Loading...
HomeMy WebLinkAboutRESPONSE - BID - 6075 TROLLEY BRICK RESTORATION,} oe \ f Bond Number COC49611 10 WITNESO WHERWF, the Principal and the surety have hereunto bet their hands and seals this _5th day of December , 2007, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above PRINCIPAL SURETY Name GLH Construction Inc Merchants Bonding Company (Mutual) Address 780 E Garden Drive 2100 Fleur Drive Windsor CO 80550 By Title Gre ry L Hughes Owner ATTEST By w (SFAL) •ti � �A a O o uu0i O���. Des Moines IA 50321 Title I arole Peters Attornemn F `fit, x 0, � > F rr " a (SEAL) Rev 1012=7 Section 00410 Page 4 Merchants Bonding Company (Mutual) POWER OF ATTORNEY Know All Persons By These Presents that the MERCHANTS BONDING COMPANY (MUTUAL) a corporation duly organized under the laws of the State of Iowa and having its principal office in the City of Des Moines County of Polk State of Iowa hath made constituted and appointed and does by these presents make constitute and appoint Mike Schmitt Valerie Schmitt Karole Peters of Greeley and State of Colorado its true and lawful Attorney In Fact with full power and authority hereby conferred in its name place and stead to sign execute acknowledge and deliver in its behalf as surety any and all bonds undertakings recognizances or other written obligations in the nature thereof subject to the limitation that any such instrument shall not exceed the amount of FOUR MILLION (S 4,000,000 00) DOLLARS and to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (MUTUAL) and all the acts of said Attorney in Fact pursuant to the authority herein given are hereby ratified and confirmed This Power of Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on November 16 2002 ARTICLE II SECTION 8 The Chairman of the Board or President or any Vice President or Secretary shall have power and authority to appoint Attorneys in Fact and to authorize them to execute on behalf of the Company and attach the Seal of the Company thereto bonds and undertakings recognizances contracts of indemnity and other writings obligatory in the nature thereof ARTICLE II SECTION 9 The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond undertaking recognizance or other suretyship obligations of the Company and such signature and seal when so used shall have the same force and effect as though manually fixed In Witness Whereof MERCHANTS BONDING COMPANY (MUTUAL) has caused these presents to be signed by its President and its corporate seal to be hereto affixed this 16th day of January 2006 • �O OAPOq 9 J, 2 _c rn z — 3. y 1933 c STATE OF IOWA COUNTY OF POLK as MERCHANTS BONDING COMPANY (MUTUAL) By a, / 77 President On this 16th day of January 2006 before me appeared Larry Taylor to me personally known who being by me duly swom did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL) the corporation described In the foregoing instrument and that the Seal affixed to the said Instrument is the Corporate Seal of the said Corporation and that the said instrument was signed and sealed in behalf of said Corporation by authority of its Board of Directors In Testimony Whereof I have hereunto set my hand and affixed my Official Seal at the City of Des Moines Iowa the day and year first above written CINDY SMYTH + Commission Number 173604 tNWW nnn V// My Commission Expires March 16 200 1 Notary Public Polk County Iowa STATE OF IOWA COUNTY OF POLK as I Wiliam Warner Jr Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) do hereby certify that the above and foregoing is a true and correct copy of the POWER OF ATTORNEY executed by said MERCHANTS BONDING COMPANY (MUTUAL) which is still in full force and effect and has not been amended or revoked In Witness Whereof I have hereunto set my hand and affixed the seal of the Company on this 5th day of December 2007 secretary / POA 0001 (1/06) COLORADO DEPARTMENT OF TRANSPORTATION CERTIFICATION OF EEO COMPLIANCE Instructions Bidders and subcontractors must complete and submit this form with bid proposals for federally funded contracts greater than $10 000 This is required by the Equal Employment Opportunity Regulations [41 CFR 60 1 7(b) (1)] The regulation also requires that if you have participated in a previous contract or subcontract and have not filed a Standard Form 100 (EEO 1) you cannot be awarded this contract You may file a report covering the delinquent period for consideration by the Federal Highway Administration or the Director of the Office of Federal Contract Compliance U S Department of Labor The Standard Form 100 (EEO 1) may be requested from the Joint Reporting Committee P O Box 779 Norfolk VA 23501 (757)461 1213 1 TS1 Yes ❑ No I have developed and have on file at each establishment an affirmative action program as required by 41 CFR Chapter 60 Part 60 2 2 ❑ Yes ❑ No I have participated in a previous contract/subcontract subject to the equal opportunity clause 3 ❑ Yes ❑ No I have filed with the Joint Reporting Committee the Director or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements I declare under penalty of perjury in the second degree and any other applicable state or federal laws that the state ments made in this document are true and complete to the best of my knowledge Company GLH Catistn.