Loading...
HomeMy WebLinkAbout109445 CONNELL RESOURCES INC - CONTRACT - BID - 5482 ASPHALT OVERLAY PROJECT 2000 (22)I 0 . ry'I 0 0 0 0 Ki a GENERAL CONDITIONS ARTICLE 1--DEFINITIONS Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof. Ll Addenda --Written or graphic instruments issued prior to the opening of Bids which clarify, correct or change the Bidding Requirements or the Contract Documents 12 Agreement --The written contract between OWNER and CONTRACTOR covering the Work to be performed, other Contract Documents are attached to the Agreement and made a part thereof as provided therein 1 3. Application for Payment --The form accepted by ENGINEER which is to be used by CONTRACTOR in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents 1 4 Asbestos --Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration 1 5 Bid --The offer or proposal of the bidder submitted on the prescribed form setting forth the prices for the Work io be performed. 16. Bidding Documents --The advertisement or invitation to Bid, instructions to bidders, the Bid form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 17. Bidding Requirements --The advertisement or invitation to Bid, instructions to bidders, and the Bid form 1 8. Bonds --Performance and Payment bonds and other instruments of security. 1.9 Change Order --A document recommended by ENGINEER, which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 1 10. Contract Documents --The Agreement, Addenda (which pertain to the Contract Documents), CONTRACTOR's Bid (including documentation accompanying the Bid and any post Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement, the Notice to Proceed, the Bonds, these General Conditions, the Supplementary Conditions, the Specifications and the Drawings as the same are more specifically identil red in the Agreement, together with all Written Amendments, Change Orders, Work Change Directives, Field Orders and ENGMEER's written interpretations and clarifications issued pursuant to paragraphs 3 5, 3 6 1 and 3 6.3 on or after the Effective Date of the Agreement Shop Drawing submittals approved pursuant to paragraphs 6 26 and 6.27 and the reports and drawings referred to in paragraphs 4.2.I and 4 2 2 are not Contract Documents 1 11 Contract Price —The moneys payable by OWNER to CONTRACTOR for completion of the Work in accordance with the. Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11.9A in the case of Unit Price Work) 1.12 Contract Times --The numbers of days or the dates stated in the Agreement (i) to achieve Substantial Completion, and (n) to complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with paragraph 14 13. 1 13 CONTRACTOR --The person, firm or corporation with whom OWNER has entered into the Agreement. 114 defective --An adjective whichwhen modifying the word Work refers to Work that is unsatisfactory, faulty or deficient in that it does not conform to the Contract Documents, or does not meet U-ie requirements of any inspection, reference standard, test or approval referred to in the Contract Documents, or has been damaged prior to ENGINEER's recommendation of final payment (unless responsibility for the protection thereof has been assumed by OWNER at Substantial Completion in accordance with paragraph 14 8 or 14 10) 1.15 Drawings --The drawings which show the scope, extent and character of the Work to be furnished and performed by CONTRACTOR and which have been prepared or approved by ENGINEER and are referred to in the Contract Documents Shop drawings are not Drawings as so defined 116 Effective Date of the Agreement --The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver 117 ENGINEER --The person, firm or corporation named as such in the Agreement. 1,19. ENGINEER's Consultant --A person, firm or corporation having a contract with ENGINEER to furnish services as ENGINEER's independent professional associate or consultant with respect to the Project and who is identified as sufh in the Supplementary Conditions. L19 Field Order --A written order issued by ENGINEER which orders minor changes in the Work in accordance with paragraph 9 5 but which does not involve a change in the Contract Price or the Contract Times. EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ Crr( OF FORT COLLINS MODIFICATIONS (REV 9194)