Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
109445 CONNELL RESOURCES INC - CONTRACT - BID - 5482 ASPHALT OVERLAY PROJECT 2000 (16)
�l 0 0 0 0 Article or Paragraph Number "Or Equal" Items . 67 Other work ... . ....... 7 Overtime Work --prohibition of . 63 OWNER -- Acceptance of defective Work .. 13 13 appoint an ENGINEER .. 82 as fiduciary .. ... 5.12-5 13 Availability of Lands, responsibility .. 4.1 definition of ... 1 27 data, furnish ... ... .... 83 May Cornzct Defective Work .. .. .. .. 13 14 May refuse to make payment .. .. ... 147 May Stop the Work .. 13.10 May Suspend Work, Terminate . . .. . 88, 13 10, 15 1-15 4 Payment, make prompt 8.3, 14.4, 14 13 performance of other work .. ..... . 7 1 permits and licenses, requirements ... ..... 6 13 purchased insurance requirements ... 5 6-5 10 OWNER's-- Acceptanc:e of the Work .. 6 1025 Change Orders, obligation to execute 86, 104 Communizations . 8 1 Coordination of the Work 74 Disputes, request for decision 9.11 Inspections, tests and approvals 87, 134 Liability Insurance 5 5 Notice of Defects ... ... . 13 1 Representative --During Construction, ENGINEER's Status . 9 1 Responsibilities - Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material ... 8.10 Change Orders 86 Changes in the Work ... .... 101 communications .. .. .... 8 1 CONTRACTOR's responsibilities .. 8.9 evidence of financial arrangements ...... 8.11 inspections, tests and approvals ... .. 87 insurance ....... . .. ...... 85 lands and easements ....... ...... 8.4 prompt payment by ... ............ . 83 replacement of ENGINEER ..... .... 8.2 reports and tests . ............ . . .. 84 stop of suspend Work ....... 8.8, 13.10, 15.1 terminate CONTRACTOR's services ..... . ..... ... . 8.8, 15.2 separate rizpresentative at site . ..... ... . 9.3 testing, independent ..... .... .. .... 13.4 use or occupancy of the Work .... . . 5.15, 6.30 2 4, 14 10 written consent or approval required . . ......... 9.1, 6 3, 11.4 Article or Paragraph Number written notice required 71, 9 4, 911, 11.2, 11.9, 14.7, 154 PCBs -- definition of ....... 1.29 general ......... ... .. 45 OWNER's responsibility for 810 Partial Utilization -- definition of ... .... .. .. .. .... 128 general 6 30 2 4, 14 10 Property Insurance .. 5.15 Patent Fees and Royalties ...... 6.12 Payment Bonds .... .... .......... ... 5 1-5.2 Payments, Recommendation of .. .. 14.4-14 7, 14 13 Payments to CONTRACTOR and Completion -- Application for Progress Payments .... 14.2 CONTRACTOR's Warranty of Title 14.3 Final Application for Payment .... ..... 14 12 Final Inspection .... . ..... . ...... 14 11 Final Payment and Acceptance 14.13-14 14 general 83, 14 Partial Utilization .. ... . . . 14 10 Retainage .. .... 142 Review of Applications for Progress Payments .. ... 14.4-14 7 prompt payment ... ....... 93 Schedule of Values 14 1 Substantial Completion . 14 8-14.9 Waiver of Claims 14.15 when payments due 144, 14 13 withholding payment .. 147 Performance Bonds 5 1-5.2 Permits 6.13 Petroleum -- definition of 1.30 general .... 45 OWNER'S responsibility for .. 8 10 Physical Conditions -- Drawings of, in or relating to ..... 42 12 ENGINEER's review . .. ... ...... 42.4 existing structures . .... .... ....... 42.2 general 4.2 1.2 ... . . ........ ....... . Notice of Differing Subsurface or, . ....... 42.3 Possible Contract Documents Change . .... 42.5 Possible Price and Times Adjustments ...... 4.2.6 Reports and Drawings ..... ..... .... 42.1 Subsurface and . .... . . .. ... ....... 4.2 Subsurface Conditions ..... .. ....... 4.2 1.1 Technical Data, Limited Reliance by CONTRACTOR Authorized ... ..... 42.2 Underground Facilities -- general . . ... .... ... ....... 4.3 Not Shown or Indicated ..... .... 4.3.2 Protection of .... ....... . 4.3, 6 20 Shown or Indicated .... ..... .... 4.3.1 td{ EJCDC GENERAL CONDITIONS 1910-8 (1990 EDMON) kkkJJJ x w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/94)