Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - P724 HOWES STREET OUTFALL (2)CHANGE ORDER NO CO# SPIRGCRK-C-1 PROJECT TITLE Spring Creek Improvements at Lemay CONTRACTOR Grimm Construction Company Inc P 0 NUMBER 9926148 CHARGE NUMBER 50451639 529290 6 DESCRIPTION In preparing change orders show in order as separate numbered paragraphs the following 1 Reason for change 3 Change in contract cost 2 Description of change 4 Change in contract time 1 Field condition chages and change of scope 2 Increase of muck excavation line item and addition of grinder pump sanitary service 3 Contract total has been increased by $9450 00 for muck exc increase and $6701 25 for grader pump addrtior , for a new contract total of $244,530 45 4 Substantial Completion increased fifteen(15) days to May 24, 2001 Final Completion increased nine (9) days to May 31, 2001 (Attach additional sheets as required) ORIGINAL CONTRACT COST $228,379 20 TOTAL APPROVED CHANGE ORDERS $0 00 TOTAL PENDING CHANGE ORDERS $0 00 TOTAL THIS CHANGE ORDER $16,151 25 TOTAL % OF ORIGINAL CONTRACT, THIS CO 7% TOTAL % OF ORIGINAL CONTRACT, ALL CO'S 7% ADJUSTED CONTRACT COST $244,530.45 (Assuming all change orders a r d) ACCEPTED BY DATE 2f (Cons bfor's eppentattve) REVIEWED BY / In � DATE J��/ 6 (Project TV ager) APPROVED BY �� DATE 122 G/ (Senior Utilities Engineer) APPROVED BY �4K 6 � DATE (Utilities General Manager) APPROVED BY DATE (Purchasing Agent Over $30,000) CC City Clerk Purchasing NOTE Signature of Contractor indicates Contractor Project File agreement herewithin, including any adjustment Stormwater Finance Manager in contract sum or contract time Grimm Construction Cc, Inc 5989 West Louviers Avenue P O Box 236 Louviers, Colorado 80131 303/791-3600 303/791-1801 FAX May 4, 2001 Anderson Consulting Engineers, Inc. 2900 South College Avenue, Suite 313 Fort Collins, Colorado 80525 Ph. (970)-226-0120 Fax (970)-226-0121 Attn.: Brad Anderson Chris Pauley Mark Kempton Ref.: Spring Creek Channel Improvements Muck excavation beyond the contract quantity Grimm Construction Attached are copies of load counts for hauling mud from the excavation of the footers for the retaining walls The spreadsheet totals the tons delivered in rock and the total of load counts of mud hauled off from the excavation The total muck excavation per spreadsheet and invoices Is, cubic yards .TKJ K Grimm Construction requests the additional quantity ot,20"cy of muck excavation be approved for payment The total of,2315-cy at $ 45 00 per cubic yard contract price is $-9'9eO-M S L oO wD of q,NSo,o0 + y The existing material in th oundation area was not suitable to build the retaining wall to specs due to saturation prior to our excavation The location and elevation next to the creek caused the saturation We had to stabilize the area with the rock specified so that the tooter could be constructed Please do not hesitate to contact me if you have any questions or need clarifications Si ely, Tim Alley Protect Manager cc file 932 4L Grimm Construction Cc, Inc 5989 West Louviers Avenue P O Box 236 Louvers, Colorado 80131 303/791-3600 303/791-1801 FAX May 3, 2001 Anderson Consulting Engineers, Inc. 2900 South College Avenue, Suite 313 Fort Collins, Colorado 80525 Ph (970)-226-0120 Fax (970)-226-0121 Attn.: Brad Anderson Chris Pauley Mark Kempton QFGrimm Construction Ref - Spnng Creek Channel Improvements Change Order for Sanitary Sewer Service lift vault installation as directed Attached is the spreadsheet outlining the totals along with the invoices for materials and subcontracts for the construction of the sanitary sewer service vault and grinder pump The total cost for the additional Items is $ 6,701 25 complete As you will notice the total does not include labor, equipment or pipe and misc materials These Items are paid for In the original Item for the 4" sanitary sewer Please do not hesitate to contact me if you have any questions or need clarifications SI ce ely, Tim Alley Project Manager cc file 932