Loading...
HomeMy WebLinkAboutBID - 5473 MISCELLANEOUS CONCRETE PROGRAM ANNUALa City of Fort Collins 0 Adminis Live Services Purchasing Division CITY OF FORT COLLINS INVITATION TO BID BID #5473 MISCELLANEOUS CONCRETE PROGRAM BID OPENING FEBRUARY 24, 2000, 3 OOP.M. (our clock) Sealed bids will be received and publicly opened at the office of the Director Of Purchasing and Risk Management, 256 West Mountain Avenue, Fort Collins, Colorado 80521, at the time and date noted on the bid proposal and/or contract documents Bids must be received at the Purchasing Office prior to 3:OOp m. four clock), February 24, 2000. A copy of the Bid may be obtained as follows - Call the Purchasing Fax -line, 970-416-2033 and follow the verbal instruction to request document #25473 (The bid number must be preceded by a 2 when using the Fax -line.) Download the Bid from the Purchasing Webpage, Current Bids page, at www ci fort-collins co us\CITY_HALL\PURCHASING then via the Current Bids pushbutton Come by Purchasing at 256 W Mountain Ave , Fort Collins, and request a copy of the Bid Special Instructions All bids must be properly signed by an authorized representative of the company with the legal capacity to bind the company to the agreement Bids may be withdrawn up to the date and hour set for closing Once bids have been accepted by the City and closing has occurred, failure to enter into contract or honor the purchase order will be cause for removal of supplier's name from the City of Fort Collins' bidders list for a period of twelve months from the date of the opening The City may also pursue any remedies available at law or in equity Bid prices must be held firm for a period of forty-five (45) days after bid openings Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained in the City's specifications initially provided to the bidder Any proposed modification must be accepted in writing by the City prior to award of the bid Only bids properly received by the Purchasing Office will be accepted All bids should be clearly identilied by the bid number and bid name contained in the bid proposal No proposal will be accepted from, or any purchase order awarded, to any person, firm or corporation in default on any obligation to the City Bids must be furnished exclusive of any federal excise tax, wherever applicable 256 W Mountain Avenue • PO Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 REVISION OF SECTION 614 TRAFFIC CONTROL DEVICES Section 614 of the Standard Specifications is hereby revised as follows Subsection 614 15 shall be revised as follows 'I Ills work shall consist of furnishing, installing, moving maintaining and removing temporary traffic signs, advance warning arrows panels, barricades, channehzing devices, and delineators as required by the latest revisions of the "Manual on Uniform Traffic Control Dcvices loi Sticets and Highways" (MUI'CD), the City of Fort Collins' "Work Area Traffic Control Handbook", and the "City of Fort Collins Design and Construction Ci teria , Standards and Specifications for Streets, Sidewalks, Alleys and Other Public Ways", July 1996 ]n the event of a conflict between the MUICD criteria and the City's criteria the City's enters shall govern When a device is not in use, the Contractor shall remove it from the project for the period it is not needed Devices temporarily not in use shall, as a minimum, be removed four the area Moving will include devices removed from the proJcct and later returned to use Payment shall be made for the maximum number of each type of haffie coati of device bang used at one given time per clay Fraffie control devices shall be placed and/or stored in the City right-of-way in such a manner that minimizes the hazards to pedestrians, bicyclists and vchicics Traffic control devices shall be removed Irons the from the site immediately upon completion of the Mork for anv street(s) Subsection 614 16 shall include the following All traffic control devices placed for this project must meet or c\ceed the minimum standards set forth in lire MUTCD All traffic control devices shall be clean and in good operating condition when delivered and shall be maintained in that manner on a daily basis All traffic control devices shall be clearly marked and free of crossed out information or any other form of defat ci rent that detracts from the purpose for which they are intended (r e crossed out infra nwtion, information written in long -hand style etc ) Additionally, any sign blank with sign faces on both sick,, must have lire back sigh face covered when in use to avoid confusion to motorists travehng in the opposite direction and other potentially affected parties, such as residents affected by any information the sign may present Subsection 614 