WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
SEAR -BROWN, INC
DATED August 8, 2001
Work Order Number Minor Capital Projects — Water/Wastewater
Purchase Order Number 2001-13 �q 3 15 1R
Project Title Albion Way Water Line-5OZ-OLILi00Z'5a`laGO
Commencement Date August 8, 2001
Completion Date October 01, 2001
Maximum Fee ( time and reimbursable direct costs)
Project Description (See attached Exhibit A)
Scope of Services (See attached Exhibit A)
Professional agrees to perform the services identified
above and on the attached forms in accordance with
the terms and conditions contained herein and in the
Professional Services Agreement between the parties
In the event of a conflict between or ambiguity in the
terms of the Professional Services Agreement and
this work order (including the attached forms) the
Professional Services Agreement shall control
The attached forms consisting of Exhibits A and B,
consisting of three (3) pages are hereby accepted and
incorporated herein, by this reference, and Notice to
Proceed is hereby given
Cc Purchasing
$ 4,863 (See attached Exhibit B)
Professional
By Donald F
Date y k
City of Fort Collins
Submitted ByProject Manager Manager
Date Ct' — % _ O
Reviewed By
W e� field Operations Manager
Date _ ;7 _U
Approved by 6 $ - W ,
Utilitft General Manager
Date fit dt
Approved by
Director of Purchasing & Risk Management (if over $30,000 )
Date
EXHIBIT A
PROJECT NAME: Albion Way Water Line Replacement
CITY OF FORT COLLINS WORK ORDER NO.: Minor Capital Projects —
Water/Wastewater
CITY OF FORT COLLINS PURCHASE ORDER NO.: 2001-13
SEAR -BROWN PROJECT NO.: 020-196 -71
PROJECT LOCATION: Albion Way from Elmhurst Drive to Manhattan Avenue
PROJECT DESCRIPTION:
Project involves the installation of a new six inch (6") PVC water line Albion Way and
abandonment of the existing six inch (6") main between Elmhurst Drive and Manhattan
Avenue Existing water service Imes will be removed from the existing main and tied to
the new water line in Albion Way The existing fire hydrant service line will be removed
from the existing main and tied to the new water line in Albion Way
City crews anticipate construction of these improvements in September 2001
CITY OF FORT COLLINS PROJECT MANAGER(S): Tim McTague
SEAR -BROWN PROJECT MANAGER: Don Silar
SCOPE OF SERVICES:
A City of Fort Collins to supply site information as follows.
1 Horizontal locations of curb, gutter, sidewalk, property and right-of-way
lines and location of surface features
Horizontal and vertical locations of all utilities within the project site
Horizontal and vertical location of asphalt and gravel pavement surfaces
Horizontal location of all valves, service lines, curb stops and meter pits
Data files in AutoCad format containing the above information
Conduct site visit with Sear -Brown staff to review scope of the project
B Sear -Brown to supply the following services
1 Conduct site visit with Utilities staff to review proposed scope of the
project
2 Horizontal and vertical locations of curb, gutter, sidewalk and access
ramps
Horizontal location of all utilities within the project site
M VOBS\020-196\does\Construction Adtnmtstration\Proiect Sheet\MINOR CAP PROJECT SHEET Albion Way
water line 8-01 doe
Donald F Stlar Page 1 of 2 09/05/01
c �.Kt r
4 Approximate horizontal location of all valves, service lines, curb stops and
meter pits
5 Set a vertical control point.
6 Prepare drawings/plans as follows
a Plan & profile, and detail sheets in a 24" by 36" format
b Sheet(s) will contain plan and profiles views of the distribution
line and detail the areas of abandonment
c Plan view(s) will contain location of existing site features,
utilities, control points, and the location of proposed
improvements
d Profile view(s) will contain the approximate vertical location of
utilities where crossing the water line
e A detail sheet will be prepared to show details of the following.
1) Valves
2) Service connections.
