television, sewage and drainage removal, traffic or other
control systems or water.
142 Unit Price Work --Work to be paid for on the basis
of unit prices.
143 Work --The entire completed construction or the
various separately identifiable parts thereof required to be
furnished under the Contract Documents Work includes
and is the result of performing or furnishing labor and
furnishing and incorporating materials and equipment into
the construction, and performing or furnishing services
and furnishing documents, all as required by the Contract
Documents,
144. Work Change Directive --A written directive to
CONTRACTOR, issued on or after the Effective Date of
the Agreement and signed by OWNER and recommended
by ENGINEER, ordering an addition, deletion or revision
in the Work, or responding to differing or unforeseen
physical conditions under which the Work is to be
performed as provided in paragraph 4 2 or 43 or to
emergencies under paragraph 6.23. A Work Change
Direclrve will not change the Contract Price or the
Contract Times, but is evidence that the parties expect
that the change directed or documented by a Work
Change Directive will be incorporated in a subsequently
issued Change Ovier following negotiations by the parties
as to its effect, if any, on the Contract Price or Contract
Time: as provided in paragraph 10 2.
145. Written A mendment--A written amendment of the
Contract Documents, signed by OWNER and
CONTRACTOR on or after the Effective Date of the
Agreement and normally dealing with the nonengineering
or nontechnical rather than strictly construction -related
aspects of the Contract Documents
ARTICLE, 2--PRELIMINARY MATTERS
Delivery of Bonds:
21 When CONTRACTOR delivers the executed
Agreements to OWNER, CONTRACTOR shall also
deliver to OWNER such Bonds as CONTRACTOR may
be required to furnish in accordance with paragraph 5.1.
Copies of Documents:
22. OWNER shall furnish to CONTRACTOR up to
ten copies (unless otherwise specified in the
Supplementary Conditions) of the Contract Documents as
are reasonably necessary for the execution of the Work.
Additional copies will be furnished, upon request, at the
cost of reproduction.
Commencement of Contract Times; Notice to Proceed:
2 3. The Contract Times will commence to run on the
thirtieth day after the Effective Date of the Agreement, or,
if a Notice to Proceed is given, on the day indicated in
the Notice to Proceed. A Notice to Proceed may be given
at any time within thirty days after the Effective Date of
the Agreement —in -ne-e will. the ^mow
safpmnenee to rg4a ]n.n_thAn oi4�
e{pi egening-er t, . ,a4ef the T,,�etwp DR
hiel4e-...-1'�lief:
ef�lie-Ag£eeirier��_ a�.
Starting the Work.'
24. CONTRACTOR shall start to perform the Work
on the date when the Contract Times commence to run,
but no Work shall be done at the: site prior to the date on
which the Contract Times commence to run.
Before Starting Contraction:
25 Before undertaking each part of the Work,
CONTRACTOR shall carefully study and compare the
Contract Documents and check and verify pertinent figures
shown thereon and all applicable field measurements.
CONTRACTOR shall promptly report in writing to
ENGINEER any conflict, error, ambiguity or discrepancy
which CONTRACTOR may discover and shall obtain a
written interpretation or clarification from ENGINEER
before proceeding with any Work affected thereby,
however, CONTRACTOR shall not be liable to OWNER
or ENGINEER for failure to report any conflict, error,
ambiguity or discrepancy in the Contract Documents,
unless CONTRACTOR knew or reasonably should have
known thereof
26 Within ten days after the Effective Date of the
Agreement (unless otherwise specified in the General
Requirements), CONTRACTOR shall submit to
ENGINEER for review.
26.1 a preliminary progress schedule indicating the
times (numbers of days or dates) for starting and
completing the various stages of the Work, including
any Milestones specified in the Contract Documents,
26.2. a preliminary schedule of Shop Drawing and
Sample submittals which will list each required
submittal and the times for submitting, reviewing and
processing such submittal;
2 6 2 1 In no case will.a schedule be acceptable
which allows less than 21 calendar days for each
review by Engineer
2 6 3 A preliminary schedule of values for all of the
Work which will include quantities and prices of
items aggregating the Contract Price and will
subdivide the Work into component parts in sufficient
detail to sere as the basis for progress payments
during construction. Such prices will include an
appropriate amount of overhead and profit applicable
to each item of Work.
2.7. Before any Work sit the site is started,
CONTRACTOR and OWNER shall eaeh deliver to the
ether OWNER, with copies to
ident' Fisd in the Supplementai-y-Gexditiens ENGINEER
certificates of insurance (and other evidence of insurance
.,think either of them.
I
EICDC GENERAL CONDITIONS 1910-8 (1990 Edition)