20 shall be revised as follows traffic control through tine construction areas IS the responsibility of the Contractor For all locations, a I'taffic Control Plan shall be pupaied The Traffic Control Plans shall be on City supplied forms The Traffic Control Plans shall be submitted for approval to City Traffic Operations by 12 00 noon, two working days pilot to the conunenctinenl of work (Note Traffic Control Plans for work done on Monday and Tuesday shall be submitted the previous Friday by 9 00 a or ) All plans shall be delivered to City Traffic Operations, 625 Ninth Street Facsimiles of plans shall not be allowed No phase of the construction shall start until the Traffic Control Plan has been approved Failure to have an approved I iatfic Control Plan shall constitute cause for the City to stop work, as well as the Contractor's forfernuc of payment for all work and materials at that location, with no adjustment in the contract time Fhe I raIfie Control Plan shall include, as a minimum, the following 10 0 REVISION OF SECTION 614 I'RAFFIC CON'PIiOL DEVICES (1) A detailed diagram which shows the location of all sign placements including advance construction signs (if not previously approved) and speed limit signs, method, length and time duration for lane closures, and location of flag persons (2) A tabulation of all traffic control devices shown on the detailed diagram including, but not limited to construction signs, vertical panel vertical panel with Tight type I Type II, and Type III barricades cones, drum channehzing devices, advance warning flashing or sequencing arrow panel Ccitam tiattic control devices may be used for more than one operation of phase HOW,Vei, all devices required for any particular phase must be detailed and tabulated for each phase (3) Number of flaggei s to be used (4) Parking Restrictions robe m of feet Approval of the proposed method of handling traffic rs intended to indicate those devices Im which payment is to be made Such approval sloes not reheve the Contractor of liability specifically assigned to him under this contract Parking RestnUron Plans shall be submitted and approved which show the location and quantity of "NO PARKING" signs, the clan, to be placed, and the (late to be removed The plans shall be prepared on City supplied forms The Parking Restriction Plans shall be submdted to City "traffic Operations by 12 00 noon, two working (lays prior to the conuriencemer❑ of work (Note Parking Restriction Plans for work done on Monday and Tuesday shall be submitted the previous Friday by 9 00 a on ) All plans shall be delivered to City Traffic Operations, 625 Ninth Sueet Facsimiles of plans shall not be allowed No phase of the construction shall start until the Parking Restriction Plan has been approved Failure to have an approved Parking Restriction Plan shall constitute cause for the City to stop work, as well as the Contractor's forfeiture of payment for all work and materials at that location with no adjustment in the contract time Subsection 614 21 shall be revised as follows Traffic Control Management shall be performed by a Tiaffie Control Supervisor (TCS) The TCS(s) shall possess a current American liattic Safety Services Association (ATSSA) certification as a Worksite Traffic Control Supervisor or Colorado Contractor's Association (CCA) certification as a Tiaffie Control Supervisor (Proof of certification shall be presented to the City'liaffic Control Manager, and when requested by a City representative, for each TCS utrlrzed on this project ) The TCS shall have a minimum of one year experience as a ,citified I CS The FCS shall be equipped with a cellular phone I he cost of this phone shall be incidental to the day or hour pay inn for '1 CS The ICS's duties shall include, but not be limited to (1) Pr,pai mg, revising and submitting Traffic Control Plans as requited (2) Duc,t supervision of project flaggers (3) Coordinating all traffic control related operations, including those of the Subcontractors and suppliers (4) Coordinating project activities with appropriate police and fire control agencies, Transfort, school districts and other affected agencies and parties prim to construction typed hand delivered 11 r REVISION OF SECTION 614 TRAFFIC CONTROL DEVICES notification to all bits messes and residents at least 24 hours pilot to construction (The nonfication of residents and businesses may be accomplished by a iepresentauve of the TCS ) (5) Maintaining a project traffic control diary which shall become port of the City's project records (6) Inspecting traffic control devices on every calendar day tot the duration of tilt project (7) Insuring that haf fie control devucs are functioning as requned (S) Overseeing all tcquiremenis coveted