Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5539 DOWNTOWN STREETSCAPINGSECTION 00300 BID FORM PROJECT: Downtown Streetscape - Phase I, Bid No. 5539 Place -Fort Collins Purchasing Date September 8, 2000 1. In compliance with your Invitation to Bid dated August 17, 2000 and subject to all conditions thereof, the undersigned G.L. Hoff Company a **(Corporation, fzinited---Ibxfzty Cpmga�r- P���aeelxir-Z3o-i�rE-8e��rxe-br ** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made !in pursuance of and subject to all the terms and condi.tions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, alliof which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashiers check or standard Bid bond in the sum of 5% of bid amount ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows. EMC Insurance Companies, P.O. Box 712, Des Moines, Iowa 50303 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or I 7/96 Section 00300 Page 1 E' Joel S. Reger, Estimator and Project Manager Joel has a Bachelor of Science Degree in Construction Management from Colorado State University and fourteen years experience in the construction field He has continued his education with estimating seminars including training with American Building Company's estimating Access workshop He is also an active member of the Sigma Lambda Chi honorary national construction fraternity During the past ten years, as the chief estimator with G L Hoff Company, Joel has compiled bids and development estimates for projects valued at up to five million dollars As estimator, hey directs project bidding process as well as the review of specifications He is also involved with project management, coordinating proposal requests and change orders with the architect or owner, overseeing material orders to insure that the project is completed in a timely manner and according to specifications William L. Vance, Project Superintendent Bill brings over twenty three years of experience in construction related fields to his position as project superintendent His background includes heavy equipment operating, truss construction, carpentry, and cost estimating He also has experience in both commercial and residential property development from site work and utility lines through finish carpentry Bill has built over five hundred new homes as well as several light commercial properties His commanding knowledge of construction methods enables Bill to be an especially effective project superintendent " 17 G.L. Hoff Company Completed Concrete Projects Equalizer Dam Project Construction of new structural concrete dam outlet structure at the Equalizer Reservoir Work included removal of existing structure, excavation, concrete foundation and walls, gate system and sitework Owner Greeley & Loveland Irrigation Company Ron Brinkman, (970) 352-0495 808 23rd Avenue, Greeley, CO 80631 Contact Boyle Engineering, Lee Queen (303)987-3443 165 South Union Blvd , Suite 200 Lakewood, CO 80228 Contract $308,752 00 Completion 2-99 Ridgeview Park Construction Construction of a new city park for the Fort Collins including demolition, layout, earthwork and drainage, utilities rough -in, irrigation, site paving and surfacing, fine grading and seeding, playground, picnic shelter and furnishings, lighting, and landscaping Owner City of Fort Collins 1 256 West Mountain Avenue Contact Contract Completion Fossil Creek West Fort Collins, CO 80521 Craig Foreman, 221-6366 Parks and Recreation Department $200,900 00 3-99 Construction of a concrete bike and pedestrian trail section west of Taft Hill Road for the City of Fort Collins trail system Scope of work included snework, grading, concrete, bridge installation, fencing, and seeding Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Craig Foreman, 221,6366 Park Planning and Development Contract $168,64200 Completion 11-99 UI "I Nielson Greenway Construction of a concrete and crusher fines pedestrian trail for the Town of Berthoud Scope of work included extensive site grading, sod preparation, concrete sidewalk and curb ramp and stone trail Owner Town of Berthoud P O Box 1229 Berthoud, CO 80513 Contact Marty Lafontaine, 532-2643 Parks Department Contract $123,548 60 Completion II-99 L&M Parking Lot Construction of the L & M Parking Lot at the University of Norther n Colorado The scope of work includes srtework, grading, concrete curb, gutter, walk, and drive pans, asphalt paving, and lighting Owner