fleur Drive
Windsor CO 80550
By
Title Gre ry L Hughes Owner
ATTEST
By
w
(SFAL) •ti �
�A a O
o
uu0i O���.
Des Moines IA 50321
Title I arole Peters Attornemn F `fit, x 0, � >
F
rr "
a
(SEAL)
Rev 1012=7 Section 00410 Page 4
Merchants Bonding Company
(Mutual)
POWER OF ATTORNEY
Know All Persons By These Presents that the MERCHANTS BONDING COMPANY (MUTUAL) a corporation duly organized under
the laws of the State of Iowa and having its principal office in the City of Des Moines County of Polk State of Iowa hath made
constituted and appointed and does by these presents make constitute and appoint
Mike Schmitt Valerie Schmitt Karole Peters
of Greeley and State of Colorado its true and lawful Attorney In Fact with full power
and authority hereby conferred in its name place and stead to sign execute acknowledge and deliver in its behalf as surety any
and all bonds undertakings recognizances or other written obligations in the nature thereof subject to the limitation that any such
instrument shall not exceed the amount of
FOUR MILLION (S 4,000,000 00) DOLLARS
and to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or
undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (MUTUAL) and all the acts of
said Attorney in Fact pursuant to the authority herein given are hereby ratified and confirmed
This Power of Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By
Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on November 16 2002
ARTICLE II SECTION 8 The Chairman of the Board or President or any Vice President or Secretary shall have power and
authority to appoint Attorneys in Fact and to authorize them to execute on behalf of the Company and attach the Seal of the
Company thereto bonds and undertakings recognizances contracts of indemnity and other writings obligatory in the nature
thereof
ARTICLE II SECTION 9 The signature of any authorized officer and the Seal of the Company may be affixed by facsimile
to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond undertaking
recognizance or other suretyship obligations of the Company and such signature and seal when so used shall have the
same force and effect as though manually fixed
In Witness Whereof MERCHANTS BONDING COMPANY (MUTUAL) has caused these presents to be signed by its President and
its corporate seal to be hereto affixed this 16th day of January 2006
• �O OAPOq 9
J, 2 _c rn
z — 3.
y 1933 c
STATE OF IOWA
COUNTY OF POLK as
MERCHANTS BONDING COMPANY (MUTUAL)
By a, / 77
President
On this 16th day of January 2006 before me appeared Larry Taylor to me personally known who being by me duly swom did say that
he is President of the MERCHANTS BONDING COMPANY (MUTUAL) the corporation described In the foregoing instrument and that the
Seal affixed to the said Instrument is the Corporate Seal of the said Corporation and that the said instrument was signed and sealed in behalf
of said Corporation by authority of its Board of Directors
In Testimony Whereof I have hereunto set my hand and affixed my Official Seal at the City of Des Moines Iowa the day and year first
above written
CINDY SMYTH
+ Commission Number 173604 tNWW nnn V//
My Commission Expires
March 16 200 1 Notary Public Polk County Iowa
STATE OF IOWA
COUNTY OF POLK as
I Wiliam Warner Jr Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) do hereby certify that the above and foregoing
is a true and correct copy of the POWER OF ATTORNEY executed by said MERCHANTS BONDING COMPANY (MUTUAL) which is
still in full force and effect and has not been amended or revoked
In Witness Whereof I have hereunto set my hand and affixed the seal of the Company on this 5th day of December 2007
secretary /
POA 0001 (1/06)
COLORADO DEPARTMENT OF TRANSPORTATION
CERTIFICATION OF EEO COMPLIANCE
Instructions Bidders and subcontractors must complete and submit this form with bid proposals for federally funded contracts
greater than $10 000 This is required by the Equal Employment Opportunity Regulations [41 CFR 60 1 7(b) (1)] The regulation
also requires that if you have participated in a previous contract or subcontract and have not filed a Standard Form 100 (EEO
1) you cannot be awarded this contract You may file a report covering the delinquent period for consideration by the Federal
Highway Administration or the Director of the Office of Federal Contract Compliance U S Department of Labor
The Standard Form 100 (EEO 1) may be requested from the
Joint Reporting Committee
P O Box 779
Norfolk VA 23501
(757)461 1213
1 TS1 Yes ❑ No I have developed and have on file at each establishment an affirmative action program as
required by 41 CFR Chapter 60 Part 60 2
2 ❑ Yes ❑ No I have participated in a previous contract/subcontract subject to the equal opportunity
clause
3 ❑ Yes ❑ No I have filed with the Joint Reporting Committee the Director or the Equal Employment
Opportunity Commission all reports due under the applicable filing requirements
I declare under penalty of perjury in the second degree and any other applicable state or federal laws that the state
ments made in this document are true and complete to the best of my knowledge
Company
GLH Catistn.-tiat EX bidder ❑ proposed subcontractor
Title
Date
L
Se=eta /`Ike SKEr
17/Z007
CDOT Form M7 11194
COLORADO DEPARTMENT OF TRANSPORTATION
PROJECT NO
ANTI -COLLUSION AFFIDAVIT
Did 16075
LOCATION
Fort Collins, 0J
I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this
bid or if not that I have written authorization enclosed herewith from that person to make the statements set out below on
his or her behalf and on behalf of my firm
Ifurther attest that
1 The price(s) and amount of this bid have been arrived at independently without consultation communication or
agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder
or potential prime bidder
2A Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or
potential prime bidder on this project and will not be so disclosed prior to bid opening
28 Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential bidder on
prime
this project have been disclosed to me or my firm
3A No attempt has been made to solicit cause or induce any firm or person who is a bidder or potential prime bidder to
refrain from bidding on this project or to submit a bid higher than the bid of this firm or any intentionally high or non