by the plans and specifications which contribute to the convenience safety and orderly movement of traffic (9) Flagging (10) Setting up ttaffrc control devices Notification of residents and businesses ~hall be the responsibility of file TCS and shall consist of distributing letters indicating the nature of the work to be completed, any special instructions to the residents (i e limits on lawn watering during concrete pouring, etc), the dates and times of the work, and the parking and access reshrctrons that will apply, as well as thorough information placed on "NO PARKING" signs Sample letters may be provided by the City Represcntdhve, and shall be distributed Pilot to the commencement of each phase of the Nvoik Approved letters shall be distributed a minimum of 24 hours prior to the commencement of work (Note The tune fiame criteria for distributing letters is the same as for posting "NO PARKING" signs ) The cost for fit eparutg and distributing the letters shall be included in the cost for 7 CS Ttaffic control management shall be mmntaincd on a 24 hour pet day basis The Contractor shall make arrangements so that the Iraffic Control Supervisor or his approved representative will be available on evety winking day, "on call" at all tunes mid available upon the City's request at other than normal working hour The ICS's will be paid only tot days the Contractor works, and as duected by the Engineer On weekends and other days the Contractor is not working, tht I CS rs dl not be paid Tune spent maintaining signs on the weekends, holidays, bad weather days, and other days the Contractor does not work shall be included in the unit prices for the equipment ['line sprit setting up equipment, modifying equipircnt, and maintaining equipment shall be included in the unit pules for the equipment All hafflL control devices ~hall be placcd nuclei the wpeivrsion of a I tattle Control Supervisor The Traffic Control Supervisor shall have up to date copies of the City of Fort Collins' "Work Area Traffic Control Handbook", and Part VI of the MUfCD, pertaining to traffic controls for street and highway construction available at all times Subsection 614 23 shall be revised as follows Quantities to be measured tot eonstructron traffic conuol dlvices shall be the number of units of the various sizes and desciiptions listed below Construction Traffic Signs Stze A Sans - 0 01 to 9 00 Square Feet Sve 6 Signs - 9 01 to 16 00 Square Feel "NO PARKING" Sign with Stand will be measured and paid tot separately and not included in the item tot Sim A Signs "NO PARKING" Sign with Stand shall consist of d metal sign attached to a device (stand) 12 REVISION OF SECTION 614 TRAFFIC CONTROL DEVICES such as a Vertical Panel of Typc I Bamicade The sign mateual and stand shall be approved prior to placement by the City Representatve 'I lie sign material and stand will not be measured and paid for separately but shall be included In the Connact Unit Price lot "NO PARKING" Sign with Stand I'Ine cost for "NO PARKING" Sign with Stand shall Include delrvety, rental, setup modification, maintenance, and pickup "NO PARKING" signs must remain in place until the strc el is open to tratflc The "NO PARKING" signs shall be in effect lot one or two days only In rot to constiur non Traffic channelizmg devices consisting of vertical panel, cones, of drum channelizmg devices will be measured by the unit Bamcade warning lights shall be measured and paid for separately if approved by the Engmeci Advance Wainmg plashing of Sequencing Anow Panels will be measured by the unit The numbei of Traffic Contiof Supei visors shall he approi ed by the Enguteei prior to each days work The quantity to be measured lot Traffic Control Supervisor will be the number of authorized days perfointed by the Tiatfic Contiol Supervisor An authorized day shall be any day or patron of a day, authorized by the City Representative, that constimcnon operation would require a fraffic Connol Supervisor "Orr Call" and Project inspections on all other days will not be measured and paid for separately but shall be included in the work The cost for setting up equipment, modifying egmpmcnt, and maintaining cqurpment (not Including "NO PARKING" Sign with Stand) during authorized (lays shall be Included in the Contract Unit Price for )affic Control Supervisor pet day If a TCS(s) IS used for an euthoi ztd day, but not lot the entire day the TCS shall be paid at the Contract Unit Price for "Traffic Control Supervisor" at the per hout rate the Pei Day TCS item is based on a minimum 10 how clay The quantity to be measured for fagging will be the total number of hours that flagging is actually used as authorized Ifours of flagging In excess of those authorized shall be at