University of Northern Colorado Carter Hall 1002 Greeley, CO 80639 Contact Scott McLean, (970) 3 51-1982 University of Northern Colorado Contract $223,377 00 Completion 12-99 Cathy Fromme Prairie Parking Area Construction of a parking area at Taft Hill Road and Harmony in Fort Collins Project includes demolition of existing roadway, concrete curb & gutter and asphalt paving Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Craig Foreman, 221-6618 Parks and Recreation Department Contract $101,412 00 Completion 11-99 i Fossil Creek Trail West of Taft Hill Construction of a section of the Fort Collins bike trail system Work includes sitework, concrete sidewalk and bridge abutments, pedestrian bridge and seeding Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Craig Foreman, 221-6618 Parks and Recreation Department Contract $156,247 00 Completion 10-99 Fromme Prairie Raptor Observatory Construction of cast in place observatory budding including curved walls and roof structures Scope of work included excavation drainage and seeding Owner Contact Contract Completion Overland Trail Box Culvert City of Fort Collins 256 West Mountain Avenue, Ft Collins, CO 80521 Janet Meisel, 221-6367 $69,000 00 1-99 Construction of a cast in place box culvert extension to the existing box culvert located at the Pleasant Valley Canal and Overland Trail in Fort Collins Owner City of Fort Collins 256 West Mountain Avenue, Fort Collins, CO 80521 Contact Gary Martinson, 221-6605 Contract $43,022 00 Completion 4-98 Longmont Greenway Phases IV and V Construction of 3500 lineal feet of bike trail and greenway park along the rive] Scope of work includes earthwork, rip -rap, underpass construction below two streets, concrete walkway, crusher fines paths, pedestrian bridge, lighting, landscaping and irrigation Owner City of Longmont 1100 South Sherman Street Longmont, CO 80501 Contact Paula Fitzgerald, (303) 651-8448 Parks and Recreation Department Contract $426,100 00 Completion 1 1-97 IDIXE Kroh Park Multi -Purpose Athletic Complex Construction of a new 33 acre park complex for the City of Loveland Project includes sitework, utility lines, restroom, concession, maintenance, and pump station buildings, parking areas, soccer and softball fields, playground equipment, landscaping, dam construction with inlet piping and concrete outlet structures and an irrigation pump system Owner City of Loveland 500 East 3rd Street, Loveland, CO 80537 Contact Contract Completion North College Trail Underpass Jerry Adamson, (303) 757-1844 Parks & Recreation Department $1,387,405 00 12-96 Construction of a concrete pedestrian, bike trail system for the City of Fort Collins including the Highway 287 underpass Owner City of Fort Collins Purchasing Division 256 West Mountain Avenue, Fort Collins, CO 80521 Contact Craig Foreman, (970) 221-6366 Parks & Recreation Dept Contract $233,762 00 Completion 9-95 Modifications to the Carter Lake Outlet Works and St.Vram Supply Canal G L Hoff worked as a subcontractor on this modification project to the Cartei Lake Outlet Works Our scope of work included Demolition of the existing outlet, shoring and forming, concrete placement, winter protection, electrical service trench, demolition of existing stilling basin and construction of new basin, and placement and compaction of fill material G L Hoff also provided detailed layouts, daily reports, and complete safety plans Owner Northern Colorado Water Conservancy Dist Contractor Gracon Corporation P O Box 869, Loveland, CO 80539 Contact Al Havens, (970)667-2203 Subcontract $169,799 00 Completed February 1995 r Loveland Recreation Trail Underpass Project Construction of three concrete underpass bikeways along the Big Thompson River at Railroad Avenue, First Street and Taft Avenue in Loveland The scope of woi k included clearing, excavation, dewatering, structural excavation and backfill, ripe ar, concrete steel reinforcement, precast channel dram placement and concrete paving at each site Owner City of Loveland, Parks and Recreation Dept 500 East 3rd Street, Loveland, CO 80537 Contact Jerry Adamson, (303) 757-1944 Contract $135,437 00 Completed July 1992 Bridge Abutments Construction of Bridge Abutments along the Big Thompson River for the City of Loveland The scope of work included demolition of existing concrete crossing, structural excavation and backfill, concrete abutments, sidewalks and a ditch operation platform