competitive bid or other form of complementary bid
3B No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder
on this project to submit an intentionally high noncompetitive or other form of complementary bid on this project
4 The bid of my firm is made in good faith and not pursuant to any consultation communication agreement or
discussion with or inducement or solicitation by or from any firm or person to submit any intentionally high noncom
petitive or other form of complementary bid
5 My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or
services from any firm or person or offered promised or paid cash or anything of value to any firm or person
whether in connection with this or any other project in consideration for an agreement or promise by any firm or
person to refrain from bidding or to submit any intentionally high noncompetitive or other form of complementary bid
or agreeing or promising to do so on this project
6 My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or
services to any firm or person and has not been promised or paid cash or anything of value by any firm or person
whether in connection with this or any other project in consideration for my firms submitting any intentionally high
noncompetitive or other form of complementary bid or agreeing or promising to do so on this project
7 1 have made a diligent inquiry of all members officers employees and agents of my firm with responsibilities
relating to the preparation approval or submission of my firms bid on this project and have been advised by each of
them that he or she has not participated in any communication consultation discussion agreement collusion or
other conduct inconsistent with any of the statements and representations made in this affidavit
8 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent
concealment from the Colorado Department of Transportation of the true facts relating to submission of bids for this
contract
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST
OF MY KNOWLEDGE
Contractors f on or company name
By
Date
9W ft�b&�
Title
Windsor, m 80550
Presidatt
2nd contractors firm or company more (If to nt venture )
By
Date
Tile
Sworn to before me this 6th day of — 2007
Y�
�fr
c ^IM
My commission e p res
06/28/10
` MONAHAN
NOTE This document must be signed in ink
cDor corm aeae trot
COLORADO DEPARTMENT OF TRANSPORTATION Project No
UNDERUTILIZED DBE (UDBE) BID Rid - 6075
CONDITIONS ASSURANCE Location
CLty of Fort GAluis
Instructions Contractor— Complete and submit this form with your bid Report only Underutilized DBE (UDBE) parbapation percentages which
qualify, under the contract goal specification for this protect
POLICY
It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have maximum opportunity to
participate in the performance of contracts financed with federal state or local entity funds
UNDERUTILIZED DBE PARTICIPATION COMMITMENT
1) Will your company s Underutilized DBE (UDBE) participation commitment meet contract goals? ® Yes ❑ No
2) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below 7 0 %
3 List the UDBE firms committed work items and eli ibla UDBE Percent of your bid that you are committing to each
UDBE FIRM NAME
CERTIFICATION
COMMITTED
SUBCONTRACT
ELIGIBLE
EXP DATE
WORK ITEM(S)
CATEGORY
UDBE %
� Subcontractor
1 11 Ave
ll /30 / 09
Mcafflic Control
❑ Supplier ❑Broker
7 0 %
2
/ /
❑ Subcontractor
°
❑ Supplier ❑ Broker
�0
3
/ /
❑ Subcontractor
°
❑ Supplier ❑ Broker
�0
4
/ /
❑ Subcontractor
°
❑ Supplier ❑ Broker
�0
5
/ /
❑ Subcontractor
°
❑ Supplier ❑ Broker
k
6
/ /
❑ Subcontractor
°
❑ Supplier ❑ Broker
�0
BOX A TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT
%
(Round percentage amounts to the nearest hundredth)
7 0
Additional instructions on how to calculate the actual eligible amounts and percentages for the subcontractor supplier and broker categories
are available on the CDOT Form #715 and in the Counting DBE Participation Toward Contract Goals and CDOT s annual DBE goal section of the
DBE — Definitions and Requirements in the Standard Special Provisions
I understand that If my company Is determined to be the low bidder for the contract on this project I must submit a completed
CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed on this form to the
Transportation Department by 4 00 pm the day after the bids are opened The actual amounts submitted on each CDOT Form
#715 must equal or exceed the percentage commitments documented on this form In addition if my company does not
meet the DBE/UDBE goal for this project I must submit a completed CDOT Form #718 DBE GOOD FAITH EFFORT
DOCUMENTATION before the above stated deadline COOT Forth 07159 submitted for firms not Included on this form OR
for amounts exceeding those listed on this forth will be accepted but NOT counted as Good Faith Efforts Only the efforts
the contractor made prior to the bid opening will count as Good Faith Efforts
I understand my obligation to abide by the policy stated above I shall not discriminate on the basis of race color age sex national
origin or handicap In the bidding process or the performance of contracts
I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY
KNOWLEDGE
Company Name
Company Officer Signature s _ , / / I Title
Previous editlgr/s may not be used CDOT Form 714 08104
GLH CONSTRUCTION INC
12/5/2007ate
NUMBER
YEAR
MAKE/MODEL
1
2004
John Deere 330 Excavator (Justin)
2
2006
John Deere 644J Loader (Danny)
3
1986
Sakai SV91TF Roller
4
2006
Hillsboro Tuffloader 20 Trader
5
2004
Ford F-250 Pickup (Justin)
6
1958
Van Trailer/TRL UT2 (Danny)
7
1997
Sakai SV50OTF Roller (Justin)
8
199T
John Deere 410 D Loader
9
2007
John Deere 722D Motor Grader (Hector)
10
2001
John Deere 644H Loader (Danny)
11
1998
Eager Beaver Trailer
12
1993
A & W Water Truck (Ron)
13
1997
Dodge pickup (Shop)
14
1982
GLH Construction Trailer (Justin)
15
2005
John Deere 200CLC Excavator (Hector)
16
200T
John Deere 750JX Dozer
17
2007
John Deere 644J Loader (Dave)
18
1994
Sakai SV70TF Roller (Ron)
20
2000
John Deere 330 Excavator (Extra)
21
2000
2000 Kenworth Tractor (Shop)
22
1996
John Deere 762E Scraper
23
200T
Interstate Trader (Hector)
24
1999
8 x 18 Flatbed Trader
25
1984
John Deere 762A Scr/Water Tanker