the Contractor's expense Flagger breaks shall be included in the Connact Unit Pirce for Flagging file method for covering Flagger breaks shall be approved by the Engmeci Flagging outside of the construction work hours will not be paid for under the tetras of this contract unless authorized In writing by the Engmem Flagget stand-by tune will not be paid tot under the teens of this contract In locations where naffic control is set up and the work is not performed due to Contractor caused delays, the traffic control shall not be paid for undo the tei ins of this contract The costs foi advance warning "NO PARKING" signs for periods In excess of 24 hours print to the advancement of work, including those Instances when said signs have been changed of otherwise updated to reflect current schedules, will not be paid for under the terms of this contract unless authorised by the City Representative in writing In addition, the Owner shall deduct Isom conipcnsatiou due the Contiactot $1000 lot each heroic control device per day for said conditions including "NO PARKING" signs and any signs which are not removed front the site immediately upon completion of the work Subsection 614 24 shall be tcvised as follows The cost lot Traffic Connol Devtees, not including "NO PARKING" Sign with Stand, shall include delivery, rental, and pickup The cost fot setting up equipment modifying equipment, and maintaining equipment will be paid for under the Contract Unit Price for fCS as desciibed above 13 1 REVISION OF SECTION 614 TRAFFIC CONTROL DEVICES 'fire cost for "NO PARKING' Sign with Stand shall mclude delivery rental, setup, modification, maintenance, and pickup Payment shall be full compensation tot fuimshwg eiectng maintaining, moving removing and disposing of constuctron taffic control devices necessaty to complctc the work All eonshuLtion tatfie control devices which ate not permanently incorporated into the project will temam thL property of the Contractor The accepted quantities will be paid tot at the contract unit Price for cash of the pay items listed below Pay Item Unit 61401 "NO PARKING' Sign with Stand 61402 VCitLal Panel Without Light 61403 TypL 1 Bau iLade W dhout Light 61404 Type II Banrcade Without Light 61405 Typc III Barricade Without Light 61406 Sizi, A Sign With Stand 61407 Size 13 Sign With Stand 61408 Size A Specialty Sign - Cost of manufactutuig 61409 Sizt, 13 Specialty Sign - Cost of manulacmr rig 614 10 614 11 Safely Fence 614 12 Light - Steady Buin 614 13 Light- plashing 614 14 AdvanLL Warning Plashing of Sequencing Avow Panel 614 15 Traffic Control Supervisor Per Day 614 16 ftatfic Control Supervisor Pet How 14 Per Day Pei Each Per Day Per Each Pet Day Per Each Pei Day Pei Each Pcr Day Per Each Per Day Per Each Pet Day Pei Each Each Each Conc With Reflective Strip Pei Day Per Each Pei Day Per Roll Pei Day Per Each PLr Day Per Each Pci Unit Pei Day 0 REVISION OF SECTION 614 TRAFFIC CONTROL DEVICES 614 17 Flagging Pei Each Per Hom 1 he initial manufacturing will be paid tot Specialty Signs per unit and the actual use paid for under the appropriate unit cost foi Size A of Size B sign Ihis item shall apply to new signs only Once manufactmed they may he used throughout the project Upon completion of the work, the Specialty Signs shall be refill tied to the Contractor Flagger hand signs will not be measured and paid for separately, but shall be included In the work The flaggeis shall be piovided with electronic communication devices when requued 'Ibcse devices will not be maasuied and pail for separately but shall be Included ui the work the cost of batteries, electricity and/or tuel tot all lighting or warning devices will not be paid tot separately but will be considered subsidiary to the rent Sand bags will not be measured and paid tot sepmately but shall be included in the work The Contractor may piovide laiger construction traffic signs than those typically used in aceoidanee with the MITFCD, if approved, however, payment will be made for the typical panel vzc Fhe City shall not be iesponsible foi any losses or damage duce to thclt of vandalism SPECIAL CONDITIONS FOR WORK ON ARTERIALS AND COLT ECTORS NOTE CROSS STREE I I'RAI�FIC SI IALL 13E MAIN I AINED A I ALL'I IMES UNLESS AUTI IORIZED BY 'I IIE ENGINEER IN WRITING NOTE FULL CLOSURES ON ARTERIALS AND COLLECFORS, INCLUDING 'IHOSE LISTED ABOVE, WILL 13E ALLOWED UNDER EXIREME CIRCUMSTANCES AND ONLY UPON APPROVAL OF I IIE ENGINEER PLANS SIIALL BE APPROVED A MINIMUM OI' ONE WEEK PRIOR'10 THE COMMENCEMENT OF WORK AND/OR FHE TIME REQUIRED TO ADEQUAIELY NOTIFY THE PUBLIC'IHROUGH THE MEDIA SPECIAL CONDITIONS FOR WORK ON RESIDENT IAL S I REE FS NO'l E FULL CLOSURES ON ALL RESIDENTIAL S I REF'I S SHALL BE ALLOWED AS SHOWN ON