Loading...
HomeMy WebLinkAbout109445 CONNELL RESOURCES INC - CONTRACT - BID - 5482 ASPHALT OVERLAY PROJECT 2000 (17)Article or Paragraph Number Article or Paragraph Number Special, required by ENGINEER ... 96 Tests and Approval ...... 8.7, 13.3-13 4 Insurance -- Acceptance of, by OWNER ... .. 5 14 Additional, required by changes in the Work . 1 L4 5 9 Before starting the Work .... ... . ... 27 Bonds and --in general ........ .. .. 5 Cancellation Provisions 5 8 Certificates of . 2 7, 5, 5.3, 5 4.11, 5 4 13, 5 6 5, 5.8, 5 14, 9 13.4, 14 12 completed operations 5.4 13 CONTRACTOR's Liability 5 4 CONTRACTOR's objection to coverage 5 14 Contractual Liability .. ..... ... 54 10 deductible amounts, CONTRACTOR's responsibility .. . . .. . . .. . 5 9 Final Application for Payment 14 12 Licensed Insurers .... . .... . ... . 5 3 Notice requirements, material changes 58, 105 Option to Replace 5 14 other special insurances 5 10 OWNER as fiduciary for insureds 5 12-5 13 OWNER's Liability 5 5 OWNER's Responsibility . .. 85 Partial Utilization, Property Insurance 5 15 Property . .. 5 6-5 10 Receipt and Application of Insurance Proceeds ... ..... 5 12-5 13 Special Insurance 5 10 Waiver of Rights .. 5 11 Intent of Contract Documents ... 3 1-3 4 Interpretations and Clarifications .. 3 63,94 Investigations of physical conditions 4.2 Labor, Materials and Equipment ... 6 3-6 5 Lands -- and Easements .... .. 84 Availability of .... ..... .. . 4.1, 84 Reports and Tests 84 Laws and Regulations --Laws or Regulations -- Bonds ..... ... 5.1-5 2 Changes in the Work . ...... 10.4 Contract Documents ..... .. 3 1 CONTRACTOR's Responsibilities .... 6 14 Correction Period, defective Work .. 13.12 Cost of the Work, taxes . ..... ... 11.4 5.4 definition of ............ ..... 1.22 general . ...... .. 6.14 Indemnification ...... ...... ... 6 31-6 33 Insurance .... . ..... ........ .. 5 3 Precedence . ......... 3 1, 3 3.3 Reference to ... ...... .. ... .. 3 3 1 Safety and Protection ... ... .. 620, 13 2 Subcontractors, Suppliers and Others 6 8-6 11 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDMON) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/94) Tests and Inspections ... ........... 13.5 Use of Premises . 6,16 Visits to Site ... ........ 92 Liability Insurance— CONTRACTOR's ..... ....... ...... 5.4 OWNER's . .. ... . ..... .. .... 5.5 Licensed Sureties and Insurers ... ........... 5.3 Liens -- Application for Progress Payment ......... 142 CONTRACTOR's Warranty of Title ........ 14.3 Final Application for Payment .. ..... ... 14.12 definition of . ..... ........... . 123 Waiver of Claims . ............ .... 14 15 Limitations on ENGINEER's authority and responsibilities ......... ............ 9 13 Limited Reliance by CONTRACTOR Authorized .. ... ............ 4 2 2 Maintenance and Operating Manuals -- Final Application for Payment ....... .... 1412 Manuals (of others) -- Precedence .. .. ............ . 3 3.3.1 Reference to in Contract Documents ....... 3 3 1 Materials and equipment -- furnished by CONTRACTOR ...... .... 6.3 not incorporated in Work .. ............ 142 Materials or equipment --equivalent ...... 6 7 Mediation (Optional) . .. .... .. 167 Milestones --definition of . . ........ .. 124 Miscellaneous -- Computation of Times . . ............. 17 2 Cumulative Remedies . .. ........ ... 174 Giving Notice ... . ....... .. 171 Notice of Claim .... ...... ........... 17 3 Professional Fees and Court Costs Included 17.5 Multi -prime contracts ................ .. .. 7 Not Shown or Indicated .. .... ......... 4 3 2 Notice of -- Acceptability of Project ............. 14 13 Award, definition of . .. .... ........ 1.25 Claim ...... ... .. ............. 173 Defects ..... .. ................... 13 1 Differing Subsurface or Physical Conditions . 4.23 Giving . .. ..................... . 17.1 Tests and Inspections ........... ..... 13 3 Variation, Shop Drawing and Sample ...... 627 Notice to Proceed -- definition of ........................ 1.26 giving of .... .. ................... 2.3 Notification to Surety ..... .............. 10.5 Observations, by ENGINEER ............ 6.30, 9.2 Occupancy of the Work .. ... 5.15, 6 30 2 4, 14.10 Omissions or acts by CONTRACTOR ...... 6.9, 9 13 Open Peril policy form, Insurance ........... 56.2 Option to Replace ... .......... ........ 5.14 ix