26
2001
Ford 350 (Danny s Field)
28
1995
John Deere 410D Backhoe
29
2004
John Deere 624J Wheel Loader (Hector)
31
200T
4 Godwin Pump w/trailer
33
2002
John Deere 450CLC Excavator (Dann )
34
1971
John Deere 510C Backhoe (Shop)
35
1975
1975 International Dump Truck (Shop)
36
2000
Dodge pickup (Shop)
38
1999
John Deere 644H Loader (Justin)
39
1975
H ster Roller (Hector)
40
2001
Ford F250 (Justin s Field)
41
199T
John Deere 750C Dozer
42
2002
Ford F250 (Ron)
43
1976
1976 Fruehauf Trailer (David)
44
2004
John Deere 330 CL Excavator (David)
NUMBER
YEAR
MAKE/MODEL
45
2001
John Deere 644H Loader (David)
46
1998
Sakai SV500T Roller (David)
47
1978
John Deere 762 Scr/Water Tanker
48
2002
Ford F250 4WD Ext Cab (Hector)
49
2002
Ford 350 4WD (David s Field)
50
2002
John Deere 644H Loader (David)
51
2002
John Deere 21 OLE Landscape Ldr (Hector)
52
2002
John Deere 772CH II Motorgrader (Ron)
53
1997
Sakai SV70TF Roller (Hector)
54
2002
John Deere 200C LC Excavator (Ron)
55
2002
John Deere 624H Loader (Ron)
56
1999
John Deere 762E II Scraper (Ron)
57
1999
John Deere 310SE Backhoe
58
2003
Frei ht Liner Water Truck (Hector)
59
2007
Ford F350 4WD Crew Cab (Danny)
60
2003
Starlite Trailer (Ron)
61
1999
Feterl Dakota Lube Truck (Keith)
62
2005
Ford F-250 Pickup (David)
63
1943
International Model M Tractor
64
2001
Ford F550 Service Truck (Corey)
65
66
2004
210 Landscape Loader (Ron)
67
1996
Rosco Tru Pac 915 Compactor (Ron)
68
2001
MQ Power DCA 45 Generator
69
1999
Hitachi 750 Excavator (Danny)
70
71
2004
6 Godwin Pump w/trader
72
2005
Bob Cat S185 Skid Loader
73
1999
John Deere 762B Scraper (Hector)
74
2005
John Deere 644J Loader (Justin)
75
2005
Hillsboro Flatbed Trader
76
2003
HY PAC C852-C Roller (Danny)
77
2005
Hitachi ZX450LC Excavator (Justin)
78
2005
John Deere 762E Water Tanker
79
2006
Homemade Trader Shop)
80
2006
Homemade Pipe Trader (Shop)
81
2006
6 Godwin Pump w/trader
82
2006
6 Godwin Pump w/trader
831
1997 lJohn
Deere 644G Loader
CONSTRUCTION, INC
1 S
It is the goal of GLH Construction to provide infrastructure development and
improvement to the Northern Colorado area emphasizing quality and integrity
Gregory L Hughes established GLH Construction in August of 1996 He brings
30 years experience in the pipeline and roadway construction industry GLH
Construction started as a company with 6 employees and has grown today to a
company of 37 employees Gary D Smith has been a managing partner since
August of 1996 He works as a general superintendent overseeing and
0 managing all field crews He also brings various superintendent experience to
the company Joseph A Schumacher has been with GLH Construction since
June of 1999 and a managing partner since January of 2000 Joe completed a
aB S Civil Engineering degree from Colorado State University and an Associate of
Applied Science -Engineering Technology/Civil degree from Aims Community
College and is a Civil Engineer Joe also has a broad background ofJob
experience in the construction industry
C I L14401t
101 of
pGLH Construction is a company rooted in Windsor a Northern Colorado area As
such we have found that our costs are best minimized by operating within a specific
regional distance Typical parameters include the cities and towns of Ft Collins
Loveland Berthoud Mead Longmont Erie Dacono Fredrick, Firestone Ft Lupton
Platteville Milliken Johnstown La Salle Kersey Greeley Eaton Evans Severance
Nunn Wellington Windsor and other areas within or nearby this boundary
a
Winner of a Mountain States BBB Torch Award for Business Ethics
i
ca"Ohr*01
Our company specializes in infrastructure development which includes
• Subdivisions (Start to Finish)
• Construction Management
(1 • Sanitary Sewer Water Line Storm Drainage Lines
u • Backhoe & Loader Work
• Earth Work
(1 • Curb/Gutter/Sidewalk
�j • Streets
• GLH Construction also competitively bids city state and private projects
0 • Bonded and Insured
I
0 Lj).,LJLM Nero
0
0
0
0
0 Office stall' (2) Shop Mechanics
Enwlovee Coorchaanoa
0
(3) Utility Crews (2) Street Crews
O
Estimator Office Staff
hi
L"J
n2
I
Aguilars Corporation Aggregate Industries
(, Attn John Aguilar Attn Vern Trautman
IUI 4301 Denver St P O Box 337231
Evans CO 80620 Greeley CO 80633
Phone (970) 330-7086 Phone (970) 353-2005
Dana Kepner Company Inc Foothills Concrete Pipe
D Attn Dave Phillips Attn Mike Hoganson
3701 Canal Drive P O Box 838
Fort Collins CO 80524 Platteville CO 80651
OPhone (970) 482-331 1 Phone (970) 785-6066
Lafarge West Inc National Waterworks
Attn KeithReichert Attn David Perry
925 N 35h Avenue 1910 39 h St
Greeley CO 80631 Denver CO 80524
Phone (970) 378-2244 Phone (303) 292-1 1 12
Poudre Tech Aggregate T&T Concrete
Attn Martin Lind Attn Tony Arguello
1625 Pelican Lakes Point 3000 F Street
Windsor CO 80550 Greeley CO 80634
Phone (970) 696-5828 Phone (970) 352-6721
nlid 161114181
Bank of Choice Advantage Bank
3635 23`d Ave 4731 W 10"' St - Suite B
Evans CO 80620 Greeley CO 80634
�j Phone (970) 506-1000 Phone (970) 353-0047
Q Pinnacle Bank Signature Bank
1702 17 St 355 Eastman Park Dr
Cody WY 82414 Windsor CO 80550
Phone (307) 527-7186 Phone (970) 674-3600
a3
SECTION 00300
D •C'
PROJECT 6075 Trolley Brick Restoration Project
Place (LH G�mtpztun, Inc
Date
1 In compliance with your Invitation to Bid dated NwadEr 15 _, 2007 and
subject to all conditions thereof, the undersigned
a (Corporation, Limited Liability Company, Partnership, Joint Venture, or
Sole Proprietor) authorized to do business in the State of Colorado hereby
proposes to furnish and do everything required by the Contract Documents to
which this refers for the construction of all items listed on the following
Bid Schedule or Bid Schedules
2 The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other person
or persons Bidding for the same Work, and that it is made in pursuance of
and subject to all the terms and conditions of the Invitation to Bid and
Instructions to Bidders, the Agreement, the detailed Specifications, and the
Drawings pertaining to the Work to be done, all of which have been examined
by the undersigned
3 Accompanying this Bid is a certified or cashier's check or standard Bid bond
in the sum of T/
($ ) in accordance with the Invitation To Bid and Instructions to
Bidders