3) Bedding zone and trench detail
4) Fire hydrant
7 Review alignment and abandonment approaches with City staff
8 Prepare Drawings of Record (as-builts) based on information supplied by
City's water utility crew
PRODUCT:
A. Reproducible copy of one (1) plan & profile sheet
B Reproducible copy of one (1) detail sheet
ESTIMATED PROJECT FEE: $ 4,863
ESTIMATED PROJECT COMMENCEMENT DATE: 08/08/01
ESTIMATED PROJECT COMPLETION DATE: 10/01/01
M \JOBS\020-19Mdocs\Construction Adinimstration\ProJect Sheet\MINOR CAP PROJECT SHEET Albion Way
waterline 8-01 doe
Donald F Silar Page 2 of 2 09/05/01
EXHIBIT B
City of Fort Collins - Albion WayWater Line
SEAR •BROWN y:-a''-` ,_�� -��re- :wiLabor Cateaorv'SBG lndmdual/Subconsultent'RateMour k--„i
- 3-''ga5.5 =.
4~-'�1'-u'. r..�
-=V' -
'',s,—'-=
Crcalt- --- TOTAL`
Engr I-^� Engr IP"FConirol CAOD=- lenpl "Serve
,.Manager>� raes"� - ASK TOTAL
_7�>- ___ — _-.: -a..S=,f'=_-_�_=x.,....,.�__." - 'tr-='i_�:r.F`"-es•;;y':',"-.-= .``� .e>-`1cs'-:5_�.;T. "!'x"x. J �:�-_c'E--xs`�y _-- 'rta �_:�
/v -'-.��Ni _4`i�'---_yai'^- �>_-
-_43.. ".��.d�'-a': aE�. b; z-.a
_ >,�^_'"c-- c.cs'--•."L'= - - ---+ra,,«.._ _'_-��'��f =:-. _ i.,._
sr=sv_ �"q'i,._�.`2�- �{'�:a_ _;-
", 04110.
�
_.:110a� 90cY�-"h"Y_J 85`.�- 9. .710*ar�sy_agp=__
-„".-i .F-�
- -_ .;•7''85"�-'�"" _;#�.:;��'"�e�=' 3+; �r
1 conduct Sae Visas 1 1
'``4- �`ysSzs
_ '•sc`�`''-'-
sue'..-' '-`=_.- '" __ _
n".-.-••
__�
'1
- -
-'c_4"�'�'
1 -
''E=+ '� $175
2 Horizontal and vertical locations of curb, gutter, sidewalk and access ramps 1 1
$235
- ' 's "+ems"�, Y;;xr *A'F t�`' 91-•"iSf1�?"'
't-�'
-
`
�`
- a'dirv� C {' S�.�._..s,»z" ..- v ' ...' Y ^� :..-.E'
.. •,a'}'.i
x °'°i. ,..-
• $235
3 Horizontal location of all utildies 1 2
2
R _"-=ti�^i-.��-S a�u.. s' <-n2. _ •..s -i` d -
i
_
`t
¢'-, _"^"-^
_
-r" ''-5�` $360
4 Approximate horizontal location of ell valves, eemce hoes, curb stops antl meter prta 1 2
2
~ a$125
5 z Set vertical comrol point 1
1
y
—'
6 Preps rerawinpa/Plana (2)6
2
1
$100
$998
6b I
IPrepare sheet lay out
21
$130
WIWI,b
6c I
!Prepare plan view 1
4
6
$620
6E 1
6 e
IPre are profile "OW(1)
Prep aare�detail sheet (i)
1_ 21
2
fi
4
$490
$370 .- -"
`;g.-
=ax^'`,1 .':t 4�s 4--x-•,m ` .$= R' �yg��"
MAR g, -
....-•.'�L{,��
-
_
.5-_'"""' _,z'.2
_.
- s $2,608
x
7
Review design with field staff 2
$165
-
- -.•_- _ ±-..�i.�..:..z.. -' t+?- Via='=- raT,a4..",, r=+ty__ T"_" `-Sv-"-,'-3Al
M
�
8
Prepare gsDrawings of Record 3
8
JY
$25
-e-"'-`-z5"Fzmt-=-`-�i.;-�sh�F?
gxA''A,•zyY-tw->' s. �YF."
�.,_�. �n '' u..�
��.
H>'— -
"��.•s-. ,x:?e.�r' �'
_
$835
TOTAL PROJECT FEE
level of effort per labor category 15 0 17 2 30 1 0 64
total costs per labor category sub -consult &expenses $ 1,595 $ $ 1105 $ 220 $ 1800 $ 18 $ $125 $ 4,863