HomeMy WebLinkAboutWORK ORDER - RFP - 10336 MINOR CAPTIAL IMPROVEMENTS 9931519Stq q/l�wl EXHIBIT "A" 9-17 0l WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SEAR -BROWN, INC DATED August 8, 2001 Work Order Number Minor Capital Projects — Water/Wastewater Purchase Order Number 2001-13 �q 3 15 1R Project Title Albion Way Water Line-5OZ-OLILi00Z'5a`laGO Commencement Date August 8, 2001 Completion Date October 01, 2001 Maximum Fee ( time and reimbursable direct costs) Project Description (See attached Exhibit A) Scope of Services (See attached Exhibit A) Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control The attached forms consisting of Exhibits A and B, consisting of three (3) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given Cc Purchasing $ 4,863 (See attached Exhibit B) Professional By Donald F Date y k City of Fort Collins Submitted ByProject Manager Manager Date Ct' — % _ O Reviewed By W e� field Operations Manager Date _ ;7 _U Approved by 6 $ - W , Utilitft General Manager Date fit dt Approved by Director of Purchasing & Risk Management (if over $30,000 ) Date EXHIBIT A PROJECT NAME: Albion Way Water Line Replacement CITY OF FORT COLLINS WORK ORDER NO.: Minor Capital Projects — Water/Wastewater CITY OF FORT COLLINS PURCHASE ORDER NO.: 2001-13 SEAR -BROWN PROJECT NO.: 020-196 -71 PROJECT LOCATION: Albion Way from Elmhurst Drive to Manhattan Avenue PROJECT DESCRIPTION: Project involves the installation of a new six inch (6") PVC water line Albion Way and abandonment of the existing six inch (6") main between Elmhurst Drive and Manhattan Avenue Existing water service Imes will be removed from the existing main and tied to the new water line in Albion Way The existing fire hydrant service line will be removed from the existing main and tied to the new water line in Albion Way City crews anticipate construction of these improvements in September 2001 CITY OF FORT COLLINS PROJECT MANAGER(S): Tim McTague SEAR -BROWN PROJECT MANAGER: Don Silar SCOPE OF SERVICES: A City of Fort Collins to supply site information as follows. 1 Horizontal locations of curb, gutter, sidewalk, property and right-of-way lines and location of surface features Horizontal and vertical locations of all utilities within the project site Horizontal and vertical location of asphalt and gravel pavement surfaces Horizontal location of all valves, service lines, curb stops and meter pits Data files in AutoCad format containing the above information Conduct site visit with Sear -Brown staff to review scope of the project B Sear -Brown to supply the following services 1 Conduct site visit with Utilities staff to review proposed scope of the project 2 Horizontal and vertical locations of curb, gutter, sidewalk and access ramps Horizontal location of all utilities within the project site M VOBS\020-196\does\Construction Adtnmtstration\Proiect Sheet\MINOR CAP PROJECT SHEET Albion Way water line 8-01 doe Donald F Stlar Page 1 of 2 09/05/01 c �.Kt r 4 Approximate horizontal location of all valves, service lines, curb stops and meter pits 5 Set a vertical control point. 