Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - P7680 CHANGE ORDER FORM PROJECT TITLE North College Corridor Improvements PROJECT NUMBER 30522500 CONTRACTOR Felsburg Holt & Ullevlg (PO`#9921386)� CHANGE ORDER NUMBER 2 In preparing change orders show In order as separate numbered paragraphs the following 1 Reason for change 2 Description of change 3 Change In contract cost 4 Change in contract time 1&2 See attached for reason and description of change 3 The contract cost will decrease by $29,160 00 4 There will be no change In contract time ORIGINAL CONTRACT COST $146,675 00 TOTAL APPROVED CHANGE ORDERS $49,575 00 TOTAL PENDING CHANGE ORDERS $0 00 TOTAL THIS CHANGE ORDER ($29,160 00) ADJUSTED CONTRACT COST $167,090 00 (Assuming all change orders approved) ACCEPTED BY SUBMITTED BY APPROVED BY APPROVED BY APPROVED BY cc City Clerk Contractor Purchasing Project File (Service Area Director) (Purchasing Agent) DATE 7 J9 & DATE �f DATE e- 3- 01 DATE DATE Transportation, Planning, 210 East Olive Street, PO Box 580, Fort Collins, CO 80522-0580, (970) 221-6608 NVELSBURG r4HOLT & ULLEVIG engineering paths to transportation solutions June 28, 2001 Ms Kathleen Reaves Senior Transportation Planner City of Fort Collins 210 E Olive Fort Collins. CO 80524 RE North College Avenue Improvements - Phase I FHU Reference No 00-230 Dear Ms Reavis With the recent development in regards to the roundabout alternative and our subsequent selection of Alternative 2 as the preferred design, we felt that now was a good time to summarize our current standing on some Scope of Work items As you are aware, the number of alternatives that were developed and evaluated for this protect is beyond what was originally contracted In general, two additional drawings (representing Alternatives 3 and 4) were created, capacity analyses were conducted and cost estimates prepared Since the roundabout alternative has now been removed from consideration, there is some budget remaining that can be used to help offset this additional work Additional Work Tasks Two drawings were produced in AutoCAD, capacity analyses were performed and cost estimates prepared The value of this work is summarized below FHU = EDAW = Subtotal $7,000 00 $1,500 00 2 Since the Transportation Board meeting on April 18, 2001 and the City Council meeting on May 8, 2001 were considered "updates" on the project, we still anticipate having two more presentations to each body, one each for the alternative recommendation and one each for the conceptual design of the recommended alternative As a result, six total meetings with 303 721 1440 fax 303 721 0832 f LMiueng cnm Greenwood Corporate Plaza 7951 E Maplewood Ave Ste 200 Grecnv.oud Village, CO SO 11 June 28, 2001 Ms Kathleen Reavis Page 2 these boards are anticipated, two more than our contract stated The value of these two meetings is FHU = EDAW = Subtotal = $1,810 00 $ 66000 $2,470 00 Our Scope of Work included two open houses and, therefore, since one has already occurred (May 30, 2001) and an open house is still anticipated near completion of the project to present the conceptual design, the open house scheduled for July 11, 2001 would be beyond our original Scope We anticipate the costs of attending one additional open house to be FHU = $ 98000 EDAW = $ 66000 Subtotal = $1,64000 4 We will also be completing VISSIM simulations and that work is anticipated to be approximately $1,150 00 Following is a summary of the Scope of Work budgetary issues Addition! Work Task Summary Alternatives Preparation = $ 8,50000 Additional Presentations = $ 2,47000 Additional Open House = $ 1,64000 VISSIM for Alternative 4 = $ 1,15000 Subtotal = $13,760.00 Credits Due the City 1 Since the City has been responsible for mailing announcements of the open houses, the fee proposal for that work can be deducted from our original scope As you are also aware, on May 8, 2001 City Council decided that a roundabout alternative should not be: considered in our evaluation of alternatives for the above referenced protect As a result, the services of RSL Crown, our roundabout sub-consUltant, is no longer necessary RSL Crown has invoiced a total of $7, i'00 (FHU Invoice No 7) of their original budget of $49,575 00 and, therefore, $41,875 00 could be reduced from the total contract amount