HomeMy WebLinkAboutRESPONSE - BID - 5539 DOWNTOWN STREETSCAPINGSECTION 00300
BID FORM
PROJECT: Downtown Streetscape - Phase I, Bid No. 5539
Place -Fort Collins Purchasing
Date September 8, 2000
1. In compliance with your Invitation to Bid dated August 17, 2000
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a **(Corporation, fzinited---Ibxfzty
Cpmga�r- P���aeelxir-Z3o-i�rE-8e��rxe-br ** authorized to do
business in the State of Colorado hereby proposes to furnish and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made !in
pursuance of and subject to all the terms and condi.tions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, alliof
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashiers check or standard Bid bond
in the sum of 5% of bid amount ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows. EMC Insurance Companies, P.O. Box 712, Des Moines, Iowa 50303
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of
the items listed in the Bid Schedule, irrespective of whether it is named
in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
I
7/96 Section 00300 Page 1
E'
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and fourteen years experience in the construction field He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity
During the past ten years, as the chief estimator with G L Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars
As estimator, hey directs project bidding process as well as the review of specifications He
is also involved with project management, coordinating proposal requests and change
orders with the architect or owner, overseeing material orders to insure that the project is
completed in a timely manner and according to specifications
William L. Vance, Project Superintendent
Bill brings over twenty three years of experience in construction related fields to his position
as project superintendent His background includes heavy equipment operating, truss
construction, carpentry, and cost estimating He also has experience in both commercial
and residential property development from site work and utility lines through finish
carpentry Bill has built over five hundred new homes as well as several light commercial
properties His commanding knowledge of construction methods enables Bill to be an
especially effective project superintendent
"
17
G.L. Hoff Company
Completed Concrete Projects
Equalizer Dam Project
Construction of new structural concrete dam outlet structure at the
Equalizer Reservoir Work included removal of existing structure,
excavation, concrete foundation and walls, gate system and sitework
Owner Greeley & Loveland Irrigation Company
Ron Brinkman, (970) 352-0495
808 23rd Avenue, Greeley, CO 80631
Contact Boyle Engineering, Lee Queen (303)987-3443
165 South Union Blvd , Suite 200
Lakewood, CO 80228
Contract $308,752 00
Completion 2-99
Ridgeview Park Construction
Construction of a new city park for the Fort Collins including demolition,
layout, earthwork and drainage, utilities rough -in, irrigation, site paving and
surfacing, fine grading and seeding, playground, picnic shelter and
furnishings, lighting, and landscaping
Owner City of Fort Collins
1 256 West Mountain Avenue
Contact
Contract
Completion
Fossil Creek West
Fort Collins, CO 80521
Craig Foreman, 221-6366
Parks and Recreation Department
$200,900 00
3-99
Construction of a concrete bike and pedestrian trail section west of Taft Hill
Road for the City of Fort Collins trail system Scope of work included
snework, grading, concrete, bridge installation, fencing, and seeding
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Craig Foreman, 221,6366
Park Planning and Development
Contract $168,64200
Completion 11-99
UI
"I
Nielson Greenway
Construction of a concrete and crusher fines pedestrian trail for the Town of
Berthoud Scope of work included extensive site grading, sod preparation,
concrete sidewalk and curb ramp and stone trail
Owner Town of Berthoud
P O Box 1229
Berthoud, CO 80513
Contact
Marty Lafontaine, 532-2643
Parks Department
Contract
$123,548 60
Completion
II-99
L&M Parking Lot
Construction of the L & M Parking Lot at the University of Norther n
Colorado The scope of work includes srtework, grading, concrete curb,
gutter, walk, and drive pans, asphalt paving, and lighting
Owner University of Northern Colorado
Carter Hall 1002
Greeley, CO 80639
Contact Scott McLean, (970) 3 51-1982
University of Northern Colorado
Contract $223,377 00
Completion 12-99
Cathy Fromme Prairie Parking Area
Construction of a parking area at Taft Hill Road and Harmony in Fort
Collins Project includes demolition of existing roadway, concrete curb &
gutter and asphalt paving
Owner
City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact
Craig Foreman, 221-6618
Parks and Recreation Department
Contract
$101,412 00
Completion
11-99
i
Fossil Creek Trail West of Taft Hill
Construction of a section of the Fort Collins bike trail system Work
includes sitework, concrete sidewalk and bridge abutments, pedestrian
bridge and seeding
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Craig Foreman, 221-6618
Parks and Recreation Department
Contract $156,247 00
Completion 10-99
Fromme Prairie Raptor Observatory
Construction of cast in place observatory budding including curved walls and roof
structures Scope of work included excavation drainage and seeding
Owner
Contact
Contract
Completion
Overland Trail Box Culvert
City of Fort Collins
256 West Mountain Avenue, Ft Collins, CO 80521
Janet Meisel, 221-6367
$69,000 00
1-99
Construction of a cast in place box culvert extension to the existing box
culvert located at the Pleasant Valley Canal and Overland Trail in Fort Collins
Owner City of Fort Collins
256 West Mountain Avenue, Fort Collins, CO 80521
Contact Gary Martinson, 221-6605
Contract $43,022 00
Completion 4-98
Longmont Greenway Phases IV and V
Construction of 3500 lineal feet of bike trail and greenway park along the rive]
Scope of work includes earthwork, rip -rap, underpass construction below two
streets, concrete walkway, crusher fines paths, pedestrian bridge, lighting,
landscaping and irrigation
Owner
City of Longmont
1100 South Sherman Street
Longmont, CO 80501
Contact
Paula Fitzgerald, (303) 651-8448
Parks and Recreation Department
Contract
$426,100 00
Completion
1 1-97
IDIXE
Kroh Park Multi -Purpose Athletic Complex
Construction of a new 33 acre park complex for the City of Loveland
Project includes sitework, utility lines, restroom, concession, maintenance,
and pump station buildings, parking areas, soccer and softball fields,
playground equipment, landscaping, dam construction with inlet piping and concrete
outlet structures and an irrigation pump system
Owner City of Loveland
500 East 3rd Street, Loveland, CO 80537
Contact
Contract
Completion
North College Trail Underpass
Jerry Adamson, (303) 757-1844
Parks & Recreation Department
$1,387,405 00
12-96
Construction of a concrete pedestrian, bike trail system for the City of Fort
Collins including the Highway 287 underpass
Owner
City of Fort Collins
Purchasing Division
256 West Mountain Avenue, Fort Collins, CO 80521
Contact
Craig Foreman, (970) 221-6366
Parks & Recreation Dept
Contract
$233,762 00
Completion
9-95
Modifications to the Carter Lake Outlet Works and St.Vram Supply Canal
G L Hoff worked as a subcontractor on this modification project to the Cartei Lake
Outlet Works Our scope of work included Demolition of the existing outlet,
shoring and forming, concrete placement, winter protection, electrical service
trench, demolition of existing stilling basin and construction of new basin, and
placement and compaction of fill material G L Hoff also provided detailed layouts,
daily reports, and complete safety plans
Owner Northern Colorado Water Conservancy Dist
Contractor Gracon Corporation
P O Box 869, Loveland, CO 80539
Contact Al Havens, (970)667-2203
Subcontract $169,799 00
Completed February 1995
r
Loveland Recreation Trail Underpass Project
Construction of three concrete underpass bikeways along the Big Thompson River
at Railroad Avenue, First Street and Taft Avenue in Loveland The scope of woi k
included clearing, excavation, dewatering, structural excavation and backfill, ripe ar,
concrete steel reinforcement, precast channel dram placement and concrete paving
at each site
Owner City of Loveland, Parks and Recreation Dept
500 East 3rd Street, Loveland, CO 80537
Contact Jerry Adamson, (303) 757-1944
Contract $135,437 00
Completed July 1992
Bridge Abutments
Construction of Bridge Abutments along the Big Thompson River for the City of
Loveland The scope of work included demolition of existing concrete crossing,
structural excavation and backfill, concrete abutments, sidewalks and a ditch
operation platform
Owner City of Loveland, Parks and Recreation Dept
500 East 3rd Street, Loveland, CO 80537
Contact Jerry Adamson, (303) 757-1844
Contracts Segment3 Project $23,957 00
Viestenz Smith Bridge Project $40,239 00
North Water Treatment Plant Sludge Basin
Construction of a sludge basin for the City of Longmont Work includes the
excavation, waste disposal, concrete foundation and walls, asphalt pavement, site
grading, and piping for a 88' x 160' basin
Owner
City of Longmont
1100 South Sherman Street
Longmont, CO 80501
Contact
Don Osborn, (303) 651-8379
Contract
$95,911 00
Completion
12-98
IJ
G.L. Hoff Company
2000 Completed Projects
Arkins Pump Station