-tiat EX bidder ❑ proposed subcontractor Title Date L Se=eta /`Ike SKEr 17/Z007 CDOT Form M7 11194 COLORADO DEPARTMENT OF TRANSPORTATION PROJECT NO ANTI -COLLUSION AFFIDAVIT Did 16075 LOCATION Fort Collins, 0J I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this bid or if not that I have written authorization enclosed herewith from that person to make the statements set out below on his or her behalf and on behalf of my firm Ifurther attest that 1 The price(s) and amount of this bid have been arrived at independently without consultation communication or agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder or potential prime bidder 2A Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or potential prime bidder on this project and will not be so disclosed prior to bid opening 28 Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential bidder on prime this project have been disclosed to me or my firm 3A No attempt has been made to solicit cause or induce any firm or person who is a bidder or potential prime bidder to refrain from bidding on this project or to submit a bid higher than the bid of this firm or any intentionally high or non competitive bid or other form of complementary bid 3B No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder on this project to submit an intentionally high noncompetitive or other form of complementary bid on this project 4 The bid of my firm is made in good faith and not pursuant to any consultation communication agreement or discussion with or inducement or solicitation by or from any firm or person to submit any intentionally high noncom petitive or other form of complementary bid 5 My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or services from any firm or person or offered promised or paid cash or anything of value to any firm or person whether in connection with this or any other project in consideration for an agreement or promise by any firm or person to refrain from bidding or to submit any intentionally high noncompetitive or other form of complementary bid or agreeing or promising to do so on this project 6 My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or services to any firm or person and has not been promised or paid cash or anything of value by any firm or person whether in connection with this or any other project in consideration for my firms submitting any intentionally high noncompetitive or other form of complementary bid or agreeing or promising to do so on this project 7 1 have made a diligent inquiry of all members officers employees and agents of my firm with responsibilities relating to the preparation approval or submission of my firms bid on this project and have been advised by each of them that he or she has not participated in any communication consultation discussion agreement collusion or other conduct inconsistent with any of the statements and representations made in this affidavit 8 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent concealment from the Colorado Department of Transportation of the true facts relating to submission of bids for this contract I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE Contractors f on or company name By Date 9W ft�b&� Title Windsor, m 80550 Presidatt 2nd contractors firm or company more (If to nt venture ) By Date Tile Sworn to before me this 6th day of — 2007 Y� �fr c ^IM My commission e p res 06/28/10 ` MONAHAN NOTE This document must be signed in ink cDor corm aeae trot COLORADO DEPARTMENT OF TRANSPORTATION Project No UNDERUTILIZED DBE (UDBE) BID Rid - 6075 CONDITIONS ASSURANCE Location CLty of Fort GAluis Instructions Contractor— Complete and submit this form with your bid Report only Underutilized DBE (UDBE) parbapation percentages which qualify, under the contract goal specification for this protect POLICY It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have maximum opportunity to participate in the performance of contracts financed with federal state or local entity funds UNDERUTILIZED DBE PARTICIPATION COMMITMENT 1) Will your company s Underutilized DBE (UDBE) participation commitment meet contract goals? ® Yes ❑ No 2) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below 7 0 % 3 List the UDBE firms committed work items and eli ibla UDBE Percent of your bid that you are committing to each UDBE FIRM NAME CERTIFICATION COMMITTED SUBCONTRACT ELIGIBLE EXP DATE WORK ITEM(S) CATEGORY UDBE % � Subcontractor 1 11 Ave ll /30 / 09 Mcafflic Control ❑ Supplier ❑Broker 7 0 % 2 / / ❑ Subcontractor ° ❑ Supplier ❑ Broker �0 3 / / ❑ Subcontractor ° ❑ Supplier ❑ Broker �0 4 / / ❑ Subcontractor ° ❑ Supplier ❑ Broker �0 5 / / ❑ Subcontractor ° ❑ Supplier ❑ Broker k 6 / / ❑ Subcontractor ° ❑ Supplier ❑ Broker �0 BOX A TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT % (Round percentage amounts to the nearest hundredth) 7 0 Additional instructions on how to calculate the actual eligible amounts and percentages for the subcontractor supplier and broker categories are available on the CDOT Form #715 and in the Counting DBE Participation Toward Contract Goals and CDOT s annual DBE goal section of the DBE — Definitions and Requirements in the Standard Special Provisions I understand that If my company Is determined to be the low bidder for the contract on this project I must submit a completed CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed on this form to the Transportation Department by 4 00 pm the day after the bids are opened The actual amounts submitted on each CDOT Form #715 must equal or exceed the percentage commitments documented on this form In addition if my company does not meet the DBE/UDBE goal for this project I must submit a completed CDOT Form #718 DBE GOOD FAITH EFFORT DOCUMENTATION before the above stated deadline COOT Forth 07159 submitted for firms not Included on this form OR for amounts exceeding those listed on this forth will be accepted but NOT counted as Good Faith Efforts Only the efforts the contractor made prior to the bid opening will count as Good Faith Efforts I understand my obligation to abide by the policy stated above I shall not discriminate on the basis of race color age sex national origin or handicap In the bidding process or the performance of contracts I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE Company Name Company Officer Signature s _ , / / I Title Previous editlgr/s may not be used CDOT Form 714 08104 GLH CONSTRUCTION INC 12/5/2007ate NUMBER YEAR MAKE/MODEL 1 2004 John Deere 330 Excavator (Justin) 2 2006 John Deere 644J Loader (Danny) 3 1986 Sakai SV91TF Roller 4 2006 Hillsboro Tuffloader 20 Trader 5 2004 Ford F-250 Pickup (Justin) 6 1958 Van Trailer/TRL UT2 (Danny) 7 1997 Sakai SV50OTF Roller (Justin) 8 199T John Deere 410 D Loader 9 2007 John Deere 722D Motor Grader (Hector) 10 2001 John Deere 644H Loader (Danny) 11 1998 Eager Beaver Trailer 12 1993 A & W Water Truck (Ron) 13 1997 Dodge pickup (Shop) 14 1982 GLH Construction Trailer (Justin) 15 2005 John Deere 200CLC Excavator (Hector) 16 200T John Deere 750JX Dozer 17 2007 John Deere 644J Loader (Dave) 18 1994 Sakai SV70TF Roller (Ron) 20 2000 John Deere 330 Excavator (Extra) 21 2000 2000 Kenworth Tractor (Shop) 22 1996 John Deere 762E Scraper 23 200T Interstate Trader (Hector) 24 1999 8 x 18 Flatbed Trader 25 1984 John Deere 762A Scr/Water Tanker 26 2001 Ford 350 (Danny s Field) 28 1995 John Deere 410D Backhoe 29 2004 John Deere 624J Wheel Loader (Hector) 31 200T 4 Godwin Pump w/trailer 33 2002 John Deere 450CLC Excavator (Dann ) 34 1971 John Deere 510C Backhoe (Shop) 35 1975 1975 International Dump Truck (Shop) 36 2000 Dodge pickup (Shop) 38 1999 John Deere 644H Loader (Justin) 39 1975 H ster Roller (Hector) 40 2001 Ford F250 (Justin s Field) 41 199T John Deere 750C Dozer 42 2002 Ford F250 (Ron) 43 1976 1976 Fruehauf Trailer (David) 44 2004 John Deere 330 CL Excavator (David) NUMBER YEAR MAKE/MODEL 45 2001 John Deere 644H Loader (David) 46 1998 Sakai SV500T Roller (David) 47 1978 John Deere 762 Scr/Water Tanker 48 2002 Ford F250 4WD Ext Cab (Hector) 49 2002 Ford 350 4WD (David s Field) 50 2002 John Deere 644H Loader (David) 51 2002 John Deere 21 OLE Landscape Ldr (Hector) 52 2002 John Deere 772CH II Motorgrader (Ron) 53 1997 Sakai SV70TF Roller (Hector) 54 2002 John Deere 200C LC Excavator (Ron) 55 2002 John Deere 624H Loader (Ron) 56 1999 John Deere 762E II Scraper (Ron) 57 1999 John Deere 310SE Backhoe 58 2003 Frei ht Liner Water Truck (Hector) 59 2007 Ford F350 4WD Crew Cab (Danny) 60 2003 Starlite Trailer (Ron) 61 1999 Feterl Dakota Lube Truck (Keith) 62 2005 Ford F-250 Pickup (David) 63 1943 International Model M Tractor 64 2001 Ford F550 Service Truck (Corey) 65 66 2004 210 Landscape Loader (Ron) 67 1996 Rosco Tru Pac 915 Compactor (Ron) 68 2001 MQ Power DCA 45 Generator 69 1999 Hitachi 750 Excavator (Danny) 70 71 2004 6 Godwin Pump w/trader 72 2005 Bob Cat S185 Skid Loader 73 1999 John Deere 762B Scraper (Hector) 74 2005 John Deere 644J Loader (Justin) 75 2005 Hillsboro Flatbed Trader 76 2003 HY PAC C852-C Roller (Danny) 77 2005 Hitachi ZX450LC Excavator (Justin) 78 2005 John Deere 762E Water Tanker 79 2006 Homemade Trader Shop) 80 2006 Homemade Pipe Trader (Shop) 81 2006 6 Godwin Pump w/trader 82 2006 6 Godwin Pump w/trader 831 1997 lJohn Deere 644G Loader CONSTRUCTION, INC 1 S It is the goal of GLH Construction to provide infrastructure development and improvement to the Northern Colorado area emphasizing quality and integrity Gregory L Hughes established GLH Construction in August of 1996 He brings 30 years experience in the pipeline and roadway construction industry GLH Construction started as a company with 6 employees and has grown today to a company of 37 employees Gary D Smith has been a managing partner since August of 1996 He works as a general superintendent overseeing and 0 managing all field crews He also brings various superintendent experience to the company Joseph A Schumacher has been with GLH Construction since June of 1999 and a managing partner since January of 2000 Joe completed a aB S Civil Engineering degree from Colorado State University and an Associate of Applied Science -Engineering Technology/Civil degree from Aims Community College and is a Civil Engineer Joe also has a broad background ofJob experience in the construction industry C I L14401t 101 of pGLH Construction is a company rooted in Windsor a Northern Colorado area As such we have found that our costs are best minimized by operating within a specific regional distance Typical parameters include the cities and towns of Ft Collins Loveland Berthoud Mead Longmont Erie Dacono Fredrick, Firestone Ft Lupton Platteville Milliken Johnstown La Salle Kersey Greeley Eaton Evans Severance Nunn Wellington Windsor and other areas within or nearby this boundary a Winner of a Mountain States BBB Torch Award for Business Ethics i ca"Ohr*01 Our company specializes in infrastructure development which includes • Subdivisions (Start to Finish) • Construction Management (1 • Sanitary Sewer Water Line Storm Drainage Lines u • Backhoe & Loader Work • Earth Work (1 • Curb/Gutter/Sidewalk �j • Streets • GLH Construction also competitively bids city state and private projects 0 • Bonded and Insured I 0 Lj).,LJLM Nero 0 0 0 0 0 Office stall' (2) Shop Mechanics Enwlovee Coorchaanoa 0 (3) Utility Crews (2) Street Crews O Estimator Office Staff hi L"J n2 I Aguilars Corporation Aggregate Industries (, Attn John Aguilar Attn Vern Trautman IUI 4301 Denver St P O Box 337231 Evans CO 80620 Greeley CO 80633 Phone (970) 330-7086 Phone (970) 353-2005 Dana Kepner Company Inc Foothills Concrete Pipe D Attn Dave Phillips Attn Mike Hoganson 3701 Canal Drive P O Box 838 Fort Collins CO 80524 Platteville CO 80651 OPhone (970) 482-331 1 Phone (970) 785-6066 Lafarge West Inc National Waterworks Attn KeithReichert Attn David Perry 925 N 35h Avenue 1910 39 h St Greeley CO 80631 Denver CO 80524 Phone (970) 378-2244 Phone (303) 292-1 1 12 Poudre Tech Aggregate T&T Concrete Attn Martin Lind Attn Tony Arguello 1625 Pelican Lakes Point 3000 F Street Windsor CO 80550 Greeley CO 80634 Phone (970) 696-5828 Phone (970) 352-6721 nlid 161114181 Bank of Choice Advantage Bank 3635 23`d Ave 4731 W 10"' St - Suite B Evans CO 80620 Greeley CO 80634 �j Phone (970) 506-1000 Phone (970) 353-0047 Q Pinnacle Bank Signature Bank 1702 17 St 355 Eastman Park Dr Cody WY 82414 Windsor CO 80550 Phone (307) 527-7186 Phone (970) 674-3600 a3 SECTION 00300 D •C' PROJECT 6075 Trolley Brick Restoration Project Place (LH G�mtpztun, Inc Date 1 In compliance with your Invitation to Bid dated NwadEr 15 _, 2007 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules 2 The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned 3 Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of T/ ($ ) in accordance with the Invitation To Bid and Instructions to Bidders 4 