Owner City of Loveland, Parks and Recreation Dept 500 East 3rd Street, Loveland, CO 80537 Contact Jerry Adamson, (303) 757-1844 Contracts Segment3 Project $23,957 00 Viestenz Smith Bridge Project $40,239 00 North Water Treatment Plant Sludge Basin Construction of a sludge basin for the City of Longmont Work includes the excavation, waste disposal, concrete foundation and walls, asphalt pavement, site grading, and piping for a 88' x 160' basin Owner City of Longmont 1100 South Sherman Street Longmont, CO 80501 Contact Don Osborn, (303) 651-8379 Contract $95,911 00 Completion 12-98 IJ G.L. Hoff Company 2000 Completed Projects Arkins Pump Station Construction of coast in place buried pump budding including intei for piping, pump equipment, installation of manual hoist and sectionalizing valve, earthwork, and reclamation of construction site Owner Little Thompson Water District Mike Cook PE, (970) 532-2096 835 East Highway 56 Berthoud, CO 80513 Contact The Engineering Company Warren Mesloh, (970) 484-7477 Contract $86,538 00 Completion February, 2000 Centennial Village Pump Station Construction of non -potable water pump station including well drilling, pump system, budding construction, electrical, and landscaping Owner City of Greeley Phil Carter, (970) 350-9826 1000 10th Street Greeley, CO 80631 Contact Amy Johnson, Aqua Engineering, (970)229-9668 Contract $119,51100 Completion February, 2000 0 M G.L. Hoff Company 1999 Completed ]Projects Equalizer Dam Project Construction of new structural concrete dam outlet structure at the Equalizer Reservoir Work included removal of existing structure, excavation, concrete foundation and walls, gate system, and sitework Owner Greeley & Loveland Irrigation Company Ron Brinkman, (970) 352-0495 808 23rd Avenue, Greeley, CO 80631 Contact Boyle Engineering, Lee Queen (303)987-3443 165 South Union Blvd, Suite 200 Lakewood, CO 80228 Contract $308,752 00 Completion 2-99 Ridgeview Park Construction Construction of a new city park for the Fort Collins including demolition, layout, earthwork and drainage, utilities rough -in, irrigation, site paving and surfacing, fine grading and seeding, playground, picnic shelter and furnishings, lighting, and landscaping Owner City of Fort Collins 256 West Mountain Avenue Contact Contract Completion Mosier Hill Non -Potable System Fort Collins, CO 80521 Craig Foreman, 221-6366 Parks and Recreation Department $200,900 00 3-99 Construction of a non -potable water irrigation system including precast concrete budding, aeration system, pump system intake, irrigation pond lining, cast in place concrete, irrigation pump system, and electrical Owner City of Greeley 1300 A Street Greeley, CO 80631 Contact Phil Carter, (970)350-9826 City of Greeley Contract $193,963 00 Completion 3-99 Fossil Creek West Construction of a concrete bike and pedestrian trail section west of Taft Hill Road for the City of Fort Collins trail system Scope of work included sitework, grading, concrete, bridge installation, fencing, and seeding Owner Contact Contract Completion Nielson Greenway City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Craig Foreman, 221,6366 Park Planning and Development $168,642 00 11-99 Construction of a concrete and crusher fines pedestrian trail for the Town of Berthoud Scope of work included extensive site grading, storm sewer, soil preparation, concrete sidewalk and curb ramp and stone trail Owner Town of Berthoud P O Box 1229 Berthoud, CO 80513 Contact Marty Lafontaine, 532-2643 Parks Department Contract $123,548 60 Completion 11-99 L&M Parking Lot Construction of the L & M Parking Lot at the University of Northern Colorado The scope of work includes sitework, grading, concrete curb, gutter, walk, and drive pans, asphalt paving, and lighting Owner University of Northern Colorado Carter Hall 1002 Greeley, CO 80639 Contact Scott McLean, (970) 351-1982 University of Northern Colorado Contract $223,377 00 Completion 12-99 Cathy Fromme Prairie Parking Area Construction of a parking area at Taft Hill Road and Harmony in Fort Collins Project includes demolition of existing roadway, concrete curb & gutter and asphalt paving Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Craig Foreman, 221-6618 Parks and Recreation Department Contract $101,41200 Completion I1-99 Fossil Creek Trail West of Taft Hill Construction of a section of the Fort Collins bike trail system Work includes srtework, concrete