Construction of coast in place buried pump budding including intei for
piping, pump equipment, installation of manual hoist and sectionalizing
valve, earthwork, and reclamation of construction site
Owner Little Thompson Water District
Mike Cook PE, (970) 532-2096
835 East Highway 56
Berthoud, CO 80513
Contact The Engineering Company
Warren Mesloh, (970) 484-7477
Contract $86,538 00
Completion February, 2000
Centennial Village Pump Station
Construction of non -potable water pump station including well drilling,
pump system, budding construction, electrical, and landscaping
Owner City of Greeley
Phil Carter, (970) 350-9826
1000 10th Street
Greeley, CO 80631
Contact Amy Johnson, Aqua Engineering, (970)229-9668
Contract $119,51100
Completion February, 2000
0
M
G.L. Hoff Company
1999 Completed ]Projects
Equalizer Dam Project
Construction of new structural concrete dam outlet structure at the
Equalizer Reservoir Work included removal of existing structure,
excavation, concrete foundation and walls, gate system, and sitework
Owner Greeley & Loveland Irrigation Company
Ron Brinkman, (970) 352-0495
808 23rd Avenue, Greeley, CO 80631
Contact Boyle Engineering, Lee Queen (303)987-3443
165 South Union Blvd, Suite 200
Lakewood, CO 80228
Contract $308,752 00
Completion 2-99
Ridgeview Park Construction
Construction of a new city park for the Fort Collins including demolition,
layout, earthwork and drainage, utilities rough -in, irrigation, site paving and
surfacing, fine grading and seeding, playground, picnic shelter and
furnishings, lighting, and landscaping
Owner City of Fort Collins
256 West Mountain Avenue
Contact
Contract
Completion
Mosier Hill Non -Potable System
Fort Collins, CO 80521
Craig Foreman, 221-6366
Parks and Recreation Department
$200,900 00
3-99
Construction of a non -potable water irrigation system including precast
concrete budding, aeration system, pump system intake, irrigation pond
lining, cast in place concrete, irrigation pump system, and electrical
Owner
City of Greeley
1300 A Street
Greeley, CO 80631
Contact
Phil Carter, (970)350-9826
City of Greeley
Contract
$193,963 00
Completion
3-99
Fossil Creek West
Construction of a concrete bike and pedestrian trail section west of Taft Hill
Road for the City of Fort Collins trail system Scope of work included
sitework, grading, concrete, bridge installation, fencing, and seeding
Owner
Contact
Contract
Completion
Nielson Greenway
City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Craig Foreman, 221,6366
Park Planning and Development
$168,642 00
11-99
Construction of a concrete and crusher fines pedestrian trail for the Town of
Berthoud Scope of work included extensive site grading, storm sewer, soil
preparation, concrete sidewalk and curb ramp and stone trail
Owner
Town of Berthoud
P O Box 1229
Berthoud, CO 80513
Contact
Marty Lafontaine, 532-2643
Parks Department
Contract
$123,548 60
Completion
11-99
L&M Parking Lot
Construction of the L & M Parking Lot at the University of Northern
Colorado The scope of work includes sitework, grading, concrete curb,
gutter, walk, and drive pans, asphalt paving, and lighting
Owner
University of Northern Colorado
Carter Hall 1002
Greeley, CO 80639
Contact
Scott McLean, (970) 351-1982
University of Northern Colorado
Contract
$223,377 00
Completion
12-99
Cathy Fromme Prairie Parking Area
Construction of a parking area at Taft Hill Road and Harmony in Fort
Collins Project includes demolition of existing roadway, concrete curb &
gutter and asphalt paving
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Craig Foreman, 221-6618
Parks and Recreation Department
Contract $101,41200
Completion I1-99
Fossil Creek Trail West of Taft Hill
Construction of a section of the Fort Collins bike trail system Work
includes srtework, concrete sidewalk and bridge abutments, pedestrian
bridge and seeding
Owner
City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact
Craig Foreman, 221-6618
Parks and Recreation Department
Contract
$156,247
Completion
10-99
Loveland Office Max
Construction of all concrete work for the new Office Max facility Work
includes excavation for foundation, and srtework, concrete budding
foundation, floors and all site concrete such as curb and gutter, sidewalks,
dock and pads
Owner TCC-BTS Loveland OM, Inc
7535 E Hampden Avenue, Suite 650
Denver, CO 80231
Contact Tap Pritchard, (303) 843-1947
Contract $191,845 00
Completion 10-99
Bid Schedules sub3ect to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. _,
through
G.L. Hoff Company
CONTRA T R
BY
Gregor L. Hoff
President
ADDRESS 1815 West 12th Street
Loveland, CO 80537
(970) 669-3255 FAX (970) 663-1566
8 BID SCHEDULE (Base Bid)
Downtown Streets -coping - Phase I
£1/17/00