4 The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid
The name and address of the corporate surety with which the Bidder proposes
to furnish the specified performance and payment bonds is as follows
MF!r its Rmhig
5 All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned, included
by implication or appurtenant thereto, are to be performed by the CONTRACTOR
under one of the items listed in the Bid Schedule, irrespective of whether
it is named in said list
6 Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents
7 The undersigned Bidder hereby acknowledges receipt of Addenda No
1 through
Rev 10/20/07 Section 00300 Page 1
t1kof
1 Sears Investment
I� Attn Brian Bartels
711 I O' St #200
Greeley CO 80634
Phone (970) 356-5500
Martin Lind
U 1625 Pelican Lakes Point, Suite 201
Windsor CO 80550
Phone (970) 686-5828
aAshcroft Development LLC
Attn David Calvin @ Bataa Oil
0 5801 W i 1 "' St
Greeley CO 80634
Phone (970) 336-1000
iJ Landings Development
Attn Bob Childers/Nick Francis/Adam Buna/Dale Boehner
1220 1 1 'h Ave
Greeley CO 80631
Phone (970) 353-2925
oCell (970) 396-1031 (Dale Boehner)
Executive Homes
O Attn Brian Boos
220 E Main St
Windsor CO 80550
0 Phone (970) 686-6233
Lumbermen s Investment Corp
Attn John Pierret
14755 Preston Road Suite 710
Dallas TX 75254
QPhone (972) 702-8699
D-WP of Evans LLC
Attn Adam Buna
2423 Bluebells Drive
Evans CO 80620
Phone (303) 877-4766
0 4
1
Patriarch Development
Attn Mark Strauss
4209 Idledale Drive
Ft Collins CO 80526
Phone (970) 226-0442
1
JRC Land Company LLC
Attn John Leffler
16977 WCR 74
Eaton CO 80615
Phone (970) 454-2515
Double Eagle Construction Seances Inc
Attn Gregg Seebohm
CJ
4026 Timberline Rd Suite 100
Ft Collins CO 80525
DPhone
(970) 223-3500
Summit Land Management, Inc
Attn Andy Krill
Q
8020 S CR 5 Suite 200
Windsor CO 80528
Phone (970)207-1511
Roche Constructors Inc
0
361 71 n Avenue
Greeley CO 80634
Phone (970) 356-361 1
QMajor Projects Completed
o Gateway Subdivision Ph 1 & II (Greeley CO)
Owner Brian Boos
Contract Amount $2 356 491
aCompleted 09/ 1998
Cove @ The Landings (Evans CO)
Owner Nick Francis/Adam Buna/Dale Boehner
Contract Amount $658 871
Completed 09/ 1997
0 5
Water Valley Ph I & II (Windsor CO)
Owner Martin Lind
Contract Amount $3481863
Completed 0112001
Kelly Farms Ph I If & III (Greeley CO)
J
Owner Brian Bartels
ContractAmount $3395106
Completed 0212001
Mt Vista Ph I & II/Mt Vista Center (Greeley CO)
Owner Vista Ventures
Contract Amount $4 337 024
aCompleted
05/2002
Bay @ Landings (Evans CO)
Q
Owner Nick Francis/Adam Buna/Dale Boehner
Contract Amount $1 581 261
Completed 05/ 1999
0
Pelican Hills (Windsor CO)
Owner Martin Lind
O
Contract Amount $1 000 000
Completed 01/2000
Baldridge Subdivision (Severance CO)
0
Owner IBC Dennis Egge
Contract Amount $2 470 088
0
Completed 09/2001
Willowbrook Ph I & II (Evans CO)
Owner Jeff Demaske
0
Contract Amount $4 494 640
Completed 06/2001
QDiamond
Valley Road (Windsor CO)
Windsor Development/Chns Ruff
Contract Amount $1 061 694
Q
Completed 09/2001
Clearview Ph I II & III (Johnstown CO)
Clearview Development/Bnan Boos
Contract Amount $6 404 884
Completed 08/2003
4
1
Boomerang (Greeley CO)
Adare Homes/Bill Purcell
Contract Amount $1 988 229
Completed 04/2002
Governor s Ranch Ph I & II (Eaton CO)
JRC Land Co/John Leffler
Contract Amount $1 734 149
Completed 0712002
Highland Meadows/Lift Station (Ault, CO)
Clarkson Land
Contract Amount $1 333 096
Completed 1212002
Ashcroft Draw Sanitary Sewer Ph I & II (Greeley CO)
Ashcroft Development/David Calvin
O
Contract Amount $ 2 142 809
Completed 06/2002
QSt
Michaels Dump Ditch/GLIC Realignment (Greeley CO)
Ashcroft Development/David Calvin
ContractAmount $718 736
Completed 1012002
Water Valley 7`" Filing (Windsor CO)
0
Dohn Construction
Contract Amount $1 666 043
OCompleted
09/2001
St Michaels Ph I & II (Greeley CO)
Ashcroft Development/David Calvin
Contract Amount $8 385 822
Completed 09/2003
0
Ridge @ Prairie View Ph I & II (Evans CO)
D-WP of Evans/Nick Francis & Adam Buna
Contract Amount $2 009 543
Completed 1212003
Waterford Place (Loveland CO)
Trammel Crow Residential
Contract Amount $1 319 842
QCompleted 09/2003
Li
71 n Ave & 281" St/GLIC Ditch Lining (Greeley CO)
Ashcroft Development/David Calvin
ContractAmount $990217
Completed 0812003
ISummer
Park Village (Greeley CO)
Highpointe Inc/Curt Karlen
Contract Amount $1 366 056
Completed 11/2003
�)
Dove Hill (LaSalle CO)
Patriarch Builders/Mark Strauss
u
ContractAmount $1 378 440
aJohnstown
Completed 07/2003
Farms (Johnstown CO)
Lumbermans Investment/John Pierret
ContractAmount $4 239 248
Completed 01/2004
Tuscany Development (Evans CO)
Tuscany Development, LLC/John & Carl Ford
a ContractAmount $1 357 295
Completed 01/2004
Baldridge Phase II
Jack & Beverly Schneider c/o Double Eagle Construction
Contract Amount $468 759
QCompleted
01/2004
Seeley Lake Improvements
Ogilvy Ditch Company
o
Contract Amount $268574
Completed 02/2004
0
Town of Eaton 24" Waterline
Town of Eaton Colorado
ContractAmount $539976
D
Completed 01/2004
Q Habitat For Humanity
Greeley Colorado
Contract Amount $747819
QCompleted 06/2004
Lt
Governors Ranch Ph III
JRC Land Company/John Leffler
Contract Amount $824 093
Completed 06/2004
J Cleannew 2 Ph II
Clearview Development/Brian Boos
Contract Amount $300 848
Completed 0712004
Water Valley South-Trollco Ph I
Trollco/Martin Lind
Contract Amount, $4 856 782
DCompleted
1112004
Water Valley South -Metro Ph I
o
Trollco/Martin Lind
Contract Amount $ 5 116 933
Completed 11/2004
aWater
Valley South -Metro Ph II
Trollco/Martin Lind
Contract Amount $2 684 692
DCompleted
11/2004
Barefoot Farms
0
Dave Barnett
ContractAmount $237494
Completed 10/2004
OWinter
Farm
Roche Constructors Ryan Strub
a
Contract Amount $4 180 00 00
Completed 08/2005
D
Poudre River Ranch
Double Eagle Construction Services Inc
Contract Amount $4 386 497 00
Completed 05/2006
Belmont Ridge
Belmont Ridge Development, LLC
a
Contract Amount $4 331 039 00
Completed 09/2005
A
f
,11111111111111h, low
(Ylmoki
780 E_ Garden Mrive Windsor, CO 80550
Phone (970> 674-0440 Fax (970) 674-0443
wwW_GLHConstructlon_com
Current Protects
Project Name
Owner
Engineer
Location
Description
Contract Amt
Project dates
Belmont Ridge Ph 4 & 5
Belmont Ridge
Northern Engineering
Windsor CO
Earthwork
5 547 398 79