sidewalk and bridge abutments, pedestrian bridge and seeding Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Craig Foreman, 221-6618 Parks and Recreation Department Contract $156,247 Completion 10-99 Loveland Office Max Construction of all concrete work for the new Office Max facility Work includes excavation for foundation, and srtework, concrete budding foundation, floors and all site concrete such as curb and gutter, sidewalks, dock and pads Owner TCC-BTS Loveland OM, Inc 7535 E Hampden Avenue, Suite 650 Denver, CO 80231 Contact Tap Pritchard, (303) 843-1947 Contract $191,845 00 Completion 10-99 Bid Schedules sub3ect to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. _, through G.L. Hoff Company CONTRA T R BY Gregor L. Hoff President ADDRESS 1815 West 12th Street Loveland, CO 80537 (970) 669-3255 FAX (970) 663-1566 8 BID SCHEDULE (Base Bid) Downtown Streets -coping - Phase I £1/17/00 Olive and College (4 corners) and Mountain and College (NE corner only) Bid Schedules Spec/Item Description Total Unit Unit Price Item Total Number Est quantity 212 Tree Protection 17 EA 62.00 A 1 , 054'. 00 202 Remove Highback Curb 8 Gutter, 4" Concrete Sidewalk, Concrete Pavement, Asphalt Pavement, Brick Pavers 11700 SF 1 . 3 15 , 210.00 210 Remove, store and reset signs 1 EA 108.00 108.00 --and 210 Remove of aggregate wall 60 lF 21.75 1,305.00 210 Remove, store; and reset fencing 994 LF 17.80 3, 453. 20 210 Remove, store, and reset mail boxes 2 EA 375.00 A 750.00 210 Remove, store; and reset tree grates and frames 16 EA 208.00 3, 328.00 210 Adjust Manhole 1 EA 200.00 $ 200.00 210 Adjust Valve Box 4 EA 200.00 800. )0 210 Bicycle Rack (Remove and Reset) 9 EA 175.00 1 575. 00 7/96 Section 00300 Page 2 I G.L. Hoff Company 1998 Completed Projects Cathy Vromme Prairie Parking Lot Construction of new parking lot including earthwork, asphalt paving, paving blocks, seeding, and fencing Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Craig Foreman, 221-6366 Parks and Recreation Department Contract $78,43100 Completion 3-98 Loveland Rental Center Construction of new rental center facility including sitework, concrete paving and flatwork, masonry buildings and finishes Owner Bill and Debbie Mortellaro 1023 South Lincoln Avenue Loveland, CO 80537 Contact Bill Mortellaro, 669-6060 Contract $495,705 00 Completion 4-98 Ivy and Rockwell Street Bridges Bridge repairs including sitework, grouting, and new concrete and masonry railings Owner Town of Estes Park 170 MacGregor Avenue Estes Park, CO 80517 Contact Greg Sievers, 586-5331 Town of Estes Park Contract $173,574 00 Completion 4-98 Fossil Creek Trail Construction of concrete bike and pedestrian trail section east of Taft Hill Road for City of Fort Collins trail system Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Craig Foreman, 221-6366 Parks & Recreation Department Contract $111,569 00 Completion 3-98 Golden Ponds Fishing Pier Construction of a handicap accessible fishing pier with caisson foundation, concrete and steel pier structure, wood decking, shoreline grading, i iprap and concrete walk construction Owner City of Longmont 1100 South Sherman Street Longmont, CO 80501 Contact Paula Fitzgerald, (303) 651-8448 Contract $38,046 00 Completion 4-98 LDS Church Remodel Restroom remodel for the Church of Jesus Christ of Latter Day Saints for ADA requirements including electrical modification and interior finishes Owner LDS Church 1400 Lynwood Fort Collins, CO 80521 Contact Douglas Coates, (307)635-4922 Douglas Coates, Architect Contract $70,539 00 Completion 4-98 C Overland Trail Box Culvert Construction of a cast in place box culvert extension to the existing box culvert located at the Pleasant Valley canal and Overland Trail in Fort Collins Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Gary Martinson, 221-6605 Contract $43,022 00 Completion 4-98 Fromme Prairie Observatory Structure Construction of a reinforced concrete structure along the Fossil Creek Bike Trail to provide a raptor observation budding Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Janet Meisel, 221-6367 Contract $68,22100 Completion 8-98 Home State Bank Remodel of existing bank facility including interior remodeling and finishes and exterior sitework and facade renovation Owner Home State Bank 935 North Cleveland Avenue Loveland, CO 80537 Contact Mark Bower, (970)203-6125 Home State Bank Contract $156,000 00 Completion 8-98 1998 