THE TRAFFIC CONTROL PLANS 15 LIT Bidders must be properly licensed and secure necessary permits wherever applicable Bidders not responding to this bid will be removed from our automated vendor listing for the subject commodities The City may elect where applicable, to award bids on an individual item/group basis or on a total bid basis, whichever is most beneficial to the City The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities Sales prohibited/conflict of interest no officer, employee, or their dependent or person residing in and sharing the expenses of their household, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services This rule also applies to subcontracts with the City This shall not apply to members of any authority, board, committee or commission of the city, other than the members of the City Council Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited Any vendor knowing of this type of activity is encouraged to report in confidence to the Director of Purchasing and Risk Management, Director of Finance, City Attorney or City Manager so the matter can be dealt with Freight terms unless otherwise noted, all freight is F" O B Destination, Freight Prepaid All freight charges must be included in prices submitted on proposal Discounts any discounts allowed for prompt payment, etc , must be reflected in bid figures and not entered as separate pricing on the proposal form Purchasing restrictions your authorized signature of this bid assures your firm's compliance with the City's purchasing restrictions A copy of the resolutions are available for review in the Purchasing Office or the City Clerk's Office Cement restrictions City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel Collusive or sham bids any bid deemed to be collusive or a sham bid will be rejected and reported to authorities as such Your authorized signature of this bid assures that such bid is genuine and is not a collusive or sham bid Bid results for information regarding results for individual bids send a self-addressed, self -stamped envelope and a bid tally will be mailed to you Bid results will be posted in our office 7 days after the bid opening Ja es B O Ne 11 II, CPPO D ector of Purchasing and Risk Management 2 M CITY OF FORT COLLINS BID PROPOSAL BID #5473 BID OPENING. FEBRUARY 24. 2000. 3.00 p.m (our clock) WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR MISCELLANEOUS CONCRETE PROJECT PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS The Contractor must provide all equipment, labor and materials deemed necessary to remove, haul, backfill, compact, install and patch concrete curb, gutter, sidewalk, pedestrian access ramps, concrete pavement, aprons, crosspans, trails, and inlets for various City departments Needed services during the contract period will be requested through issuance of work orders There is no guaranteed minimum amount of services to be ordered No work order exceeding $50,000 will be issued The City reserves the right to supply any or all materials This contract is a one year contract beginning May 1, 2000, with 4 optional years to renew and shall be administered by the Engineering Department, but may and will be utilized by other City Departments SCOPE OF WORK GENERAL A This bid will be for various tobsites, as required by City Departments and should not be construed as one site Each tobsite will be based on isolated locations which are separated by more than 1 city block Needed services during the contract period will be requested through issuance of work orders No work order exceeding $50,000 will be issued B The Contractor must provide all labor, materials and equipment, including traffic control and barricading to accomplish the work in accordance with City standard specifications Replacement of curb, gutter and sidewalk shall match existing, i e , vertical curb shall be replaced with vertical curb, etc , or as directed by Engineer or Protect Manager C Contractor must maintain a local telephone number, and must be able to be reached by telephone and facsimile transmissions during prescribed business hours (8 hours per each 24 hour working period - Monday through Friday) Contractor will respond to all City non -emergency telephone transmissions in a reasonable time (Generally meaning within 24 hours on the next working day) 2 COMPLIANCE STANDARDS 3 ail A Contractor must refer to City of Fort Collins Design and Construction Criteria, Standards and Specifications for Streets, Sidewalks, Alleys and Other Public Ways, July 1996, for this project These documents are available from the City Engineering Department B The Contractor must submit concrete mix designs for approval by the City Engineering Department prior to starting work The City may