The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows MF!r its Rmhig 5 All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list 6 Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents 7 The undersigned Bidder hereby acknowledges receipt of Addenda No 1 through Rev 10/20/07 Section 00300 Page 1 t1kof 1 Sears Investment I� Attn Brian Bartels 711 I O' St #200 Greeley CO 80634 Phone (970) 356-5500 Martin Lind U 1625 Pelican Lakes Point, Suite 201 Windsor CO 80550 Phone (970) 686-5828 aAshcroft Development LLC Attn David Calvin @ Bataa Oil 0 5801 W i 1 "' St Greeley CO 80634 Phone (970) 336-1000 iJ Landings Development Attn Bob Childers/Nick Francis/Adam Buna/Dale Boehner 1220 1 1 'h Ave Greeley CO 80631 Phone (970) 353-2925 oCell (970) 396-1031 (Dale Boehner) Executive Homes O Attn Brian Boos 220 E Main St Windsor CO 80550 0 Phone (970) 686-6233 Lumbermen s Investment Corp Attn John Pierret 14755 Preston Road Suite 710 Dallas TX 75254 QPhone (972) 702-8699 D-WP of Evans LLC Attn Adam Buna 2423 Bluebells Drive Evans CO 80620 Phone (303) 877-4766 0 4 1 Patriarch Development Attn Mark Strauss 4209 Idledale Drive Ft Collins CO 80526 Phone (970) 226-0442 1 JRC Land Company LLC Attn John Leffler 16977 WCR 74 Eaton CO 80615 Phone (970) 454-2515 Double Eagle Construction Seances Inc Attn Gregg Seebohm CJ 4026 Timberline Rd Suite 100 Ft Collins CO 80525 DPhone (970) 223-3500 Summit Land Management, Inc Attn Andy Krill Q 8020 S CR 5 Suite 200 Windsor CO 80528 Phone (970)207-1511 Roche Constructors Inc 0 361 71 n Avenue Greeley CO 80634 Phone (970) 356-361 1 QMajor Projects Completed o Gateway Subdivision Ph 1 & II (Greeley CO) Owner Brian Boos Contract Amount $2 356 491 aCompleted 09/ 1998 Cove @ The Landings (Evans CO) Owner Nick Francis/Adam Buna/Dale Boehner Contract Amount $658 871 Completed 09/ 1997 0 5 Water Valley Ph I & II (Windsor CO) Owner Martin Lind Contract Amount $3481863 Completed 0112001 Kelly Farms Ph I If & III (Greeley CO) J Owner Brian Bartels ContractAmount $3395106 Completed 0212001 Mt Vista Ph I & II/Mt Vista Center (Greeley CO) Owner Vista Ventures Contract Amount $4 337 024 aCompleted 05/2002 Bay @ Landings (Evans CO) Q Owner Nick Francis/Adam Buna/Dale Boehner Contract Amount $1 581 261 Completed 05/ 1999 0 Pelican Hills (Windsor CO) Owner Martin Lind O Contract Amount $1 000 000 Completed 01/2000 Baldridge Subdivision (Severance CO) 0 Owner IBC Dennis Egge Contract Amount $2 470 088 0 Completed 09/2001 Willowbrook Ph I & II (Evans CO) Owner Jeff Demaske 0 Contract Amount $4 494 640 Completed 06/2001 QDiamond Valley Road (Windsor CO) Windsor Development/Chns Ruff Contract Amount $1 061 694 Q Completed 09/2001 Clearview Ph I II & III (Johnstown CO) Clearview Development/Bnan Boos Contract Amount $6 404 884 Completed 08/2003 4 1 Boomerang (Greeley CO) Adare Homes/Bill Purcell Contract Amount $1 988 229 Completed 04/2002 Governor s Ranch Ph I & II (Eaton CO) JRC Land Co/John Leffler Contract Amount $1 734 149 Completed 0712002 Highland Meadows/Lift Station (Ault, CO) Clarkson Land Contract Amount $1 333 096 Completed 1212002 Ashcroft Draw Sanitary Sewer Ph I & II (Greeley CO) Ashcroft Development/David Calvin O Contract Amount $ 2 142 809 Completed 06/2002 QSt Michaels Dump Ditch/GLIC Realignment (Greeley CO) Ashcroft Development/David Calvin ContractAmount $718 736 Completed 1012002 Water Valley 7`" Filing (Windsor CO) 0 Dohn Construction Contract Amount $1 666 043 OCompleted 09/2001 St Michaels Ph I & II (Greeley CO) Ashcroft Development/David Calvin Contract Amount $8 385 822 Completed 09/2003 0 Ridge @ Prairie View Ph I & II (Evans CO) D-WP of Evans/Nick Francis & Adam Buna Contract Amount $2 009 543 Completed 1212003 Waterford Place (Loveland CO) Trammel Crow Residential Contract Amount $1 319 842 QCompleted 09/2003 Li 71 n Ave & 281" St/GLIC Ditch Lining (Greeley CO) Ashcroft Development/David Calvin ContractAmount $990217 Completed 0812003 ISummer Park Village (Greeley CO) Highpointe Inc/Curt Karlen Contract Amount $1 366 056 Completed 11/2003 �) Dove Hill (LaSalle CO) Patriarch Builders/Mark Strauss u ContractAmount $1 378 440 aJohnstown Completed 07/2003 Farms (Johnstown CO) Lumbermans Investment/John Pierret ContractAmount $4 239 248 Completed 01/2004 Tuscany Development (Evans CO) Tuscany Development, LLC/John & Carl Ford a ContractAmount $1 357 295 Completed 01/2004 Baldridge Phase II Jack & Beverly Schneider c/o Double Eagle Construction Contract Amount $468 759 QCompleted 01/2004 Seeley Lake Improvements Ogilvy Ditch Company o Contract Amount $268574 Completed 02/2004 0 Town of Eaton 24" Waterline Town of Eaton Colorado ContractAmount $539976 D Completed 01/2004 Q Habitat For Humanity Greeley Colorado Contract Amount $747819 QCompleted 06/2004 Lt Governors Ranch Ph III JRC Land Company/John Leffler Contract Amount $824 093 Completed 06/2004 J Cleannew 2 Ph II Clearview Development/Brian Boos Contract Amount $300 848 Completed 0712004 Water Valley South-Trollco Ph I Trollco/Martin Lind Contract Amount, $4 856 782 DCompleted 1112004 Water Valley South -Metro Ph I o Trollco/Martin Lind Contract Amount $ 5 116 933 Completed 11/2004 aWater Valley South -Metro Ph II Trollco/Martin Lind Contract Amount $2 684 692 DCompleted 11/2004 Barefoot Farms 0 Dave Barnett ContractAmount $237494 Completed 10/2004 OWinter Farm Roche Constructors Ryan Strub a Contract Amount $4 180 00 00 Completed 08/2005 D Poudre River Ranch Double Eagle Construction Services Inc Contract Amount $4 386 497 00 Completed 05/2006 Belmont Ridge Belmont Ridge Development, LLC a Contract Amount $4 331 039 00 Completed 09/2005 A f ,11111111111111h, low (Ylmoki 780 E_ Garden Mrive Windsor, CO 80550 Phone (970> 674-0440 Fax (970) 674-0443 wwW_GLHConstructlon_com Current Protects Project Name Owner Engineer Location Description Contract Amt Project dates Belmont Ridge Ph 4 & 5 Belmont Ridge Northern Engineering Windsor CO Earthwork 5 547 398 79 Start 05/2006 Development LLC Services Inc Sewer Est Comp 12/2007 970-662 0600 970 221-4158 Water Stone Sewer Concrete Streets