Start 05/2006
Development LLC
Services Inc
Sewer
Est Comp 12/2007
970-662 0600
970 221-4158
Water
Stone Sewer
Concrete
Streets
Good Samaritan
Dohn Construction
TST Eng
Windsor CO
Sewer
595 000 00
Start 10/2006
970-490 1855
970 226 0204
Water
Est Comp 12/2007
Non Potable Water
Storm Sewer
Erosion Control
Timnath Ranch
Summit Land Mgmt
Northern Engineering
Timnath CO
Earthwork
4 300 000 00
Start 11/2006
(970) 207 1511
970 221-4158
Sewer
Fall 2007
Water
Storm Sewer
Aladar/LCR 5
Umprop
Northern Engineering
Windsor CO
Earthwork
1 065 000 00
Start 04/2007
Sewer
Est Comp 11/2007
Water
Storm Sewer
Concrete
Streets
Touchstone/Westwood Village
Option 2 LLC
Design One Consultants
Windsor CO
Erosion Control
1 465 000 00
Start 0612007
Earthwork
Est Comp 12/2007
Sewer
Water
Storm Sewer
Concrete
Streets
Evans 23rd Avenue
City of Evans
City of Evans
Evans CO
Storm Sewer
894 000 00
Start 08/2007
Streets
Est Comp 1212007
Pinnacle Park
P2 Highland Properties
Pickett Engineering
Greeley CO
Earthwork
995 000 00
Start 07/2007
Sewer
Est Comp Summer 2008
Water
Storm Sewer
Concrete
Streets
Current Projects 12/5/2007
Project Name
Owner
Engineer
Location
Description
Contract Amt
Project dates
Centerpiece North
Edgewood Companies
KBN Engineering
Greeley CO
Earthwork
940 000 00
Start 09/2007
Sewer
Est Comp Summer 2008
Water
Storm Sewer
Concrete
Streets
Evans 37th St
City of Evans
City of Evans
Evans CO
Sewer
1 005 000 00
Start 09/2007
Water
Est Comp Summer 2008
Concrete
Midway
City of Ft Collins
City of Ft Collins
Ft Collins CO
Water
86 000 00
Start 11/2 007
Storm
Est Comp 12/2007
Evans Town Ditch
City of Evans
City of Evans
Evans CO
Storm Sewer
830 000 00
Start 12/2007
Concrete
Est Comp, Summer 2008
Current Protects 12/5/2007
s 10
r
AL l , InA.1%
780 E Garden Orlve Windsor, CO 80550
Phone (970) 674-0440 Fax (970) 674-0443
www CLHCOnstructlon com
Completed Protects
Project Name
Owner
Location
Description
Contract Amt
Project dates
Gateway
Martin Lind
Greeley CO
Earthwork
1 066 693 00
Completed 06/97
Phase 1
970 686 5828
Sanitary Sewer
Water
Storm Sewer
Concrete
Streets
Colony Plaza
Landings Dev
Evans CO
Earthwork
266 419 00
Completed 06/97
Sewer Main
Adam Buns
Sanitary Sewer
303 530-4766
Storm Sewer
Cottages @
Fisbeck/Sheel
Evans CO
Earthwork
55 773 00
Completed 09/97
The Landings
Bill Sheel
Sanitary Sewer
970 339-4525
Water
Storm Sewer
Concrete
Streets
Cove @
Landings Dev
Evans CO
Earthwork
658 870 67
Completed 09/97
The Landings
Adam Buns
Sanitary Sewer
303 530-4766
Water
Storm Sewer
Concrete
Streets
City of Evans
City of Evans
Evans CO
Sanitary Sewer
350 878 51
Completed 01/98
11th Ave /
Earl Smith
Water
37th St
970 339 5344
Storm Sewer
Streets
Gateway
Gateway Dev
Greeley CO
Earthwork
1 289 798 10
Completed 09/98
Phase ll
Brian Boos
Sanitary Sewer
970-686-6233
Water
Storm Sewer
Concrete
Streets
Completed Projects 12/5/2007
Project Name
Owner
Location
Description
Contract Amt
Project dates
Water Valley
Martin Lind
Windsor CO
Earthwork
Phase I
Phase I & 11
970 686 5828
Sanitary Sewer
1 459 467 81
Completed 09/99
Water
Storm Sewer
Phase11
Concrete
2 022 394 96
Completed 01/01
Streets
Kelly Farms
Kelly Farms
Greeley CO
Earthwork
1 041 08824
Completed 09/98
Phase I
Development
Sanitary Sewer
Brian Bartels
Water
970 330-7700
Storm Sewer
Concrete
Streets
Mt Vista
Vista Ventures
Greeley CO
Earthwork
1 544 35122
Completed 06/99
Phase I
Ken Crumb
Sanitary Sewer
970 304 1392
Water
Storm Sewer
Concrete
Streets
Pinnacle @
Sovereign Homes
Greeley CO
Earthwork
131 499 98
Completed 09/98
T Bone
Bob Leonetti
Sanitary Sewer
970-539 1941
Water
Storm Sewer
Concrete
Streets
Bay @
Landings Dev
Evans CO
Earthwork
1 581 26092
Completed 05/99
Landings
Adam Buns
Sanitary Sewer
303 5304766
Water
Storm Sewer
Concrete
Streets
Cottages @
Fisbeck/Sheel
Evans CO
Earthwork
56 958 51
Completed 05/99
Landings
Br11 Sheet
Sanitary Sewer
970 3394525
Water
Storm Sewer
Concrete
Streets
Meadows @
Dale Boehner
Ft Collins CO
Earthwork
303 203 42
Completed 05/99
Fox Creek
970 396 1031
Sanitary Sewer
Water
Storm Sewer
Concrete
Streets
Completed Projects 12/5/2007
BID SCHEDULE (Base Bid)
........................
]esaripta.an
UnitContract
Quantity
Contract cost
Unit
Price
Tot
2emove Concrete
SF
5265
$
$
2emove and Salvage Existing Bricks
SF
2625
$ 243
$ 63787
Jnclassified Excavation
CY
75
$ 76 59
$ 57442
Iggregate Base Course (Class 5)
TON
185
$ 38 31
$ 70873
iupply New Trolley Bricks - Material Only
SF
6500
$ 534
$ 34710 0
Install Brick Trolley Roadbed
SF
7890
$ 422
$ 33295 8(
dobilization
LS
1
$ 1027324
$ 10273 Z
Craffic Control
LS
1
$ 7700 00
$ 77CO 0(
roTAL COST $
109769 94
Dc
Ore Rxd:ed RLm MrL sard Seam Rnlmd Sixty Anne ad 94+/100
Bid Total in Words
Inllhcr, CD 80550
Phone/Fax• 1 • 1_ 1 • 1 • 1_
Individual Doing Business in Company Name GRcaistricticn, Irc /
;orporation Cvgory L R#rs, PresrdEnt
'artnership
'0ro7 Section 00300 Page 1
Project Name
Owner
Location
Description
Contract Amt
Project dates
City of Evans
Earl Smith
Evans CO
Water
336 000 00
Completed 08/99
Pueblo St
970 339 5344
Storm Sewer
Streets
Loma Linda
UC Dev
Greeley
Earthwork
185 000 00
Completed 08/99
Subdivision
Stan Sessions
Sanitary Sewer
970-356-6082
Water
Storm Sewer
Concrete
Streets
Hilltop Estates
Martin Lind
Windsor CO
Earthwork
1 000 000 00
Completed 01/00
970-686 5828
Sanitary Sewer
Water
Storm Sewer
Concrete
Streets
Clubhouse @
Martin Lind
Windsor CO
Earthwork
400 000 00
Completed 07/00
Pelican Lakes
970-686-5828
Sanitary Sewer
Water
Storm Sewer
Concrete
Streets
Mt Vista
Vista Ventures
Greeley CO
Earthwork
1 861 889 20
Completed 09/00
Phase II
Ken Crumb
Sanitary Sewer
970 304 1392
Water
Storm Sewer
Concrete
Streets
Kelly Farms
Kelly Farms
Greeley CO
Earthwork
1 656 849 74
Completed 02/01
Phase II
Development
Sanitary Sewer
Brian Bartels
Water
970 330 7700
Storm Sewer
Concrete
Streets
Baldridge
IBC
Severance CO
Earthwork
2 470 087 96
Completed 09/01
Subdivision
Dennis Egge
Sanitary Sewer
970-686-0337
Water
Storm Sewer
Concrete
Streets
Town of
Town of Windsor
Windsor CO
Water
429 439 85
Completed 77/01
Windsor
Dennis Wagner
Streets
WL Replace
970-686 7180
Completed Projects 12/5/2007
Project Name
Owner
Location
Description
Contract Amt
Project dates
State Farm
Hensel Phelps
Greeley CO
Earthwork
597 848 69
Completed 02/O1