require the Contractor to use rapid set concrete C The Contractor must be licensed with the City of Fort Collins and shall comply with all applicable Federal, State and Local Laws and regulations for the duration of the contract D All a5phalt patching shall be performed in accordance with the current City specifications and by a contractor licensed with the City of Fort Collins SERVICE AGREEMENT AND INSURANCE A Contractor must enter into the attached services agreement and provide the required insurance (Exhibit "B") This agreement is effective for one year from the date on the service agreement At the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods Pricing changes shall be negotiated by and agreed to by both parties and may (unless approved in waiting) not exceed the Denver - Boulder CPI-U as published by the Colorado State Planning and Budget Office Written notice of renewal shall be provided to the Service Provider and mailed no later than ninety (90) days prior to contract end WORK ORDER PROCEDURE A All job estimates must be submitted on a unit price basis consistent with the prices established in the Bid Schedule section B Contractor will invoice for all jobs completed on a unit price basis with the prices established in the Bid Schedule section C Work order number must be included on the billing invoices D All jobs must begin within a ten (10) day period following issue of a work order Each work order shall be signed and returned to the issuing department within 48 hours If the low responsive, responsible bidder cannot meet this performance specification, the City has the right to offer the project to the next lowest responsive, responsible bidder according to prices listed from their submitted bid schedule Exceptions to this policy will be made for inclement weather preventing a timely response by the Contractor (a one -day extension for each day of bad weather will be given), or a previous understanding between the Contractor and the City's departmental representative allowing more flexibility with regard to the individual project It will be the Contractor's responsibility to make these arrangements with the City's representative PATCHING REQUIREMENT rd A All concrete placed adjacent to asphalt pavement will require placement of a hot mix asphalt patch, unless otherwise directed by the City Engineer's office The minimum length shall be one (1) foot longer than the concrete replacement Asphalt next to new crosspans and aprons shall be sawcut a minimum of 30 inches from the new concrete, and asphalt next to new curb and gutter shall be sawcut a minimum of 24 inches from the new concrete so that the patching crew can provide a clean, effective patch Patching limits shall be determined by the City Engineer, or his representative, and shall meet current City of Fort Collins patching standards for limits and depth The Contractor shall patch the asphalt before removing the barricades and within seven (7) days of the placement of the concrete curb and gutter If cold weather does not allow for a hot mix asphalt patch, the Contractor shall place a temporary asphalt patch and maintain the patch until a hot mix patch can be installed 6 INSPECTION A It shall be the Contractor's responsibility to notify the City Engineer, or their representative, that the work is ready for inspection Every request for inspection shall be made at least twenty-four 24) hours before inspection is desired Any work completed by the Contractor and not inspected and accepted by the City engineer's office shall be removed and replaced at the Contractor's expense 7 AWARD A Prices bid shall be based upon Project Specifications and shall be each Bidder's responsibility to familiarize themselves with the complexities involved for each type before entering a bid Payment will be processed by City Departments upon the presentation of invoicing B Award of this bid will be made in the best interest of the City Evaluations will be completed using the estimated quantities given, times the unit price 8 TRAFFIC CONTROL A All traffic control, work zone protection, .and/or parking control and permits shall be the responsibility of the Contractor, and provided in accordance with the latest revisions of the "Manual on Uniform l raffic Control Devices for Streets and Highways" (MUTCD), the City of Fort Collins "Work Area Traffic Control Handbook", and the attached revisions of Sections 104 and 614, Traffic and Parking Control and Traffic Control Devices respectively 5 41 Y1 SECTION 00330 BID SCHEDULE City of Fort Collins Miscellaneous Concrete Program , {pii,140 %, 0{ n4„ tNI I ' I , p , §i, 1'Ri, 'i I' '%,�;jl'Ij li��ti,11�I 'l, 111liµi DISC�RIP'TI;ONiI{iii�ljllUil'id;tF "i'i,r,pP , �lu "'M I,Y b3 "'^S'Y •' i�lp,�4bA, Ib,k ill t''145,iu„yw��,��.