HomeMy WebLinkAbout109445 CONNELL RESOURCES INC - CONTRACT - BID - 5482 ASPHALT OVERLAY PROJECT 2000 (7)Q
0
I
I
N
GENERAL CONDITIONS
OF THE
CONSTRUCTION CONTRACT
These GENERAL CONDITIONS have been developed by
using the STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT prepared by the Engineers
Joint Contract Documents Committee, EJCDC No 191M
(1990 Edition), as a base Changes to that document are
shown by underlining text that has been added and striking
through text that has been deleted A vertical bar is displayed
in the left margin for either added or deleted text
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
WITH CITY OF FORT COLLINS MODIFICATIONS (REV 9/94)
�k'