Good Samaritan Dohn Construction TST Eng Windsor CO Sewer 595 000 00 Start 10/2006 970-490 1855 970 226 0204 Water Est Comp 12/2007 Non Potable Water Storm Sewer Erosion Control Timnath Ranch Summit Land Mgmt Northern Engineering Timnath CO Earthwork 4 300 000 00 Start 11/2006 (970) 207 1511 970 221-4158 Sewer Fall 2007 Water Storm Sewer Aladar/LCR 5 Umprop Northern Engineering Windsor CO Earthwork 1 065 000 00 Start 04/2007 Sewer Est Comp 11/2007 Water Storm Sewer Concrete Streets Touchstone/Westwood Village Option 2 LLC Design One Consultants Windsor CO Erosion Control 1 465 000 00 Start 0612007 Earthwork Est Comp 12/2007 Sewer Water Storm Sewer Concrete Streets Evans 23rd Avenue City of Evans City of Evans Evans CO Storm Sewer 894 000 00 Start 08/2007 Streets Est Comp 1212007 Pinnacle Park P2 Highland Properties Pickett Engineering Greeley CO Earthwork 995 000 00 Start 07/2007 Sewer Est Comp Summer 2008 Water Storm Sewer Concrete Streets Current Projects 12/5/2007 Project Name Owner Engineer Location Description Contract Amt Project dates Centerpiece North Edgewood Companies KBN Engineering Greeley CO Earthwork 940 000 00 Start 09/2007 Sewer Est Comp Summer 2008 Water Storm Sewer Concrete Streets Evans 37th St City of Evans City of Evans Evans CO Sewer 1 005 000 00 Start 09/2007 Water Est Comp Summer 2008 Concrete Midway City of Ft Collins City of Ft Collins Ft Collins CO Water 86 000 00 Start 11/2 007 Storm Est Comp 12/2007 Evans Town Ditch City of Evans City of Evans Evans CO Storm Sewer 830 000 00 Start 12/2007 Concrete Est Comp, Summer 2008 Current Protects 12/5/2007 s 10 r AL l , InA.1% 780 E Garden Orlve Windsor, CO 80550 Phone (970) 674-0440 Fax (970) 674-0443 www CLHCOnstructlon com Completed Protects Project Name Owner Location Description Contract Amt Project dates Gateway Martin Lind Greeley CO Earthwork 1 066 693 00 Completed 06/97 Phase 1 970 686 5828 Sanitary Sewer Water Storm Sewer Concrete Streets Colony Plaza Landings Dev Evans CO Earthwork 266 419 00 Completed 06/97 Sewer Main Adam Buns Sanitary Sewer 303 530-4766 Storm Sewer Cottages @ Fisbeck/Sheel Evans CO Earthwork 55 773 00 Completed 09/97 The Landings Bill Sheel Sanitary Sewer 970 339-4525 Water Storm Sewer Concrete Streets Cove @ Landings Dev Evans CO Earthwork 658 870 67 Completed 09/97 The Landings Adam Buns Sanitary Sewer 303 530-4766 Water Storm Sewer Concrete Streets City of Evans City of Evans Evans CO Sanitary Sewer 350 878 51 Completed 01/98 11th Ave / Earl Smith Water 37th St 970 339 5344 Storm Sewer Streets Gateway Gateway Dev Greeley CO Earthwork 1 289 798 10 Completed 09/98 Phase ll Brian Boos Sanitary Sewer 970-686-6233 Water Storm Sewer Concrete Streets Completed Projects 12/5/2007 Project Name Owner Location Description Contract Amt Project dates Water Valley Martin Lind Windsor CO Earthwork Phase I Phase I & 11 970 686 5828 Sanitary Sewer 1 459 467 81 Completed 09/99 Water Storm Sewer Phase11 Concrete 2 022 394 96 Completed 01/01 Streets Kelly Farms Kelly Farms Greeley CO Earthwork 1 041 08824 Completed 09/98 Phase I Development Sanitary Sewer Brian Bartels Water 970 330-7700 Storm Sewer Concrete Streets Mt Vista Vista Ventures Greeley CO Earthwork 1 544 35122 Completed 06/99 Phase I Ken Crumb Sanitary Sewer 970 304 1392 Water Storm Sewer Concrete Streets Pinnacle @ Sovereign Homes Greeley CO Earthwork 131 499 98 Completed 09/98 T Bone Bob Leonetti Sanitary Sewer 970-539 1941 Water Storm Sewer Concrete Streets Bay @ Landings Dev Evans CO Earthwork 1 581 26092 Completed 05/99 Landings Adam Buns Sanitary Sewer 303 5304766 Water Storm Sewer Concrete Streets Cottages @ Fisbeck/Sheel Evans CO Earthwork 56 958 51 Completed 05/99 Landings Br11 Sheet Sanitary Sewer 970 3394525 Water Storm Sewer Concrete Streets Meadows @ Dale Boehner Ft Collins CO Earthwork 303 203 42 Completed 05/99 Fox Creek 970 396 1031 Sanitary Sewer Water Storm Sewer Concrete Streets Completed Projects 12/5/2007 BID SCHEDULE (Base Bid) ........................ ]esaripta.an UnitContract Quantity Contract cost Unit Price Tot 2emove Concrete SF 5265 $ $ 2emove and Salvage Existing Bricks SF 2625 $ 243 $ 63787 Jnclassified Excavation CY 75 $ 76 59 $ 57442 Iggregate Base Course (Class 5) TON 185 $ 38 31 $ 70873 iupply New Trolley Bricks - Material Only SF 6500 $ 534 $ 34710 0 Install Brick Trolley Roadbed SF 7890 $ 422 $ 33295 8( dobilization LS 1 $ 1027324 $ 10273 Z Craffic Control LS 1 $ 7700 00 $ 77CO 0( roTAL COST $ 109769 94 Dc Ore Rxd:ed RLm MrL sard Seam Rnlmd Sixty Anne ad 94+/100 Bid Total in Words Inllhcr, CD 80550 Phone/Fax• 1 • 1_ 1 • 1 • 1_ Individual Doing Business in Company Name GRcaistricticn, Irc / ;orporation Cvgory L R#rs, PresrdEnt 'artnership '0ro7 Section 00300 Page 1 Project Name Owner Location Description Contract Amt Project dates City of Evans Earl Smith Evans CO Water 336 000 00 Completed 08/99 Pueblo St 970 339 5344 Storm Sewer Streets Loma Linda UC Dev Greeley Earthwork 185 000 00 Completed 08/99 Subdivision Stan Sessions Sanitary Sewer 970-356-6082 Water Storm Sewer Concrete Streets Hilltop Estates Martin Lind Windsor CO Earthwork 1 000 000 00 Completed 01/00 970-686 5828 Sanitary Sewer Water Storm Sewer Concrete Streets Clubhouse @ Martin Lind Windsor CO Earthwork 400 000 00 Completed 07/00 Pelican Lakes 970-686-5828 Sanitary Sewer Water Storm Sewer Concrete Streets Mt Vista Vista Ventures Greeley CO Earthwork 1 861 889 20 Completed 09/00 Phase II Ken Crumb Sanitary Sewer 970 304 1392 Water Storm Sewer Concrete Streets Kelly Farms Kelly Farms Greeley CO Earthwork 1 656 849 74 Completed 02/01 Phase II Development Sanitary Sewer Brian Bartels Water 970 330 7700 Storm Sewer Concrete Streets Baldridge IBC Severance CO Earthwork 2 470 087 96 Completed 09/01 Subdivision Dennis Egge Sanitary Sewer 970-686-0337 Water Storm Sewer Concrete Streets Town of Town of Windsor Windsor CO Water 429 439 85 Completed 77/01 Windsor Dennis Wagner Streets WL Replace 970-686 7180 Completed Projects 12/5/2007 Project Name Owner Location Description Contract Amt Project dates State