Olive and College (4 corners) and Mountain and College (NE corner only)
Bid Schedules
Spec/Item
Description
Total
Unit
Unit Price
Item Total
Number
Est quantity
212
Tree Protection
17
EA
62.00
A 1 , 054'. 00
202
Remove Highback Curb 8 Gutter, 4" Concrete
Sidewalk, Concrete Pavement, Asphalt Pavement,
Brick Pavers
11700
SF
1 . 3
15 , 210.00
210
Remove, store and reset signs
1
EA
108.00
108.00
--and
210
Remove of aggregate wall
60
lF
21.75
1,305.00
210
Remove, store; and reset fencing
994
LF
17.80
3, 453. 20
210
Remove, store, and reset mail boxes
2
EA
375.00
A 750.00
210
Remove, store; and reset tree grates and frames
16
EA
208.00
3, 328.00
210
Adjust Manhole
1
EA
200.00
$ 200.00
210
Adjust Valve Box
4
EA
200.00
800. )0
210
Bicycle Rack (Remove and Reset)
9
EA
175.00
1 575. 00
7/96
Section 00300 Page 2
I
G.L. Hoff Company
1998 Completed Projects
Cathy Vromme Prairie Parking Lot
Construction of new parking lot including earthwork, asphalt paving, paving
blocks, seeding, and fencing
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Craig Foreman, 221-6366
Parks and Recreation Department
Contract $78,43100
Completion 3-98
Loveland Rental Center
Construction of new rental center facility including sitework, concrete
paving and flatwork, masonry buildings and finishes
Owner Bill and Debbie Mortellaro
1023 South Lincoln Avenue
Loveland, CO 80537
Contact Bill Mortellaro, 669-6060
Contract $495,705 00
Completion 4-98
Ivy and Rockwell Street Bridges
Bridge repairs including
sitework, grouting, and new concrete and masonry
railings
Owner
Town of Estes Park
170 MacGregor Avenue
Estes Park, CO 80517
Contact
Greg Sievers, 586-5331
Town of Estes Park
Contract
$173,574 00
Completion
4-98
Fossil Creek Trail
Construction of concrete bike and pedestrian trail section east of Taft Hill
Road for City of Fort Collins trail system
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Craig Foreman, 221-6366
Parks & Recreation Department
Contract $111,569 00
Completion 3-98
Golden Ponds Fishing Pier
Construction of a handicap accessible fishing pier with caisson foundation,
concrete and steel pier structure, wood decking, shoreline grading, i iprap
and concrete walk construction
Owner City of Longmont
1100 South Sherman Street
Longmont, CO 80501
Contact Paula Fitzgerald, (303) 651-8448
Contract $38,046 00
Completion 4-98
LDS Church Remodel
Restroom remodel for the Church of Jesus Christ of Latter Day Saints for
ADA requirements including electrical modification and interior finishes
Owner LDS Church
1400 Lynwood
Fort Collins, CO 80521
Contact Douglas Coates, (307)635-4922
Douglas Coates, Architect
Contract $70,539 00
Completion 4-98
C
Overland Trail Box Culvert
Construction of a cast in place box culvert extension to the existing box
culvert located at the Pleasant Valley canal and Overland Trail in Fort
Collins
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Gary Martinson, 221-6605
Contract $43,022 00
Completion 4-98
Fromme Prairie Observatory Structure
Construction of a reinforced concrete structure along the Fossil Creek Bike
Trail to provide a raptor observation budding
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Janet Meisel, 221-6367
Contract $68,22100
Completion 8-98
Home State Bank
Remodel of existing bank facility including interior remodeling and finishes
and exterior sitework and facade renovation
Owner Home State Bank
935 North Cleveland Avenue
Loveland, CO 80537
Contact Mark Bower, (970)203-6125
Home State Bank
Contract $156,000 00
Completion 8-98
1998 Concrete Street Maintenance
Remove and replace sections of concrete pavement to repair various areas
on Mountain Avenue for the City of Fort Collins
Owner City of Fort Collins
256 West Mountain Avenue
Fort Collins, CO 80521
Contact Enka Rasmussen,221-6605
Contract $97,126 00
Completion 5-99
Is
E
North Water Treatment Plant Sludge Basin
Construction of an 88' x 160' reinforced concrete sludge basin at the City of
Longmont North Water Treatment Plant including subgrade preparation,
reinforced concrete push walls, asphalt pavement and dram line
Contact
UNC Non -Potable Irrigation Supply
Construction of a non -potable irrigation supply for the University of
Northern Colorado including earthwork, irrigation system, landscaping,
pond and pump station, concrete walls and walkways, and PVD mhne diains
Owner University of Northern Colorado
Carter Hall, Greeley, CO 80639
Greeley, CO 80639
Contact Scott McLean, (970) 351-1982
UNC Facilities Services
Contract $260,62100
Completion 11-98
SECTION 00410
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned G. L. Hoff Company
as Principal, and _ Employers Mutual Casualty Company as
Surety, are hereby held and firmly bound unto the City of Fort Collins. Colorado.