Concrete Street Maintenance Remove and replace sections of concrete pavement to repair various areas on Mountain Avenue for the City of Fort Collins Owner City of Fort Collins 256 West Mountain Avenue Fort Collins, CO 80521 Contact Enka Rasmussen,221-6605 Contract $97,126 00 Completion 5-99 Is E North Water Treatment Plant Sludge Basin Construction of an 88' x 160' reinforced concrete sludge basin at the City of Longmont North Water Treatment Plant including subgrade preparation, reinforced concrete push walls, asphalt pavement and dram line Contact UNC Non -Potable Irrigation Supply Construction of a non -potable irrigation supply for the University of Northern Colorado including earthwork, irrigation system, landscaping, pond and pump station, concrete walls and walkways, and PVD mhne diains Owner University of Northern Colorado Carter Hall, Greeley, CO 80639 Greeley, CO 80639 Contact Scott McLean, (970) 351-1982 UNC Facilities Services Contract $260,62100 Completion 11-98 SECTION 00410 KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned G. L. Hoff Company as Principal, and _ Employers Mutual Casualty Company as Surety, are hereby held and firmly bound unto the City of Fort Collins. Colorado. as OWNER. in the sum of $ 5% of total bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, Downtown Streetscape - Phase I; Bid No. 5539_ NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid, and said Surety does hereby waive notice of any such extension Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER 7/96 Section 00410 Page 1 S IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 8th day of Se tember 20 00 and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: G. L. Hoff Company Address• 1815 W. 12th St. Loveland, CO 80537 Title - ATTEST: —7— By (SEAL) SURETY Employers Mutual Casualty Company P.O. Box 441098, Aurora, CO 80044 By: loll Q2�Gc P Gd � Title• Attorney -in -Fact (SEAL) 7/96 Section 00410 Page 2 EdiC Insurance Companies N o. 4 Q 9 8 2 9 P O Box 712 a Des Moines, Iowa 50303 CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT KNOW ALL MEN BY THESE PRESENTS, that 1 Employers Mutual Casualty Company, an Iowa Corporation 2 EMCASCO Insurance Company, an Iowa Corporation 3 Union Insurance Company of Providence, an Iowa Corporation 4 Illinois EMCASCO Insurance Company, an Illinois Corporation 5 Dakota Fire Insurance Company, a North Dakota Corporation 6 EMC Property & Casualty Company, an Iowa Corporation 7 The Hamilton Mutual Insurance Company, an Ohib Corporation hereinafter referred to severally as "Company' and collectively as "Companies", each does, by these presents, make, constitute and appoint CHRIS RICHMOND, RUSSELLMICHELS, DARLENE KRINGS, INDIVIDUALLY, FORT COLLINS, COLORADO its true and lawful attorney-m-fact, with full power and authority conferred to sign, seal and execute its lawful bonds, undertakings, and other obligatory Instruments of a similar nature as follows JN AN AMOUNT NOT EXCEEDING TEN MILLION DOLLARS Si 0,000,000 00) and to bind each Company thereby as fully and to the same extent as if such Instruments were signed by the duly authorized officers of each such Company, and all of the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed The authority hereby granted shall expire April 1, 2003 unless sooner revoked AUTHORITY FOR POWER OF ATTORNEY This Power-af-Attorney is made and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a regularly scheduled meeting of each company duly called and held in 1999 ' RESOLVED The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power and authority to (1) appoint attorneys-m-fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof and (2) to remove any such attorney-m-fact at any time and revoke the power and authority given to him or her Attorneys -in -tact shall have power and authority, subject to the terms and limitations of the power-chattorney issued to them, to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings, recognizances contracts of indemnity and other writings obligatory in the nature thereof, and any such instrument executed by any such attorney -in -fact shall be fully and in all respects binding upon the Company Certification as to the validity of any power -of -attorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and in all respects binding upon this Company The facsimile or mechanically reproduced signature of such