Farm Hensel Phelps Greeley CO Earthwork 597 848 69 Completed 02/O1 Building 970 352-6565 Sanitary Sewer Water Storm Sewer Willowbrook J&J Enterprises Evans CO Earthwork 2 151 930 26 Completed 06/01 Phase I Jeff Demaske Sanitary Sewer 970 352 7072 Water Storm Sewer Concrete Streets Diamond Windsor Dev Windsor CO Earthwork 1 061 69357 Completed 09/01 Valley Road Group Water Chris Ruff Storm Sewer 970 686 9552 Concrete Streets Diamond Windsor Dev Windsor CO Earthwork 418 837 10 Completed 09/01 Valley 3rd Filing Group Sanitary Sewer Chris Ruff Water 970-686 9552 Storm Sewer Concrete Streets Windsor Windsor Dev Windsor CO Earthwork 121 815 87 Completed 09/01 Charter Group-Chns Ruff Concrete Academy 970-686 9552 Parking Lot WV 4th Filing Dohn Const Windsor CO Earthwork 152 043 45 Completed 10/01 Brett Brown Sanitary Sewer 970-490 1855 Water Willowbrook II J&J Enterprises Evans CO Earthwork 1 669 634 93 Completed 99/01 Jeff Demaske Sanitary Sewer 970 352 7072 Water Storm Sewer Concrete Streets Clearview Clearview Dev Johnstown CO Earthwork 3 530 513 96 Completed 05/02 Brian Bartels Sanitary Sewer 970 330-7700 Water Storm Sewer Concrete Streets Completed Projects 12/5/2007 Project Name Owner Location Descn tion Contract Amt Project dates Boomerang Adare Homes Greeley CO Earthwork 1 988 228 69 Completed 04/02 Bill Purcell Sanitary Sewer 303 220 5600 Water Storm Sewer Concrete Streets Willowbrook J&J Enterprises Evans CO Earthwork 673 075 47 Completed 06/02 29th Ave Jeff Demaske Water 970 352 7072 Storm Sewer Streets Mountain Vista Vista Ventures LLC Greeley CO Earthwork 930 784 25 Completed 05/02 Center Ken Crumb Sanitary Sewer 970 304 1392 Water Storm Sewer Concrete Streets Calvin Pond David Calvin Greeley CO Earthwork 724 680 47 Completed 09/01 970 336 1000 WV 7th filing Dohn Const Windsor CO Earthwork 1 666 043 31 Brett Brown Sanitary Sewer 970-490 1855 Water Governor's Ranch JRC Land Cc LLC Eaton CO Earthwork 1 105 033 59 FCompletedO8/01 Phase I John Leffler Sanitary Sewer 970-454 2515 Water Storm Sewer Concrete Streets Ashcroft Draw Ashcroft Dev LLC Greeley CO Sanitary Sewer 1 055 895 09 Completed 06/02 Sanitary Sewer David Calvin 970 336 1000 St Michaels Dump Ashcroft Dev LLC Greeley CO Storm Sewer 328 590 70 Completed 06/02 Ditch David Calvin 970 336 1000 St Michaels GLIC Ashcroft Dev LLC Greeley CO Storm Sewer 390 144 56 Completed 06/02 Realignment David Calvin 970 336 1000 St Michaels IAshcroft Dev LLC Greeley CO Earthwork 1 185 822 29 Completed 05/02 Subdivision IDavid Calvin 970 336 1000 Completed Projects 12/5/2007 Project Name Owner Location Description Contract Amt Project dates Highland Clarkson Land Ault CO Earthwork 1 103 212 81 Completed 08/02 Meadows Billy McDivitt Sanitary Sewer Ault 970 353 0802 Water Storm Sewer Concrete Streets Highland W Windsor Dev Windsor CO Earthwork 958 84915 Completed 07/02 Meadows Brian Boos Sanitary Sewer Windsor 970-686-6233 Storm Sewer DV 4th Filing Dohn Const Windsor CO Earthwork 438 097 86 Completed 08/02 Brett Brown Sanitary Sewer 970-490 1855 Water Storm Sewer Concrete Streets Governors JRC Land Co LLC Eaton CO Earthwork 629 114 74 Completed 07/02 Ranch John Leffler Sanitary Sewer Phase II 970-454 2515 Water Storm Sewer Concrete Streets Ridge @ D WP of Evans Evans CO Earthwork 968 906 55 Completed 01/03 Prairie View Adam Buns Sanitary Sewer 303 530-4766 Water Storm Sewer Concrete Streets North Weld North Weld Eaton CO Earthwork 455 656 73 Completed 01/03 County Water County Water Water District District Transmission Allan Overton Line 970-356-3020 Kelly Farms Kelly Farms LLC Greeley CO Earthwork 697 167 67 Completed 12102 Phase III Brian Bartels Sanitary Sewer 970 381 5166 Water Storm Sewer Concrete Streets Completed Projects 12/5/2007 Project Name Owner Location Descnption Contract Amt Project dates Clearview Clearview Dev LLC Johnstown CO Earthwork 2 945 063 72 Completed 03/03 Phase III Brian Boos Sanitary Sewer 970-686-6233 Water Storm Sewer Concrete Streets Ashcroft Draw Meyer Farm Greeley CO Sanitary Sewer 1 086 914 30 Completed 10/2002 Sanitary Sewer Development LLC Phase II David Calvin 970 336 1000 Highland Ault Clarkson Land Ault CO Sanitary Sewer 229 883 27 Completed 12/02 Lift Station Billy McDivrtt 970 353 0802 City of Evans City of Evans Evans CO Water 449 013 92 Completed 03/03 Waterline Earl Smith Project 970 339 5344 St Michaels Ashcroft Dev LLC Greeley CO Earthwork 7 200 000 00 Completed 09/03 David Calvin Sanitary Sewer 970 336 1000 Water Storm Sewer Concrete Streets Fossil Ridge Executive Homes Windsor CO Earthwork 52 297 18 Completed 02/03 Sewer Crossing Bnan Boos Sanitary Sewer 970-686-6233 Waterford Place Trammel Crow Loveland CO Earthwork 1 319154229 Completed 09/03 Apartments Residential Sanitary Sewer Water Storm Sewer Concrete Streets Longsview Adare Homes Greeley CO Earthwork 383 335 10 Completed 08/03 Bill Purcell Concrete 303 220 5600 Streets 71 st Ave/28th St Ashcroft Dev LLC Greeley CO Earthwork 718 047 47 Completed 08/03 David Calvin Streets 970 336 1000 Non Potable Ashcroft Dev LLC Greeley CO Water 507 026 32 Completed 08/03 Water David Calvin 970 336 1000 Completed Projects 12/5/2007 Project Name Owner Location Description Contract Amt Project dates Dove Hill Patriarch Developers LaSalle CO Earthwork 1 378 439 75 Completed 07/03 Mark Strauss Sanitary Sewer 970 566 8880 Water Storm Sewer Concrete Streets GLIC Ditch Lining Ashcroft Day, LLC Greeley CO Storm Sewer 272 169 75 Completed 08/03 David Calvin 970 336-1000 WV 11th Filing Cotter Construction Windsor CO Earthwork 240 322 83 Completed 07/03 Dave Carlson Sanitary Sewer 970 221-4621 Water Storm Sewer Concrete Streets High Pointe Highpomte Inc Greeley CO Earthwork 252 264 55 Completed 08/03 Condos @ Curt Karlen Sanitary Sewer Kelly Farms 970-674 1299 Water Storm Sewer Concrete Streets Summer Park Highpomte Inc Greeley CO Earthwork 1 366 056 34 Completed 11/03 Village Curt Karlen Sanitary Sewer 970-674 1299 Water Storm Sewer Concrete Streets Johnstown Farms Lumberman s Investment Johnstown CO Earthwork 3 780 676 