as OWNER. in the sum of $ 5% of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction
of Fort Collins Project, Downtown Streetscape - Phase I; Bid No. 5539_
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid, and said Surety
does hereby waive notice of any such extension
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER
7/96 Section 00410 Page 1
S
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 8th day of Se tember 20 00 and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Name: G. L. Hoff Company
Address• 1815 W. 12th St.
Loveland, CO 80537
Title -
ATTEST: —7—
By
(SEAL)
SURETY
Employers Mutual Casualty Company
P.O. Box 441098, Aurora, CO 80044
By: loll Q2�Gc P Gd �
Title• Attorney -in -Fact
(SEAL)
7/96 Section 00410 Page 2
EdiC Insurance Companies N o. 4 Q 9 8 2 9
P O Box 712 a Des Moines, Iowa 50303
CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT
KNOW ALL MEN BY THESE PRESENTS, that
1 Employers Mutual Casualty Company, an Iowa Corporation
2 EMCASCO Insurance Company, an Iowa Corporation
3 Union Insurance Company of Providence, an Iowa Corporation
4 Illinois EMCASCO Insurance Company, an Illinois Corporation
5 Dakota Fire Insurance Company, a North Dakota Corporation
6 EMC Property & Casualty Company, an Iowa Corporation
7 The Hamilton Mutual Insurance Company, an Ohib Corporation
hereinafter referred to severally as "Company' and collectively as "Companies", each does, by these presents, make, constitute and appoint
CHRIS RICHMOND, RUSSELLMICHELS, DARLENE KRINGS, INDIVIDUALLY, FORT COLLINS, COLORADO
its true and lawful attorney-m-fact, with full power and authority conferred to sign, seal and execute its lawful bonds, undertakings, and other obligatory Instruments of a
similar nature as follows
JN AN AMOUNT NOT EXCEEDING TEN MILLION DOLLARS Si 0,000,000 00)
and to bind each Company thereby as fully and to the same extent as if such Instruments were signed by the duly authorized officers of each such Company, and all of
the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed
The authority hereby granted shall expire April 1, 2003 unless sooner revoked
AUTHORITY FOR POWER OF ATTORNEY
This Power-af-Attorney is made and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a
regularly scheduled meeting of each company duly called and held in 1999 '
RESOLVED The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power
and authority to (1) appoint attorneys-m-fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof and (2) to remove any such attorney-m-fact at any time and revoke
the power and authority given to him or her Attorneys -in -tact shall have power and authority, subject to the terms and limitations of the power-chattorney issued to them,
to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings, recognizances contracts of indemnity and
other writings obligatory in the nature thereof, and any such instrument executed by any such attorney -in -fact shall be fully and in all respects binding upon the Company
Certification as to the validity of any power -of -attorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and in all respects
binding upon this Company The facsimile or mechanically reproduced signature of such officer, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power -of -attorney of the Company, shall be valid and binding upon the Company with the same force and affect as though manually affixed
IN WITNESS WHEREOF the Companies have caused these presents to be signed for each by their officers as shown, and the Corporate seals to be hereto affixed this
,,,,y ,,, January-, 2000
27th day of g
Seals ffiirman,,eaed L .ns� :;cr rr, - I,, " Bruce G Kelley, ChDonald L Coughe wer
o A'•o, - * „`��" of Companies 23 esident Assistant Secretary
Pu,/' of Company 1, Vice Chairman and
= CEO of Company 7
-- SEAL saE = 5 1863 =-_ - = 1953
21
• *2tino��`' . ,,,, gown•
a SEAL : _ = SEAL = _ - SEAL e
sown nr+n,f �uxo,` • 'yo,,,� '�0 �.