6 Prepare drawings/plans as follows a Plan & profile, and detail sheets in a 24" by 36" format b Sheet(s) will contain plan and profiles views of the distribution line and detail the areas of abandonment c Plan view(s) will contain location of existing site features, utilities, control points, and the location of proposed improvements d Profile view(s) will contain the approximate vertical location of utilities where crossing the water line e A detail sheet will be prepared to show details of the following. 1) Valves 2) Service connections. 3) Bedding zone and trench detail 4) Fire hydrant 7 Review alignment and abandonment approaches with City staff 8 Prepare Drawings of Record (as-builts) based on information supplied by City's water utility crew PRODUCT: A. Reproducible copy of one (1) plan & profile sheet B Reproducible copy of one (1) detail sheet ESTIMATED PROJECT FEE: $ 4,863 ESTIMATED PROJECT COMMENCEMENT DATE: 08/08/01 ESTIMATED PROJECT COMPLETION DATE: 10/01/01 M \JOBS\020-19Mdocs\Construction Adinimstration\ProJect Sheet\MINOR CAP PROJECT SHEET Albion Way waterline 8-01 doe Donald F Silar Page 2 of 2 09/05/01 EXHIBIT B City of Fort Collins - Albion WayWater Line SEAR •BROWN y:-a''-` ,_�� -��re- :wiLabor Cateaorv'SBG lndmdual/Subconsultent'RateMour k--„i - 3-''ga5.5 =. 4~-'�1'-u'. r..� -=V' - '',s,—'-= Crcalt- --- TOTAL` Engr I-^� Engr IP"FConirol CAOD=- lenpl "Serve ,.Manager>� raes"� - ASK TOTAL _7�>- ___ — _-.: -a..S=,f'=_-_�_=x.,....,.�__." - 'tr-='i_�:r.F`"-es•;;y':',"-.-= .``� .e>-`1cs'-:5_�.;T. "!'x"x. J �:�-_c'E--xs`�y _-- 'rta �_:� /v -'-.��Ni _4`i�'---_yai'^- �>_- -_43.. ".��.d�'-a': aE�. b; z-.a _ >,�^_'"c-- c.cs'--•."L'= - - ---+ra,,«.._ _'_-��'��f =:-. _ i.,._ sr=sv_ �"q'i,._�.`2�- �{'�:a_ _;- ", 04110. � _.:110a� 90cY�-"h"Y_J 85`.�- 9. .710*ar�sy_agp=__ -„".-i .F-� - -_ .;•7''85"�-'�"" _;#�.:;��'"�e�=' 3+; �r 1 conduct Sae Visas 1 1 '``4- �`ysSzs _ '•sc`�`''-'- sue'..-' '-`=_.- '" __ _ n".-.-•• __� '1 - - -'c_4"�'�' 1 - ''E=+ '� $175 2 Horizontal and vertical locations of curb, gutter, sidewalk and access ramps 1 1 $235 - ' 's "+ems"�, Y;;xr *A'F t�`' 91-•"iSf1�?"' 't-�' - ` �` - a'dirv� C {' S�.�._..s,»z" ..- v ' ...' Y ^� :..-.E' .. •,a'}'.i x °'°i. ,..- • $235 3 Horizontal location of all utildies 1 2 2 R _"-=ti�^i-.��-S a�u.. s' <-n2. _ •..s -i` d - i _ `t ¢'-, _"^"-^ _ -r" ''-5�` $360 4 Approximate horizontal location of ell valves, eemce hoes, curb stops antl meter prta 1 2 2 ~ a$125 5 z Set vertical comrol point 1 1 y —' 6 Preps rerawinpa/Plana (2)6 2 1 $100 $998 6b I IPrepare sheet lay out 21 $130 WIWI,b 6c I !Prepare plan view 1 4 6 $620 6E 1 6 e IPre are profile "OW(1) Prep aare�detail sheet (i) 1_ 21 2 fi 4 $490 $370 .- -" `;g.- =ax^'`,1 .':t 4�s 4--x-•,m ` .$= R' �yg��" MAR g, - ....-•.'�L{,�� - _ .5-_'"""' _,z'.2 _. - s $2,608 x 7 Review design with field staff 2 $165 - - -.•_- _ ±-..�i.�..:..z.. -' t+?- Via='=- raT,a4..",, r=+ty__ T"_" `-Sv-"-,'-3Al M � 8 Prepare gsDrawings of Record 3 8 JY $25 -e-"'-`-z5"Fzmt-=-`-�i.;-�sh�F? gxA''A,•zyY-tw->' s. �YF." �.,_�. �n '' u..� ��. H>'— - "��.•s-. ,x:?e.�r' �' _ $835 TOTAL PROJECT FEE level of effort per labor category 15 0 17 2 30 1 0 64 total costs per labor category sub -consult &expenses $ 1,595 $ $ 1105 $ 220 $ 1800 $ 18 $ $125 $ 4,863 "Index" A =Travel, B = Reproduction, C = Plots 0 = Mylars, E = Sub-cwnsultards/Other F = Combinabon TOTAL COST F2,$4,863 YSN1 /12 dfi PM/Coif AEm WSY WL