HomeMy WebLinkAboutRESPONSE - BID - 5521 BACKFLOW TESTING@
BID SCHEDULE - BID #5521
BACKFLOW ASSEMBLY
TESTING AND REPAIR
Award will be based on lowest total for all phases (1 through 3) of the Bid Schedule
1
F
3
G
5
Provide testing of any size PVB $ 0 per test X 76 = $
S �
Provide testing of any size RP $ per test X 55 = $/ %
Repair labor rates $�0 nu per hour X 6 hrs $
GRAND TOTAL
$® Minimum charge if any
Maximum material mark-up City will pay
1) < $500 00 + 10% Bidder's mark-up
2) > $500 00 + 8% Bidder's mark-up
/%
ova
Since miscellaneous materials and minimum charge will be a minor factors with this contract in
most eases, they will not be calculated in bid method of award, but contractor must honor both
mark-up rate and minimum charge
FIRM NAME ��1 1 "d,o4h/S
Are you a Corporation, Partnership, DBA, LLC, or PC
SIGNATURE i�lyUr2oG��/1
ADDRESS �� S�� Leh O�kS Dom_
/ohT CoA41,Vsz
PHONE/FAX# %70 -,227- % ,�%
5