91AW'Ai'X
TH A SCAVO
SSION EXPIRES
ber t, 2002
On this 27th day of January AD 2000 before me a
Notary Public in and for the State of Iowa, personally appeared Bruce G Kelley and Donald
L Coughennower, who, being by me duly sworn, did say that they are, and are known to me
to be the Chairman, President Vice Chairman and CEO, and/or Assistant Secretary,
respectively of each of The Companies above, that the seals affixed to this instrument are
the seals of said corporations, that said instrument was signed and sealed on behalf, of each
of the Companies by authority of their respective Boards of Directors, and that the said
Bruce G Kelley and Donald L Coughennower, as such officers, acknowledge the execution
of said instrument to be the voluntary act and deed of each of the Companies
My Commission Expires November 1, 2002
�i a
Notary Public in and for the State of Iowa
CERTIFICATE:
I, David L Hixenbaugh, Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the
Companies, and this Power of Attorney issued pursuant thereto on January 27, 2000
an behalf of Chris Richmond, Russell Michels, Darlene Knngs
are true and correct and are still in full force and effect
In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 8thday of September 200D
i
Vice -President
210
Bollards (Remove and Reset)
4VEA20$
888. 00
604
24" x 24" Catch Basins - Urban Accessories Model
STD
1300
$18,005.00
608
Colored Concrete 4"(Davis color#544)
5745
$27,863.25
609
Vertical Curb and Gutter - special
215
LF
17 . 60
3,784.00
608
Concrete Banding - 6" (gray)
305
LF
12.00
$ 3 , 660. 00
608
Concrete Banding - 18" (gray)
240
LF
14.00
3 360.00
610
Brick Pavers - Type I (bands)
1400
SF
14 , 5 74.00
610
Brick Pavers - Type II (fields)
3230
SF
,
610
Sandstone Inset
15
SF
,
403
Asphalt Patching -6"
20
TN
227.00
$ 4,540.00
412
Concrete Pavement - 6"
1600
SF
5 . 35
8 , 5 00. 00
608
Concrete Lettenng-sandblasting(6locabons)
1
LS
3158.00
3,158.00
630
Traffic Control
1
LS
20383. )0
20, 383. 00
Sub Total-Streetscapmg Improvements
1 1$172_,370.4
202
Removal of structures and obstructions
1
LS
Z../ ;
712
18 -inch PVC C-900
321
LF
86 . 36
$ 27 , 7 21 . 56
706
18 - inch class III RCP
34
LF
67.50
$E2,295.00706
24-mch class111RCP
23
LF
126.00
$604
Type 16 combination inlet
2
EA
2400.00
$
604
Double type 16 combination inlet
2
EA
4200: 00
$ 8,400.00
604
5' dia manhole
3
EA
7017.00
21, 051.00
604
4'dia manhole
1
EA
4589.00
$ 4,589.00
609
Vertical curb and gutter -Special
92
LF
17.60
$ 1,619.2C
712
45 degree bend I18" PVC C-900
3
EA
1145.00
$ 3,435.00
202
Remove asphalt and concrete street pavement
4329
SF
1 . 30
$ 5, 627. 70
7/96 1 Section 00300 Page 3
202
Remove and replace concrete sidewalk near type 16
inlet I
85
SF
4.50
382.50
I
403
Asphalt Patching -6"
20
TN
227.00
4,540.00
412
Concrete Pavement- 6"
1600
SF
5.35
8, 5 0.00
Sub Total-Stormwater Improvements
3 L'
Grand Total
IZF)6
z
7T�lacc-a�n Dollars �Z 13
9 PRICES
411
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the ;Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not excieed
twenty-five percent (25%) of the total Agreement Price.