73 Completed 01/04 John Pierret Sanitary Sewer 972 702 8699 Water Storm Sewer Concrete Streets Tuscany Tuscany LLC Evans CO Earthwork 1 357 294 65 Completed 22/03 Carl Ford Sanitary Sewer 970-405 3388 Water Storm Sewer Concrete Streets Completed Projects 12/5/2007 Project Name Owner Location Descnption Contract Amt Project dates Baldridge Phase II Jack & Beverly Schneider Severance CO Earthwork 468 758 95 Completed 01/04 % Double Eagle Const Sanitary Sewer 970 223 3500 Water Storm Sewer Concrete Streets Johnstown Farms Lumbermans Johnstown CO Earthwork 458 571 55 Completed 01/04 Phase IV Investments Sanitary Sewer 972 702 8372 Water Storm Sewer Concrete Streets Seeley Lake Ogilvy Ditch Co Greeley CO Storm Sewer 268 574 47 Completed 02/04 Improvements 970 3524468 Town of Eaton Town of Eaton Eaton CO Water 539 976 16 Completed 01/04 24 Waterline 970-454 3338 Miscellaneous Waterford Place Kiewit Western Co Loveland CO Earthwork 74 479 17 Completed 03/04 303 979 9330 Habitat For Habitat For Greeley CO Earthwork 747819 19 Completed 06/04 Humanity Humanity Sanitary Sewer 970 351-6766 Water Storm Sewer Concrete Streets Governors Ranch JRC Land Company Eaton CO Earthwork 824 092 90 Completed 06/04 Phase III John Leffler Sewer 970-454 2515 Water Storm Sewer Clearview 2 Ph II Clearview Dev LLC Johnstown CO Earthwork 300 847 65 Completed 07/04 970-686-6233 Sewer Water Storm Sewer Erosion Control Concrete Streets Water Valley Trollco Inc Windsor CO Earthwork 5 194 538 00 Completed 11/04 South Trollco Ph I Martin Lind Sewer 970-686 5828 Water Storm Sewer Conduit Concrete Streets Completed Projects 12/5/2007 Project Name Owner Location Description Contract Amt Project dates Water Valley Trollco Inc Windsor CO Earthwork 5 598 320 00 Completed 11/04 South Metro Ph I Martin Lind Sewer 970-686 5828 Water Storm Sewer Conduit Concrete Streets Water Valley Trollco Inc Windsor CO Earthwork 3 192 835 00 Completed 11/04 South Metro Ph II Martin Lind Sewer 970-686 5828 Water Storm Sewer Conduit Concrete Streets Barefoot Farms Dave Barnett Windsor CO Earthwork 258 555 00 Completed 11/04 970-686 0525 Sewer Water Storm Sewer Erosion Control Concrete Streets Ridge @ Prairie D WP of Evans LLC Evans CO Earthwork 663 460 18 Completed 05/05 View Ph 5 Nick Francis Sewer 970 381 3591 Water Adam Buns Storm Sewer 303 877-4766 Erosion Control Concrete Streets Town Centre @ Fisbeck/Sheel Greeley CO Earthwork 178 940 00 Completed 06/05 St Michaels Winter Farm Roche Constructors Windsor CO Earthwork 4 180 000 00 Completed 08/05 Ryan Strub Sewer 970 356 3611 Water Storm Sewer Erosion Control Concrete Streets Completed Protects 12/5/2007 10 Project Name Owner Location Description Contract Amt Project dates Belmont Ridge Belmont Ridge Windsor CO Earthwork 4 331 039 00 Completed 09/05 Development LLC Sewer 970 662 0600 Water Storm Sewer Erosion Control Concrete Streets Cimarron Pointe Lockhart Consructors Firestone CO Earthwork 602 428 00 Completed 07/05 Sewer Water Storm Sewer Erosion Control Concrete Streets Terrace Green Terrace Green LLC Greeley CO Earthwork 174 921 00 Completed 10/05 Nick Francis Sewer 970 381 3591 Water Storm Sewer Concrete Streets Dove Hill Ph II Patriarch Builders LaSalle CO Earthwork 711 276 00 Completed 10/05 970 566 8880 Sewer Water Storm Sewer Concrete Streets Parker Meadows B & B Local Evans CO Earthwork 271 373 38 Completed 02106 Construction LLC Sewer 970-353 3141 Water Storm Sewer Concrete Streets Diamond Valley Bldg K Dohn Construction Inc Windsor CO Sewer 39 094 64 Completed 12/05 970-490 1855 Water King Surveyors Building King Surveyors Inc Windsor CO Earthwork 910 018 46 Completed 08/05 970-686 5011 Sewer Water Concrete Streets Completed Protects 12/5/2007 11 Project Name Owner Location Description Contract Amt Project dates Chubbuck Ditch Greeley Loveland Loveland CO Earthwork 44 235 63 Completed 07/05 Irrigation Company Sewer John Gauthne Streets 970 330-0855 City of Evans City of Evans Evans CO Earthwork 691 095 36 Completed 06/05 42nd Street 970 339 5344 Sewer Water Concrete Streets City of Evans City of Evans Evans CO Earthwork 571 406 66 Completed 09/05 Riverside Parkway 970 339 5344 Concrete Streets Cedar Estates Jewels Development Pierce CO Earthwork 117 712 26 Completed 07/05 970 206 1047 Concrete Streets State Hwy 257 Windsor CO Earthwork 683 731 29 Completed 02/06 Storm Sewer Streets WV South Five Hole Investments Windsor CO Earthwork 1 956 459 66 Completed 12/05 Hillside & Trollco Ph III Sewer Water Storm Sewer Concrete Streets Poudre River Ranch Double Eagle Greeley CO Earthwork 4 386 497 00 Completed 05/2006 Construction Sery Inc Sewer 970 223-3500 Water Storm Sewer Concrete Streets S Gate Sewer Trollco Inc Windsor CO Earthwork 1 346 415 72 Completed 05/2006 Interceptor 970-686 5828 Sewer Water Streets Highpoint Vista Double Eagle Windsor CO Sewer 3 826 565 44 Completed 05/2006 Construction Sery Inc 970-223 3500 Storm Sewer Water Valley Village Dohn Construction Inc Windsor CO Earthwork 521 856 27 Completed 05/2006 970-490-1855 Sewer Water Storm Sewer Concrete Streets Completed Projects 12/5/2007 12 ACCEPTANCE OF FUEL COST ADJUSTMENTS Bidders have the option to accept Fuel Cost Adjustments in accordance with the Revision of Section 109 - Fuel Cost Adjustment To accept this standard special provision, the bidder must fill in an "X" next to "YES" below No Fuel Cost Adjustment will be made due to fuel cost changes for bidders who answer "NO" If neither line is marked, the Department will assume the bidder rejects Fuel Cost Adjustments for this project After bids are submitted, bidders will not be given any other opportunity to accept or reject this adjustment (Mark only one line with an "X") X YES, I choose to accept Fuel Cost Adjustments for this project NO, I choose NOT to accept Fuel Cost Adjustments for this project (if neither line is marked, the default is "NO", I choose NOT to accept Fuel Cost Adjustments for this project 9 PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc , to cover the complete Work in place of the several