officer, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power -of -attorney of the Company, shall be valid and binding upon the Company with the same force and affect as though manually affixed IN WITNESS WHEREOF the Companies have caused these presents to be signed for each by their officers as shown, and the Corporate seals to be hereto affixed this ,,,,y ,,, January-, 2000 27th day of g Seals ffiirman,,eaed L .ns� :;cr rr, - I,, " Bruce G Kelley, ChDonald L Coughe wer o A'•o, - * „`��" of Companies 23 esident Assistant Secretary Pu,/' of Company 1, Vice Chairman and = CEO of Company 7 -- SEAL saE = 5 1863 =-_ - = 1953 21 • *2tino��`' . ,,,, gown• a SEAL : _ = SEAL = _ - SEAL e sown nr+n,f �uxo,` • 'yo,,,� '�0 �. 91AW'Ai'X TH A SCAVO SSION EXPIRES ber t, 2002 On this 27th day of January AD 2000 before me a Notary Public in and for the State of Iowa, personally appeared Bruce G Kelley and Donald L Coughennower, who, being by me duly sworn, did say that they are, and are known to me to be the Chairman, President Vice Chairman and CEO, and/or Assistant Secretary, respectively of each of The Companies above, that the seals affixed to this instrument are the seals of said corporations, that said instrument was signed and sealed on behalf, of each of the Companies by authority of their respective Boards of Directors, and that the said Bruce G Kelley and Donald L Coughennower, as such officers, acknowledge the execution of said instrument to be the voluntary act and deed of each of the Companies My Commission Expires November 1, 2002 �i a Notary Public in and for the State of Iowa CERTIFICATE: I, David L Hixenbaugh, Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the Companies, and this Power of Attorney issued pursuant thereto on January 27, 2000 an behalf of Chris Richmond, Russell Michels, Darlene Knngs are true and correct and are still in full force and effect In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 8thday of September 200D i Vice -President 210 Bollards (Remove and Reset) 4VEA20$ 888. 00 604 24" x 24" Catch Basins - Urban Accessories Model STD 1300 $18,005.00 608 Colored Concrete 4"(Davis color#544) 5745 $27,863.25 609 Vertical Curb and Gutter - special 215 LF 17 . 60 3,784.00 608 Concrete Banding - 6" (gray) 305 LF 12.00 $ 3 , 660. 00 608 Concrete Banding - 18" (gray) 240 LF 14.00 3 360.00 610 Brick Pavers - Type I (bands) 1400 SF 14 , 5 74.00 610 Brick Pavers - Type II (fields) 3230 SF , 610 Sandstone Inset 15 SF , 403 Asphalt Patching -6" 20 TN 227.00 $ 4,540.00 412 Concrete Pavement - 6" 1600 SF 5 . 35 8 , 5 00. 00 608 Concrete Lettenng-sandblasting(6locabons) 1 LS 3158.00 3,158.00 630 Traffic Control 1 LS 20383. )0 20, 383. 00 Sub Total-Streetscapmg Improvements 1 1$172_,370.4 202 Removal of structures and obstructions 1 LS Z../ ; 712 18 -inch PVC C-900 321 LF 86 . 36 $ 27 , 7 21 . 56 706 18 - inch class III RCP 34 LF 67.50 $E2,295.00706 24-mch class111RCP 23 LF 126.00 $604 Type 16 combination inlet 2 EA 2400.00 $ 604 Double type 16 combination inlet 2 EA 4200: 00 $ 8,400.00 604 5' dia manhole 3 EA 7017.00 21, 051.00 604 4'dia manhole 1 EA 4589.00 $ 4,589.00 609 Vertical curb and gutter -Special 92 LF 17.60 $ 1,619.2C 712 45 degree bend I18" PVC C-900 3 EA 1145.00 $ 3,435.00 202 Remove asphalt and concrete street pavement 4329 SF 1 . 30 $ 5, 627. 70 7/96 1 Section 00300 Page 3 202 Remove and replace concrete sidewalk near type 16 inlet I 85 SF 4.50 382.50 I 403 Asphalt Patching -6" 20 TN 227.00 4,540.00 412 Concrete Pavement- 6" 1600 SF 5.35 8, 5 0.00 Sub Total-Stormwater Improvements 3 L' Grand Total IZF)6 z 7T�lacc-a�n Dollars �Z 13 9 PRICES 411 The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the ;Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not excieed twenty-five percent (25%) of the total Agreement Price. RESPEC FULLY SUBMITTED: oo Signature 1 Date iGre ory L. Hoff, President Title Fyad4P" ut , , `(5eaf+'Bii -Fort Collins #B-6 -,'License Number (If Applicable) %a' .I corporation) Address 1815 Wtst 12th Street Loveland, CO 80537 Telephone (970) 669-3255 FAX (970) 663-1566 7/96 Section 00300 Page 4 0 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEM SUBCONTRACTOR Concrete Pavers' Creative Hardscape Asphalt Patch Flatcoat Asphalt Sand Blasting Armadillo Sandblast Traffic Control Rocky Mountain Safety 7/96 Section 00430 Page 1 v SECTION 00420 1 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions 'may be answered on separate attached sheets The Bidder may submit any additional information he desires. 