RESPEC FULLY SUBMITTED:
oo
Signature 1 Date
iGre ory L. Hoff, President
Title
Fyad4P" ut , ,
`(5eaf+'Bii
-Fort Collins #B-6
-,'License Number (If Applicable)
%a' .I
corporation)
Address
1815 Wtst 12th Street
Loveland, CO 80537
Telephone (970) 669-3255 FAX (970) 663-1566
7/96 Section 00300 Page 4
0
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 10% of the contract.
ITEM SUBCONTRACTOR
Concrete Pavers' Creative Hardscape
Asphalt Patch Flatcoat Asphalt
Sand Blasting Armadillo Sandblast
Traffic Control Rocky Mountain Safety
7/96
Section 00430 Page 1
v
SECTION 00420
1 STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions 'may
be answered on separate attached sheets The Bidder may submit any additional
information he desires.
1. Name of Bidder: G.L. Hoff Company
2. Permanent main office address- 1815 West 12th St., Loveland, CO 80537
3. When organized: January 1984
4. If a corporation, where incorporated: Colorado
5 How many years have you been engaged in the contracting business under your
present firm or trade name? 16 years
6. Contracts on hand- (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion-)
CSU Condensate Replacement $277 045. Completion 9-00
CSU University Ave Plaza $224,348. Completion 9-00
CSU Master Storm Drainage $219,773. Completion 9-00
7. General character of Work performed by your company:
Commercial general contractor completing the following areas with our own
forces: sitework, concrete, carpentry, project management
B. Have you ever failed to complete any Work awarded to you? no
If so, where and why"
7
Have your ever defaulted on a contract)
If so, where and why"
10. Are you debarred by any government agency?
If yes list agency name.
7/96 Section 00420 Page 1
M
n
11 List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
Please refer to the attached lists
12. List your ma3or equipment available for this contract.
dump truck, CAT 928 loader, CAT 320 track hoe, backhoes, bobcats,
13. Experience'in construction Work similar in importance to this
project -
Please refer to the attached lists.
14
Background and experience of the principal members
of your organizatiIon,
including officers.
Please refer to the attached lists
15.
Credit available:$ $100,000.
I
16.
Bank reference. Mike Prenzlow, Bank One, Loveland
17.
Will you, upon request, fill out a detailed financial
statement and furnish
any other' information that may be required
by the OWNERS
yes
18.
Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins
and others What
class, license and numbers? #B-6
19.
Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract?
and to whom? Please refer to section 436 of this bid
20.
Are any lawsuits pending against you or your firm at
this time? no
If
TIT. TT
yes,
l
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
2 millionlplus 2 million umbrella
What company? Travelers Insurance
i
22. What are your company's bonding limitations? 5 million
23, The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER', in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at Loveland this 8th day of September 2000
G.L. Hoff Company
Na e�o-f Bid r
By.�—
Title Miriam T1 Hoff, Secretary Treasurer
State of Colorado
County of Larimer
Miriam T. Hoff being duly sworn deposes and says that he is
Secretary Treasurer of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions and all statements therein containedlare
true and correct'.
Subscribed and sworn to before me this day of
AI�nXP/Z&641 2000.
otary Public
�yY y
lsy? commission expires /Z - /�- 67S
V�f0.�A'�'.
7/96
Section 00420 Page 3
T
0
G.L. Hoff Company
Construction Experience
Gregory L. ]Hoff, President and Construction Manager
For the past twenty seven years, Greg has been involved with all aspects of construction
from architectural drafting, surveying and carpentry to supervision and construction
management
Graduating from i Northeastern Junior College in 1972 with a degree in Civil Engmeei mg
Technology, his early work included surveying and architectural design and drafting He
has held a commercial contractor's license with the City of Fort Collins since 1976
Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont,
Boulder, and Thornton
Prior to 1984, Greg worked with Al Hockett, Inc initially as an architectural draftsman and
progressing to project superintendent He was also a partner in H&N[ Builders from 1976
to 1980 This company specialized in custom homes, tenant finish and custom millwork
Beginning in 1984, Greg started his own general contracting business, G L Hoff Company,
which specializes in all types of commercial construction including sitework, excavation
and concrete construction As president and construction manager for G L Hoff Company
Greg works with a wide variety of projects including, schools, churches, city and
government projects, city park developments, as well as many light industrial and concrete
construction jobs Greg oversees all project scheduling, review of construction procedures,
quality control and safety enforcement