kinds called for Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price RESPECTFULLY SUBMITTED 9�TiRVACTOR cD j �l nO�Z i natu 12/06/2007 g Date ao PYL'S2JJMt 'a1 �c�!,_ Title O`N'O' %,,,I�NI1N�1 License Number (If Applicable (Seal - if Bid is by c rporation) Attest Rev 10/20/07 Section 00410 Page 1 Project Name Owner Location Description Contract Amt Project dates Lighthouse Bay Landmark Construction Windsor CO Earthwork 574 183 15 Completed 0512006 Condos Solutions Sewer 970-686-0824 Water Storm Sewer Concrete Streets Johnstown Farms Ph II Lumbermen s Investment Johnstown CO Earthwork 614 300 37 Completed 04/2006 Corporation Water 972 702 8699 Storm Sewer Concrete Streets Faith Estates National Vision Eaton CO Earthwork 407 778 25 Completed 05/2006 Development Inc Water 970 396-6477 Storm Sewer Streets Center Park Lou Cangilla Greeley CO Sewer 115 709 91 Completed 05/2006 970 356 3343 Water Concrete Streets The Village @ St Michaels Macrum Building Systems Greeley CO Sewer 194 208 00 Completed 03/2007 (970) 590 2200 Water Non Potable Water Storm Sewer Concrete Streets Erosion Control WV Village Storm Water Valley Windsor CO Sewer 29 908 00 Completed 0212007 970-686 5828 Water Non Potable Water Storm Sewer Erosion Control Southgate Business Park Dohn Construction Inc Windsor CO Earthwork 4 131 167 00 Completed 12/06 970-490 1855 Sewer and Water Windsor Southgate LLC Storm Sewer 970-686 5828 Concrete Streets Windsor Commons Ft Collins Paving Windsor CO Sewer 364 878 00 Completed 0212007 (970) 686-0986 Water Storm Sewer Eagle Crossing Eagle Crossing Dev Inc Loveland CO Earthwork 5 300 000 00 Completed 08/2007 970-686-5828 Sewer Water Completed Projects 12/5/2007 13 Project Name Owner Location Description Contract Amt Project dates Storm Sewer Concrete Streets Wyndham Hill Ridge Development Frederick CO Earthwork 1 340 000 00 Completed08/2007 (970) 663 0575 Sewer Water Storm Sewer Concrete Streets McCloskey Commercial Edgewood Companies Greeley CO Sewer 1 425 000 00 Completed 08/2007 (970) 381 5166 Water Storm Sewer Erosion Control River Run @ Poudre River Snowdance Dev Greeley CO Sewer 1 166 064 00 Completed 09/2007 (970) 356 9787 Water Non Potable Water Storm Sewer Erosion Control Severance San Sewer Town of Severance Severance CO Sewer 1 450 000 00 Completed 0812007 Plaza Commercial Herrick Garnsey Greeley CO Demo 652 498 00 Completed 11/2007 (970) 539-0010 Erosion Control Sewer Water Storm Sewer Condwds Concrete Streets Completed Protects 12/5/2007 14 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive This statement must be notarized If necessary, questions may be answered on separate attached sheets The Bidder may submit any additional information he desires 1 Name of Bidder G H CxrtnrtUx1, Inc 2 Permanent main office address 3 When organized :1 E Ga-dEnDnw Mrdsx,11 80550 4 If a corporation, where incorporated Colorado 5 0 How many years have you been engaged in the contracting business under your present firm or trade names 11 yamm Contracts on hand (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion ) 7 General of Work performed by your company rd Utilities 8 Have you ever failed to complete any Work awarded to you? Db If so, where and why? 9 Have your ever defaulted on a contract? If so, where and whys 10 Are you debarred by any government agency's If yes list agency name U Rev 10/20/07 Section 00420 Page 1 11 List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction 12 List your major equipment available for this contract Attached 13 Experience in construction Work similar in importance to this project Attach 14 Background and experience of the principal members of your organization, including officers Attached 15 Credit available $ 10 ya hcn + 16 Bank reference Bank of Choice 17 Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER') yes 18 Are you licensed as a General CONTRACTOR? ye; If yes, in what city, county and state9 CDlcrado, Uan QLtiesWhat class, license and numbers? 19 Do you anticipate subcontracting Work under this Contract? pPq If yes, what percent of total contract's T/ and to whom' IV=b= 1oraip mffir. Gmtrol 20 Are any lawsuits pending against you or your firm at this time? rb IF yes, DETAIL Rev 10/20/07 Section 00420 Page 2 21 What are the limits of your public liability? DETAIL Attachs3 What company9 22 What are your company's bonding limitations? 23 The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications Dated at this 6th day of r 2007 C7H m ttnr imp Tim y Name of Bidder By Title preadEnt 1 MO �MHAPY � State of Colora:b " ) wr County of W-M T � Gmgxi L. Imo- bm being duly sworn deposes and says that he is - pmsidEnt of CLH Ccnstnntjm, hr- and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct Subscribed andswornto eefo^re me this 6th day of Dac6rbw 2007 '� / w / Notary Public My commission expires 06/28/10 Rev 10/20/07 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 151� of the contract ITEM MiMOM d •:�••• U■ •a•• • •ir.•• ir. Section 00430 Page 1 Bond Number COC49611 GLH Construction Inc & Merchants KNOW ALL MEN BY THFSE PRFSENTS that we, the underrjgned Bonding Company (Mutual) as Principal, and as 4urety, are hereby held and firmly bound unto the. City t Fort Collins, Colorado, as OWNER, in the sum of $ 5% of Attached Bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns PHE WNDIIION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 6075 Trolley Brick Restoration Project NOW THEREFORE, (a) If said Bid shall be iejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of contract attached hereto (properly romplet,ed in accordance with said Bid) and shall furnish a BOND for his faithfuL performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void otherwise the same shall remain in force 'ind effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid, and said Surety does hereby waive notice of any such extension Surety Companies executing bonds must be authorized to transact business in the State nf Colorado and be accepted by the OWNFR Rev 10/2=7 Section 00410 Page 3