�J uo�i, ,Ii,p CIE �I,il bil I , t4xtry11� r� ik , n t III, '"r=, f�n,,,,�,�UIIIII ,NITiI'ilu ", 4,f �4 `" "` „bhk4q„ 5'n i(lio 4ry dt, I�IIIESTIMATED',p� {!{�tQUANTITrY¢ bl n,,,•i „ rtp,,,ii{i TOTAL1141#V, ^LL Ip hM Sf 11EAMOUNT, e 20201 Remove Concrete/Asphalt SF 8,000 20202 Remove and Haul Fillets EA 10 20203 Sawcut Concrete/Asphalt 0" - 4" LF 250 20204 Sawcut Concrete/Asphalt 4" - 6" LF 500 20205 Sawcut Concrete/Asphalt 6" - 8" LF 500 20206 Sawcut Concrete/Asphalt 8" - 10" LF 250 20301 Excavation CY 300 20302 Excavation - Walls Only CY 150 20303 Embankment (Borrow CL-5 or CL-6, Complete In Place) TON 100 21000 Reset Flagstone SF 250 21210 Sod SF 500 40301 1 emporary Patching TON 100 40302 Asphalt Patching - 6' Depth TON 150 40303 Asphalt Patching - 10" Depth TON 150 60401 Reconstruct Inlet Deck EA 5 60402 Inlet Deck - Additional Foot Opening LF 15 60403 Gurb Inlet - 4' Opening EA 10 60404 Area Inlet EA 5 60405 Type R Inlet - 5' Opening EA 5 60406 Type R Inlet - Additional Foot Opening LF 5 60407 Curb Inlet w/Frame and Grate w/ Adjustable Curb Box EA 5 60408 Concrete Sidewalk Culvert EA 10 60409 Metal Sidewalk Culvert - 2' Opening, s/e" Plate EA 5 60410 Metal Sidewalk Culvert - 2' Opening, Y" Plate EA 5 604 11 Additional Square Foot,'/s" Plate SF 5 604 12 Additional Square Foot, A" Plate SF 5 60801 Apron SF 1,000 60802 Crosspan SF 1,000 60803 Driveover Curb, Gutter & 4" Sidewalk LF 1 500 60804 Driveover Curb Gutter & 6" Sidewalk LF 1,500 60805 Driveover Curb and Gutter- No Sidewalk LF 200 60806 Driveover Curb, Gutter and Drive Approach LF 250 .,�.;g4TOTAL�F,A'GE;I a'1'41 yk,,°IN'lt*7" " n, ydatn a'ni.n,d. M„ 'ir f'1041 , V, 11. 9'i RS,411, i,l , M h,,,d{"'�„6�i'([i'IIIIu�b,Wl,,,b,g9 i t� AI,IP'lrfi, wQiP b�rtgi{,Ill's i41ld ib i„ `11i{i n,tEVmii nano A({t ni�'11id "Ihi{'��i��,tSy lliii{i1iq"i9'k M N R1 UL;ITE RIPTION�vI RC 4"'' H� h"l. It,9,iIEQSUTAIMNATTITE(Y Diij'p liiYI TIiil,,li? e n(MI;TiI ll�!tttfT,OTAL-�,C,I4"1qi ESTIMATED u9h1AMOUNT,+;da,n:0 60807 Drtveover Curb and Gutter Drive Approach No Sidewalk LF 100 60808 Vertical Curb, Gutter and 4" Sidewalk LF 500 60809 Vertical Curb, Gutter and 6" Sidewalk LF 100 60810 Vertical Curb and Gutter - No Sidewalk LF 1 200 60811 Vertical Curb, Gutter and Drive Approach LF 200 608 12 Vertical Curb, Gutter and Drive Approach No Sidewalk LF 100 608 13 12" Reinforced Vertical Curb LF 100 60814 Hollywood Curb Gutter and 4" Sidewalk LF 900 60815 Hollywood Curb, Gutter and 6" Sidewalk LF 300 60816 Hollywood Curb, Gutter and No Sidewalk LF 100 60817 Hollywood Curb, Gutter and Drive Approach LF 200 60818 Hollywood Curb and Gutter Drive Approach No Sidewalk LF 100 608 19 Highback Curb and Gutter LF 500 60820 Pedestrian Access Ramp Drtveover Curb LF 250 60821 Pedestrian Access Ramp, Vertical Curb LF 250 60822 Pedestrian Access Ramp, Hollywood Curb LF 250 60823 Pedestrian Access Ramp Highback Curb SF 500 60824 4" Flatwork SF 6,000 60825 6" Flatwork SF 2 500 60B 26 Replace Flatwork V Additional Depth SF 500 60827 8" Concrete Pavement SF 2,000 60828 Concrete Staining/Sealing SF 250 60829 Valley Pan - 6" Depth SF 500 60830 5" Trail with Fibermesh SF 6,000 60831 5' Trail with Fibermesh - Colored (Yosemite Brown) SF 1,000 60832 12" Mow Strip - 4" Depth LF 1,000 60833 18" Splashblock - 4" Depth LF 500 60834 8" Non -reinforced Concrete Wall SFF 1,000 608 35 16" Non -reinforced Footer - 8" Depth LF 300 70501 Backer Rod/Sealant LF 200 61401 "NO PARKING" Sign With Stand Per Day Per Each 500 61402 Vertical Panel Without Light Per Day Per Each 50 61403 Type I Barricade Without Light Per Day Per Each 1 000 61404 Type II Barricade Without Light Per Day Per Each 20 61405 Tvpe If Barricade Without Light Per Day Per Each 20 i.i #h,4i°*, n'gTOYAL�'PAGEi2 it ikn"v�, ,,,,"'h!b,h Pin l„l(n,{4 f,t' �u(nt; n,j,,r n'�`fl nni �., °I,i 'I("al�!ii�"!bt 'i4fl I1,, I i G 4 IIII ilbi �i�i�i ii (( „4d ,Mill", Ai�c-"!4" ,..,. '� ,Uleir "0,,,6�i;lilnm 9npma„ „4nia�nn��r � lhllu�('�;,iay..i ,t�a0uilo-i�8,�,,t',IDIo�q(�t([ll!am,,,,l1t'ait{l!!l�„4!;Ili��ihuni,;ili��(,lCj1, l'ili"9i 'ii I,�tyj'III Il i41`II II'J 7 Es ER ,r ITEM I;4 n},A1f't „'µi `,1,"I';(III,% DIESCR,IPTIONyr,'nr•r'iili0t,d,„"in',e,;'qupro,`9rgir iniPRICEb�'6 rart'jii`41(Ii �NlTgl+l''Inl��`� p "ingTOTAL"Pn1i(1v'ntr ilNOo r'¢i 4 1II1' � I;,'IJI�iII,�i la41r11,�i{i(a, (I jili, I,'i'44'�4idUII,4{ �,bLl Qlpain;, �(�,{ililiy(lyy 'i',IIIIIu�4Pp1, III,,q,,� II '!`i l�i�"ESTIMATED,'(((j1,,'ll{a; 111Ii, QUANTIy,rr' 111i�,1(tl`ESTIMATED'III,�1�, li (4r`i' t rlPy�l+1 l(O,ihn.�w,I�iShl7�,�i5(lib;'s 411�1�?