Building
970 352-6565
Sanitary Sewer
Water
Storm Sewer
Willowbrook
J&J Enterprises
Evans CO
Earthwork
2 151 930 26
Completed 06/01
Phase I
Jeff Demaske
Sanitary Sewer
970 352 7072
Water
Storm Sewer
Concrete
Streets
Diamond
Windsor Dev
Windsor CO
Earthwork
1 061 69357
Completed 09/01
Valley Road
Group
Water
Chris Ruff
Storm Sewer
970 686 9552
Concrete
Streets
Diamond
Windsor Dev
Windsor CO
Earthwork
418 837 10
Completed 09/01
Valley 3rd Filing
Group
Sanitary Sewer
Chris Ruff
Water
970-686 9552
Storm Sewer
Concrete
Streets
Windsor
Windsor Dev
Windsor CO
Earthwork
121 815 87
Completed 09/01
Charter
Group-Chns Ruff
Concrete
Academy
970-686 9552
Parking Lot
WV 4th Filing
Dohn Const
Windsor CO
Earthwork
152 043 45
Completed 10/01
Brett Brown
Sanitary Sewer
970-490 1855
Water
Willowbrook II
J&J Enterprises
Evans CO
Earthwork
1 669 634 93
Completed 99/01
Jeff Demaske
Sanitary Sewer
970 352 7072
Water
Storm Sewer
Concrete
Streets
Clearview
Clearview Dev
Johnstown CO
Earthwork
3 530 513 96
Completed 05/02
Brian Bartels
Sanitary Sewer
970 330-7700
Water
Storm Sewer
Concrete
Streets
Completed Projects 12/5/2007
Project Name
Owner
Location
Descn tion
Contract Amt
Project dates
Boomerang
Adare Homes
Greeley CO
Earthwork
1 988 228 69
Completed 04/02
Bill Purcell
Sanitary Sewer
303 220 5600
Water
Storm Sewer
Concrete
Streets
Willowbrook
J&J Enterprises
Evans CO
Earthwork
673 075 47
Completed 06/02
29th Ave
Jeff Demaske
Water
970 352 7072
Storm Sewer
Streets
Mountain Vista
Vista Ventures LLC
Greeley CO
Earthwork
930 784 25
Completed 05/02
Center
Ken Crumb
Sanitary Sewer
970 304 1392
Water
Storm Sewer
Concrete
Streets
Calvin Pond
David Calvin
Greeley CO
Earthwork
724 680 47
Completed 09/01
970 336 1000
WV 7th filing
Dohn Const
Windsor CO
Earthwork
1 666 043 31
Brett Brown
Sanitary Sewer
970-490 1855
Water
Governor's Ranch
JRC Land Cc LLC
Eaton CO
Earthwork
1 105 033 59
FCompletedO8/01
Phase I
John Leffler
Sanitary Sewer
970-454 2515
Water
Storm Sewer
Concrete
Streets
Ashcroft Draw
Ashcroft Dev LLC
Greeley CO
Sanitary Sewer
1 055 895 09
Completed 06/02
Sanitary Sewer
David Calvin
970 336 1000
St Michaels Dump
Ashcroft Dev LLC
Greeley CO
Storm Sewer
328 590 70
Completed 06/02
Ditch
David Calvin
970 336 1000
St Michaels GLIC
Ashcroft Dev LLC
Greeley CO
Storm Sewer
390 144 56
Completed 06/02
Realignment
David Calvin
970 336 1000
St Michaels IAshcroft
Dev LLC
Greeley CO
Earthwork
1 185 822 29
Completed 05/02
Subdivision IDavid
Calvin
970 336 1000
Completed Projects 12/5/2007
Project Name
Owner
Location
Description
Contract Amt
Project dates
Highland
Clarkson Land
Ault CO
Earthwork
1 103 212 81
Completed 08/02
Meadows
Billy McDivitt
Sanitary Sewer
Ault
970 353 0802
Water
Storm Sewer
Concrete
Streets
Highland
W Windsor Dev
Windsor CO
Earthwork
958 84915
Completed 07/02
Meadows
Brian Boos
Sanitary Sewer
Windsor
970-686-6233
Storm Sewer
DV 4th Filing
Dohn Const
Windsor CO
Earthwork
438 097 86
Completed 08/02
Brett Brown
Sanitary Sewer
970-490 1855
Water
Storm Sewer
Concrete
Streets
Governors
JRC Land Co LLC
Eaton CO
Earthwork
629 114 74
Completed 07/02
Ranch
John Leffler
Sanitary Sewer
Phase II
970-454 2515
Water
Storm Sewer
Concrete
Streets
Ridge @
D WP of Evans
Evans CO
Earthwork
968 906 55
Completed 01/03
Prairie View
Adam Buns
Sanitary Sewer
303 530-4766
Water
Storm Sewer
Concrete
Streets
North Weld
North Weld
Eaton CO
Earthwork
455 656 73
Completed 01/03
County Water
County Water
Water
District
District
Transmission
Allan Overton
Line
970-356-3020
Kelly Farms
Kelly Farms LLC
Greeley CO
Earthwork
697 167 67
Completed 12102
Phase III
Brian Bartels
Sanitary Sewer
970 381 5166
Water
Storm Sewer
Concrete
Streets
Completed Projects 12/5/2007
Project Name
Owner
Location
Descnption
Contract Amt
Project dates
Clearview
Clearview Dev LLC
Johnstown CO
Earthwork
2 945 063 72
Completed 03/03
Phase III
Brian Boos
Sanitary Sewer
970-686-6233
Water
Storm Sewer
Concrete
Streets
Ashcroft Draw
Meyer Farm
Greeley CO
Sanitary Sewer
1 086 914 30
Completed 10/2002
Sanitary Sewer
Development LLC
Phase II
David Calvin
970 336 1000
Highland Ault
Clarkson Land
Ault CO
Sanitary Sewer
229 883 27
Completed 12/02
Lift Station
Billy McDivrtt
970 353 0802
City of Evans
City of Evans
Evans CO
Water
449 013 92
Completed 03/03
Waterline
Earl Smith
Project
970 339 5344
St Michaels
Ashcroft Dev LLC
Greeley CO
Earthwork
7 200 000 00
Completed 09/03
David Calvin
Sanitary Sewer
970 336 1000
Water
Storm Sewer
Concrete
Streets
Fossil Ridge
Executive Homes
Windsor CO
Earthwork
52 297 18
Completed 02/03
Sewer Crossing
Bnan Boos
Sanitary Sewer
970-686-6233
Waterford Place
Trammel Crow
Loveland CO
Earthwork
1 319154229
Completed 09/03
Apartments
Residential
Sanitary Sewer
Water
Storm Sewer
Concrete
Streets
Longsview
Adare Homes
Greeley CO
Earthwork
383 335 10
Completed 08/03
Bill Purcell
Concrete
303 220 5600
Streets
71 st Ave/28th St
Ashcroft Dev LLC
Greeley CO
Earthwork
718 047 47
Completed 08/03
David Calvin
Streets
970 336 1000
Non Potable
Ashcroft Dev LLC
Greeley CO
Water
507 026 32
Completed 08/03
Water
David Calvin
970 336 1000
Completed Projects 12/5/2007
Project Name
Owner
Location
Description
Contract Amt
Project dates
Dove Hill
Patriarch Developers
LaSalle CO
Earthwork
1 378 439 75
Completed 07/03
Mark Strauss
Sanitary Sewer
970 566 8880
Water
Storm Sewer
Concrete
Streets
GLIC Ditch Lining
Ashcroft Day, LLC
Greeley CO
Storm Sewer
272 169 75
Completed 08/03
David Calvin
970 336-1000
WV 11th Filing
Cotter Construction
Windsor CO
Earthwork
240 322 83
Completed 07/03
Dave Carlson
Sanitary Sewer
970 221-4621
Water
Storm Sewer
Concrete
Streets
High Pointe
Highpomte Inc
Greeley CO
Earthwork
252 264 55
Completed 08/03
Condos @
Curt Karlen
Sanitary Sewer
Kelly Farms
970-674 1299
Water
Storm Sewer
Concrete
Streets
Summer Park
Highpomte Inc
Greeley CO
Earthwork
1 366 056 34
Completed 11/03
Village
Curt Karlen
Sanitary Sewer
970-674 1299
Water
Storm Sewer
Concrete
Streets
Johnstown Farms
Lumberman s Investment
Johnstown CO
Earthwork
3 780 676 73
Completed 01/04
John Pierret
Sanitary Sewer
972 702 8699
Water
Storm Sewer
Concrete
Streets
Tuscany
Tuscany LLC
Evans CO
Earthwork
1 357 294 65
Completed 22/03
Carl Ford
Sanitary Sewer
970-405 3388
Water
Storm Sewer
Concrete
Streets
Completed Projects 12/5/2007
