Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
109445 CONNELL RESOURCES INC - CONTRACT - BID - 5482 ASPHALT OVERLAY PROJECT 2000 (18)
Article or Paragraph Article or Paragrapa Number Number Technical Data ...... . ... . • • • • 4 2 2 ENGINEER's-in general ... . ............. 9 Preconstruction Conference 28 Limitations on .......... ..... ... 9 13 Preliminary Matters .. 2 Preliminary Schedules 26 Premises, Use of .... .. 6 16-6 18 Price, Change of Contract 1 l Pnce, Contract --definition of 1 11 Progress Payment, Applications for 142 Progress Payment--retainage . - 142 Progress schedule, CONTRACTOR'S 2 6, 2 8, 29, 6 6, 6 29, 10 4, 15 2.1 OWNER's-in general .. .. . .... ... ... 8 Retainage .... ............... .... 14.2 Reuse of Documents ......... ...... ... . 37 Review by CONTEACTOR Shop Drawings and Samples Prior to Submittal ..... . ... 625 Review of Applications for Progress Payments .......... ... . 14.4-14 7 Right to an adjustment ............ ' .. 102 Rights of Way . 4.1 - Projel:t--definition of - ... Project Representative-- ENGINEER's Status During Construction 131 .. 93 Royalties, Patent Fees and Safe Structural Loading .... Safety-- 6 12 ... ..... ....6 18 Proje:t Representative, Resident --definition prompt payment by OWNER Property Insurance-- Additional of 133 8.3 57 and Protection ... .. .. .. 4.3.2, 6 16' 6.18, 6.20-6 21, 7 2, 13.2 general . ... ...... 6 20-6.23 Representative, CONTRACTOR's . 621 Y general Partial Utilization receipt and application of proceeds .. Protection, Safety and .. 6 Punch list 5 6-5 10 5 15, 14 10.2 . 5.12-5 13 20-6 21, 13 2 14 11 Samples -- definition of . general . ..... ... .......... Review by CONTRACTOR Review by ENGINEER ............ ..... ...... 1.34 . 6 24-6 28 . ....... . 625 626, 627 Radioactive Material-- related Work .. ... . .. ........ 628 defintion of 1.32 submittal of - ... .. .......... 6.24.2 general . . ....... 4.5 submittal procedures .. .... ... .... 625 OWNER's responsibility for Recommendation of Payment . 14 8 10 4, 14 5, 14 13 Schedule of progress ....... 2 6, 2 8-2.9, 6 6, 6.29, 10 4, 15 2 l Record Documents . _ .. ....... 6 19, 14 12 Schedule of Shop Drawing and Sample Records, procedures for maintaining ... Refeience Points .. . .... ... .... 28 . 4.4 Submittals Schedule of Values . ... ..... 2.6, 2 8-2.9, 6.24-6 28 . 2 6, 2.8-2 9, 14 1 Refeience to Standards and Specifications Schedules -- of Technical Societies .. 3 3 Adherence to � 152.1 a Regulations, Laws and (or) Rejecting Defective Work .. Related Work-- 6 14 9.6 Adjusting ...... ............. Change of Contract Times Initially Acceptable .. ..... ... 66 104 . ..... 2.8, 2 9 at Site .......... .. .. Performed prior to Shop Drawings 7 1-7.3 Preliminary ... .................... Scope of Changes . . .. 2.6 ........ 10 3-10 4 and Samples submittals review . ..... . 6.28 Subsurface Conditions .. . .............. 4-2.1.1 Remedies, cumulative . ... .. . Removal or Correction of Defective Work 174, 17.5 13 11 Shop Drawings -- and Samples, general .............. 6,24-6.28 rental agreements, OWNER approval required 114 5.3 Change Orders & Applications for replacement of ENGINEER, by OWNER .... Reporting and Resolving . 82 Payments, ,and ... ............... definition of ...................... 9.7-9.9 1.35 Discrepancies .... .... 2 5, 3.3.2, 6,14 2 ENGINEER's approval of ............... 36.2 Reports-- ENGINEER's responsibility and Drawings ... .. ..... and Tests, OWNER's responsibility 42 1 84 for review . ........... related Work ....... . .. 9.7, 6.24-6.28 ............ 628 Resilient and Project Representative-- review procedures .............. 2 8, 6.24-6.28 definition of ......... ... provision for ........ .. 133 9.3 submittal required ................... Submittal Procedures . ... 6.24.1 I ... 6.25 $1 Resident Superintendent, CONTRACTOR's - .. 62 use to approve substitutions ....... ....... 67.3 Responsibilities-- CONTRACTOR'S -in general 6 Shown or Indicated .... ............... Site Access ... . .................. 43.1 7.2, 13.2 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/94) xi