1. Name of Bidder: G.L. Hoff Company 2. Permanent main office address- 1815 West 12th St., Loveland, CO 80537 3. When organized: January 1984 4. If a corporation, where incorporated: Colorado 5 How many years have you been engaged in the contracting business under your present firm or trade name? 16 years 6. Contracts on hand- (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion-) CSU Condensate Replacement $277 045. Completion 9-00 CSU University Ave Plaza $224,348. Completion 9-00 CSU Master Storm Drainage $219,773. Completion 9-00 7. General character of Work performed by your company: Commercial general contractor completing the following areas with our own forces: sitework, concrete, carpentry, project management B. Have you ever failed to complete any Work awarded to you? no If so, where and why" 7 Have your ever defaulted on a contract) If so, where and why" 10. Are you debarred by any government agency? If yes list agency name. 7/96 Section 00420 Page 1 M n 11 List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Please refer to the attached lists 12. List your ma3or equipment available for this contract. dump truck, CAT 928 loader, CAT 320 track hoe, backhoes, bobcats, 13. Experience'in construction Work similar in importance to this project - Please refer to the attached lists. 14 Background and experience of the principal members of your organizatiIon, including officers. Please refer to the attached lists 15. Credit available:$ $100,000. I 16. Bank reference. Mike Prenzlow, Bank One, Loveland 17. Will you, upon request, fill out a detailed financial statement and furnish any other' information that may be required by the OWNERS yes 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state? Fort Collins and others What class, license and numbers? #B-6 19. Do you anticipate subcontracting Work under this Contract? yes If yes, what percent of total contract? and to whom? Please refer to section 436 of this bid 20. Are any lawsuits pending against you or your firm at this time? no If TIT. TT yes, l 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL 2 millionlplus 2 million umbrella What company? Travelers Insurance i 22. What are your company's bonding limitations? 5 million 23, The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER', in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at Loveland this 8th day of September 2000 G.L. Hoff Company Na e�o-f Bid r By.�— Title Miriam T1 Hoff, Secretary Treasurer State of Colorado County of Larimer Miriam T. Hoff being duly sworn deposes and says that he is Secretary Treasurer of G.L. Hoff Company and that (name of organization) the answers to the foregoing questions and all statements therein containedlare true and correct'. Subscribed and sworn to before me this day of AI�nXP/Z&641 2000. otary Public �yY y lsy? commission expires /Z - /�- 67S V�f0.�A'�'. 7/96 Section 00420 Page 3 T 0 G.L. Hoff Company Construction Experience Gregory L. ]Hoff, President and Construction Manager For the past twenty seven years, Greg has been involved with all aspects of construction from architectural drafting, surveying and carpentry to supervision and construction management Graduating from i Northeastern Junior College in 1972 with a degree in Civil Engmeei mg Technology, his early work included surveying and architectural design and drafting He has held a commercial contractor's license with the City of Fort Collins since 1976 Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont, Boulder, and Thornton Prior to 1984, Greg worked with Al Hockett, Inc initially as an architectural draftsman and progressing to project superintendent He was also a partner in H&N[ Builders from 1976 to 1980 This company specialized in custom homes, tenant finish and custom millwork Beginning in 1984, Greg started his own general contracting business, G L Hoff Company, which specializes in all types of commercial construction including sitework, excavation and concrete construction As president and construction manager for G L Hoff Company Greg works with a wide variety of projects including, schools, churches, city and government projects, city park developments, as well as many light industrial and concrete construction jobs Greg oversees all project scheduling, review of construction procedures, quality control and safety enforcement