Project Name
Owner
Location
Descnption
Contract Amt
Project dates
Baldridge Phase II
Jack & Beverly Schneider
Severance CO
Earthwork
468 758 95
Completed 01/04
% Double Eagle Const
Sanitary Sewer
970 223 3500
Water
Storm Sewer
Concrete
Streets
Johnstown Farms
Lumbermans
Johnstown CO
Earthwork
458 571 55
Completed 01/04
Phase IV
Investments
Sanitary Sewer
972 702 8372
Water
Storm Sewer
Concrete
Streets
Seeley Lake
Ogilvy Ditch Co
Greeley CO
Storm Sewer
268 574 47
Completed 02/04
Improvements
970 3524468
Town of Eaton
Town of Eaton
Eaton CO
Water
539 976 16
Completed 01/04
24 Waterline
970-454 3338
Miscellaneous
Waterford Place
Kiewit Western Co
Loveland CO
Earthwork
74 479 17
Completed 03/04
303 979 9330
Habitat For
Habitat For
Greeley CO
Earthwork
747819 19
Completed 06/04
Humanity
Humanity
Sanitary Sewer
970 351-6766
Water
Storm Sewer
Concrete
Streets
Governors Ranch
JRC Land Company
Eaton CO
Earthwork
824 092 90
Completed 06/04
Phase III
John Leffler
Sewer
970-454 2515
Water
Storm Sewer
Clearview 2 Ph II
Clearview Dev LLC
Johnstown CO
Earthwork
300 847 65
Completed 07/04
970-686-6233
Sewer
Water
Storm Sewer
Erosion Control
Concrete
Streets
Water Valley
Trollco Inc
Windsor CO
Earthwork
5 194 538 00
Completed 11/04
South Trollco Ph I
Martin Lind
Sewer
970-686 5828
Water
Storm Sewer
Conduit
Concrete
Streets
Completed Projects 12/5/2007
Project Name
Owner
Location
Description
Contract Amt
Project dates
Water Valley
Trollco Inc
Windsor CO
Earthwork
5 598 320 00
Completed 11/04
South Metro Ph I
Martin Lind
Sewer
970-686 5828
Water
Storm Sewer
Conduit
Concrete
Streets
Water Valley
Trollco Inc
Windsor CO
Earthwork
3 192 835 00
Completed 11/04
South Metro Ph II
Martin Lind
Sewer
970-686 5828
Water
Storm Sewer
Conduit
Concrete
Streets
Barefoot Farms
Dave Barnett
Windsor CO
Earthwork
258 555 00
Completed 11/04
970-686 0525
Sewer
Water
Storm Sewer
Erosion Control
Concrete
Streets
Ridge @ Prairie
D WP of Evans LLC
Evans CO
Earthwork
663 460 18
Completed 05/05
View Ph 5
Nick Francis
Sewer
970 381 3591
Water
Adam Buns
Storm Sewer
303 877-4766
Erosion Control
Concrete
Streets
Town Centre @
Fisbeck/Sheel
Greeley CO
Earthwork
178 940 00
Completed 06/05
St Michaels
Winter Farm
Roche Constructors
Windsor CO
Earthwork
4 180 000 00
Completed 08/05
Ryan Strub
Sewer
970 356 3611
Water
Storm Sewer
Erosion Control
Concrete
Streets
Completed Protects 12/5/2007 10
Project Name
Owner
Location
Description
Contract Amt
Project dates
Belmont Ridge
Belmont Ridge
Windsor CO
Earthwork
4 331 039 00
Completed 09/05
Development LLC
Sewer
970 662 0600
Water
Storm Sewer
Erosion Control
Concrete
Streets
Cimarron Pointe
Lockhart Consructors
Firestone CO
Earthwork
602 428 00
Completed 07/05
Sewer
Water
Storm Sewer
Erosion Control
Concrete
Streets
Terrace Green
Terrace Green LLC
Greeley CO
Earthwork
174 921 00
Completed 10/05
Nick Francis
Sewer
970 381 3591
Water
Storm Sewer
Concrete
Streets
Dove Hill Ph II
Patriarch Builders
LaSalle CO
Earthwork
711 276 00
Completed 10/05
970 566 8880
Sewer
Water
Storm Sewer
Concrete
Streets
Parker Meadows
B & B Local
Evans CO
Earthwork
271 373 38
Completed 02106
Construction LLC
Sewer
970-353 3141
Water
Storm Sewer
Concrete
Streets
Diamond Valley Bldg K
Dohn Construction Inc
Windsor CO
Sewer
39 094 64
Completed 12/05
970-490 1855
Water
King Surveyors Building
King Surveyors Inc
Windsor CO
Earthwork
910 018 46
Completed 08/05
970-686 5011
Sewer
Water
Concrete
Streets
Completed Protects 12/5/2007 11
Project Name
Owner
Location
Description
Contract Amt
Project dates
Chubbuck Ditch
Greeley Loveland
Loveland CO
Earthwork
44 235 63
Completed 07/05
Irrigation Company
Sewer
John Gauthne
Streets
970 330-0855
City of Evans
City of Evans
Evans CO
Earthwork
691 095 36
Completed 06/05
42nd Street
970 339 5344
Sewer
Water
Concrete
Streets
City of Evans
City of Evans
Evans CO
Earthwork
571 406 66
Completed 09/05
Riverside Parkway
970 339 5344
Concrete
Streets
Cedar Estates
Jewels Development
Pierce CO
Earthwork
117 712 26
Completed 07/05
970 206 1047
Concrete
Streets
State Hwy 257
Windsor CO
Earthwork
683 731 29
Completed 02/06
Storm Sewer
Streets
WV South
Five Hole Investments
Windsor CO
Earthwork
1 956 459 66
Completed 12/05
Hillside & Trollco Ph III
Sewer
Water
Storm Sewer
Concrete
Streets
Poudre River Ranch
Double Eagle
Greeley CO
Earthwork
4 386 497 00
Completed 05/2006
Construction Sery Inc
Sewer
970 223-3500
Water
Storm Sewer
Concrete
Streets
S Gate Sewer
Trollco Inc
Windsor CO
Earthwork
1 346 415 72
Completed 05/2006
Interceptor
970-686 5828
Sewer
Water
Streets
Highpoint Vista
Double Eagle
Windsor CO
Sewer
3 826 565 44
Completed 05/2006
Construction Sery Inc
970-223 3500
Storm Sewer
Water Valley Village
Dohn Construction Inc
Windsor CO
Earthwork
521 856 27
Completed 05/2006
970-490-1855
Sewer
Water
Storm Sewer
Concrete
Streets
Completed Projects 12/5/2007 12
ACCEPTANCE OF FUEL COST ADJUSTMENTS
Bidders have the option to accept Fuel Cost Adjustments in accordance with the
Revision of Section 109 - Fuel Cost Adjustment To accept this standard
special provision, the bidder must fill in an "X" next to "YES" below No
Fuel Cost Adjustment will be made due to fuel cost changes for bidders who
answer "NO" If neither line is marked, the Department will assume the bidder
rejects Fuel Cost Adjustments for this project After bids are submitted,
bidders will not be given any other opportunity to accept or reject this
adjustment
(Mark only one line with an "X")
X YES, I choose to accept Fuel Cost Adjustments for this project
NO, I choose NOT to accept Fuel Cost Adjustments for this project (if
neither line is marked, the default is "NO", I choose NOT to accept Fuel Cost
Adjustments for this project
9 PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc , to cover
the complete Work in place of the several kinds called for
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or change quantities at his sole discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twenty-five percent (25%) of the total Agreement Price
RESPECTFULLY SUBMITTED
9�TiRVACTOR
cD j �l nO�Z i natu 12/06/2007
g Date
ao
PYL'S2JJMt
'a1 �c�!,_ Title
O`N'O'
%,,,I�NI1N�1
License Number (If Applicable
(Seal - if Bid is by c rporation)
Attest
Rev 10/20/07 Section 00410 Page 1
Project Name
Owner