�I i{It 7{llli ii ulu4' I, di }}, t 41n �4A y"qr ti t}u AMOUNT,t` tl,' 441i}i��ll,q .td n, dia, ninlmn, I, „ilm, '+La uP y, i, oni Yi ah ti u1i.:t n N u.n , 61406 Size A Sign With Stand Per Day Per Each 300 61407 Size B Sign With Stand Per Day Per Each 20 61408 Size A Specialty Sign - Cost of Manufacturing Each 2 61409 Size B Specalty Sign - Cost of Manufacturing Each 2 614 10 Cone With Reflective Strip Per Day Per Each 500 614 11 Safety Fence Per Day Per Roll 25 614 12 Light - Steady Burn Per Day Per Each 25 61413 Light - Flashing Per Day Per Each 400 614 14 Advance Warning Flashing - or Sequencing Arrow Per Und Per Day 5 Panel 614 15 Traffic Control Supervisor Per Day 100 614 16 Traffic Control Supervisor Per Hour 100 61417 Ragging Per Hour 200 ,1 l,(--TOTALPAGEI3' � (i '� ill ('IIII;p!"Ili (bh,Ilpl, '4 i9111I Ilrli4�,11'jI III„=I �l 'I} ,11( ,d;°,;.III"I q'';{r,I,l eNa Mill{l( ;', ;,I i,I (II III! f(i''�l t,i ll Ilbi .�, lui' ,�nll (' ' (III �11iii" lii 1111`�Iiu �( ;iI,1i l� li ly�o„��„4, i;� in' r tiIII1I'!`' In(, ll�' i,tnr it i{i( i�i it ti,a Ii IIIIIIii�,,,iiri, liti l2ii l III n� V� lily rilillliiln,e Ili i 141,t i'�il'IIII i+I + Ij,4 t y V it YI ii, .� 4i �n Nl i�,��,y�l,, Y.W If ,il y`w yY'4' { „TOTAL�PAGEi1'v"n4,r �,y`o- �4n'N'M »i, '.I'i,{' rt 'i i{rn,r,�tn'.+,*,+i,J u'�yl'x, wi; a�tigiRnt,'i ' `t"V' 'n i"bn 1',4' 4b'S4 11 1'uP 4 i Ir�iq tinMl" , t si i, , a tu? 1(„iinNP,tl �. iI+AYP�+FI Ii L, i¢1dv 9r`4lONAl, r�'iI 46„4h "di li, ,+ lien ,9i 'i .„.I' ItVn'I i llsl; R,;l;y "+,;d2`IRIII{II16i'i'64411111IIiIP",I,�9i PAGE 2 �q 4 il1 1 �,6 II(i�,� rq �I(, ,4lpt�(i p'n (u ';,r, (('tl+'It"ni 4(I„r�+;Y ll , t 1, �yil, 31 I ll,;s,S1 (I ,p ,jli4lll,IidTOTAL i, p ,p, r1 i y ri, ��, �� i �i �� ,�, ��„ ,'„ul„1I �, . Cf l I,i'n�,licu i, 91 0l, in,gi,dlnl �ai�„��,, �s n' 11mi,�dr ,» n i In. P'ill0pr iI n''; ,= i,'It14,1111 u il,' iYgr� 1!',. #` ' yry�flhrj,4N`Y i' i L'diYl�,�r, 'hUBi,l'i, w ,griN..... TOTAL�COST,`,',9"inn',' i6t„i" i tlnilr� Iii, `k'. !„....tNi 711(,�ih ,p�t4` M, n iru,� `Via ,•ylv l�ll,� r inllr 16dii� r, ,m,�,P rdlil,i piI ((A[ , tr6u„ ��II'rgi4�n, Dollars, and Cents (Com Check One Individual Doing Business in Company Name Corporation Partnership Phone/FAX REVISION OF SECTION 104 TRAFFIC AND PARKING CONTROL Section 104 of the Standard Spec i ications is hereby revised as follows Subsection 104 04 shall include the Following It shall be the Contractor's responsibility to clear parking tionm the sueets ti IlLIl such parking will intettere with the work Prior to work that requires the, strect(s) or portion thereof, to be closed to parking and/m traffic, the street(s) shall be posted for "NO PARKING" The placement of these signs shall lake place at least 24 hours prior to the commencement of work and shall clearly show the day, date and times that the message on the sign is in effect (For example, if a sheet is to be patched on Wednesday, July 2, the street shall be posted no later than Tuesday, July 1, by 7 00 a in with a sign that leads similar to "NO PARKING, WEDNESDAY, JULY 2, 7 00 A M TO 6 00 P M , PA PCIIING) "NO PARKING" signs shall remain in place until the street is opened to traffic and all clean up opetatrons completed All information on the "NO PARKING" signs, with the cxceptron of the date, shall be in block letters permanently affixed to the sign Any infotmahon added to a sign, such as dates shall be clearly legible and written in block style lettcts The "NO PARKING" signs shall be in effect for one or two days only, prior to construction Any work done by the Contractor without traffic control will not be paid for tinder the terms of this Contract file Contractor will not be paid for tratfic control costs incuued dining Contractor caused delays At of near the end of each wotk clay a I ept esentative of the Contractor, the Traffic Control Supcivism, and the City Reptesentattve will meet to drsenss the pwgiess of the wolf, and the placement of traffic control devices including "NO PARKING" signs Any necessary idjnslmenls shall be made The Conttactot shall also review at this time with the City Representative the proposed means of handling parking and traffic control for upcoming well, It is the responsibility of the Contractor to minimize any utconveinence to the public as a result of this wot k At the above teferenced meeting, the quantity of tmatlic control devices used that day shall be agreed upon by the Contractor and the City Representative "file Contractor shall utilize forms approved by the City for the tabulation of fialfic Control Devices utilized The Conhaclm shall maintain access at all lmmcs to all businesses within time project Any changes in the uatfic control, including additional signs, barricades, and/or tlaggems needed m the field shall be immediately implemented as directed by the City Pepresentalrve The cost for traffic control is coveted in "Revision of Section 614, Traffic Control Devices" found herein p