Location
Description
Contract Amt
Project dates
Lighthouse Bay
Landmark Construction
Windsor CO
Earthwork
574 183 15
Completed 0512006
Condos
Solutions
Sewer
970-686-0824
Water
Storm Sewer
Concrete
Streets
Johnstown Farms Ph II
Lumbermen s Investment
Johnstown CO
Earthwork
614 300 37
Completed 04/2006
Corporation
Water
972 702 8699
Storm Sewer
Concrete
Streets
Faith Estates
National Vision
Eaton CO
Earthwork
407 778 25
Completed 05/2006
Development Inc
Water
970 396-6477
Storm Sewer
Streets
Center Park
Lou Cangilla
Greeley CO
Sewer
115 709 91
Completed 05/2006
970 356 3343
Water
Concrete
Streets
The Village @ St Michaels
Macrum Building Systems
Greeley CO
Sewer
194 208 00
Completed 03/2007
(970) 590 2200
Water
Non Potable Water
Storm Sewer
Concrete
Streets
Erosion Control
WV Village Storm
Water Valley
Windsor CO
Sewer
29 908 00
Completed 0212007
970-686 5828
Water
Non Potable Water
Storm Sewer
Erosion Control
Southgate Business Park
Dohn Construction Inc
Windsor CO
Earthwork 4 131 167 00
Completed 12/06
970-490 1855
Sewer
and
Water
Windsor Southgate LLC
Storm Sewer
970-686 5828
Concrete
Streets
Windsor Commons
Ft Collins Paving
Windsor CO
Sewer
364 878 00
Completed 0212007
(970) 686-0986
Water
Storm Sewer
Eagle Crossing
Eagle Crossing Dev Inc
Loveland CO
Earthwork
5 300 000 00
Completed 08/2007
970-686-5828
Sewer
Water
Completed Projects 12/5/2007 13
Project Name
Owner
Location
Description
Contract Amt
Project dates
Storm Sewer
Concrete
Streets
Wyndham Hill
Ridge Development
Frederick CO
Earthwork
1 340 000 00
Completed08/2007
(970) 663 0575
Sewer
Water
Storm Sewer
Concrete
Streets
McCloskey Commercial
Edgewood Companies
Greeley CO
Sewer
1 425 000 00
Completed 08/2007
(970) 381 5166
Water
Storm Sewer
Erosion Control
River Run @ Poudre River
Snowdance Dev
Greeley CO
Sewer
1 166 064 00
Completed 09/2007
(970) 356 9787
Water
Non Potable Water
Storm Sewer
Erosion Control
Severance San Sewer
Town of Severance
Severance CO
Sewer
1 450 000 00
Completed 0812007
Plaza Commercial
Herrick Garnsey
Greeley CO
Demo
652 498 00
Completed 11/2007
(970) 539-0010
Erosion Control
Sewer
Water
Storm Sewer
Condwds
Concrete
Streets
Completed Protects 12/5/2007 14
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive This statement must be notarized If necessary, questions may
be answered on separate attached sheets The Bidder may submit any additional
information he desires
1 Name of Bidder G H CxrtnrtUx1, Inc
2 Permanent main office address
3 When organized
:1 E Ga-dEnDnw Mrdsx,11 80550
4 If a corporation, where incorporated Colorado
5
0
How many years have you been engaged in the contracting business
under your present firm or trade names 11 yamm
Contracts on hand (Schedule these, showing the amount of each
contract and the appropriate anticipated dates of completion )
7 General
of Work performed by your company
rd Utilities
8 Have you ever failed to complete any Work awarded to you? Db
If so, where and why?
9 Have your ever defaulted on a contract?
If so, where and whys
10 Are you debarred by any government agency's
If yes list agency name
U
Rev 10/20/07
Section 00420 Page 1
11 List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction
12 List your major equipment available for this contract
Attached
13 Experience in construction Work similar in importance to this
project
Attach
14 Background and experience of the principal members of your organization,
including officers
Attached
15 Credit available $ 10 ya hcn +
16 Bank reference Bank of Choice
17 Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER')
yes
18 Are you licensed as a General CONTRACTOR? ye;
If yes, in what city, county and state9 CDlcrado, Uan QLtiesWhat
class, license and numbers?
19 Do you anticipate subcontracting Work under this
Contract? pPq
If yes, what percent of total contract's T/
and to whom' IV=b= 1oraip mffir. Gmtrol
20 Are any lawsuits pending against you or your firm at this time? rb
IF yes, DETAIL
Rev 10/20/07 Section 00420 Page 2
21 What are the limits of your public liability? DETAIL
Attachs3
What company9
22 What are your company's bonding limitations?
23 The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications
Dated at this 6th day of r 2007
C7H m ttnr imp Tim y
Name of Bidder
By
Title preadEnt 1 MO �MHAPY �
State of Colora:b "
) wr
County of W-M T �
Gmgxi L. Imo- bm being duly sworn deposes and says that he
is - pmsidEnt of CLH Ccnstnntjm, hr- and that
(name of organization)
the answers to the foregoing questions and all statements therein contained
are true and correct
Subscribed andswornto eefo^re me this 6th day of Dac6rbw 2007
'� / w /
Notary Public
My commission expires 06/28/10
Rev 10/20/07 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 151� of the contract
ITEM
MiMOM
d •:�••• U■ •a•• • •ir.•• ir.
Section 00430 Page 1
Bond Number COC49611
GLH Construction Inc & Merchants
KNOW ALL MEN BY THFSE PRFSENTS that we, the underrjgned Bonding Company (Mutual)
as Principal, and as 4urety, are hereby held and firmly bound unto the. City t
Fort Collins, Colorado, as OWNER, in the sum of $ 5% of Attached Bid for the
payment of which, well and truly to be made, we hereby jointly and severally
bind ourselves, successors, and assigns
PHE WNDIIION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and
hereby made a part hereof to enter into a Construction Agreement for the
construction of Fort Collins Project, 6075 Trolley Brick Restoration Project
NOW THEREFORE,
(a) If said Bid shall be iejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of contract attached hereto (properly romplet,ed in
accordance with said Bid) and shall furnish a BOND for his faithfuL
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said
Bid, then this obligation shall be void otherwise the same shall remain
in force 'ind effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated
The Surety, for value received, hereby stipulates and agrees that the
obligations of said Surety and its BOND shall be in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Bid, and said Surety does hereby waive notice of any such extension
Surety Companies executing bonds must be authorized to transact business in
the State nf Colorado and be accepted by the OWNFR
Rev 10/2=7 Section 00410 Page 3