Loading...
HomeMy WebLinkAboutRESPONSE - RFP - P1080 PFA ARCHITECTURAL AND ENGINEERING SERVICESBELFORD WATKINS GROUP ARCHITECTS, LLC INil....i I CON SL LTING GRON� Pioneer Charter School - Fort Collins, Colorado Prole( t Manager for an Outward Bound Expeditionary Learning (ELOB) Charter School in Fort Collins The project is located on a tract of the Rigden Farm First Filing and is bisected by a large drainage channelldetention facility The project included sustainable design considerations and LEER Certification The site improvements included the school building, associated parking, a pedestrian bridge and special onsite features such as an amphitheatre built into the drainage channel Wray School Additions - Wray, Colorado Project Manager for multiple building additions located on the Wray School District site The project entailed site civil design services for building additions to the Multi -Purpose Room, Ag Building and High School The site improvements included utility, grading and drainage designs associated with the building additions and the relocation of existing playground equipment Estes Park School Campus — Estes Park, Colorado Project Manager for various building additions to the Estes Park School Campus The project included separate additions to the Elementary, Intermediate, Aquatic Center and High School buildings as well as various parking, and site improvements to the Stadium and Campus Existing utilities were relocated around the additions and a new storm drainage system was developed Gateway Plaza - Greeley, Colorado Project Manager for a 3-acre commercial subdivision in the City of Greeley The project is comprised of a three lot subdivision including a carwash, liquor store and future pad site Special design considerations include offsite utility extensions, significant grading and retaining wall usage and incorporation of the onsite Greeley -Loveland Irrigation Company overflow structure into the site layout Downtown Enhancement Project - Fort Collins, Colorado Project Manager providing engineering support to the City of Fort Collins for the design of numerous intersection improvements in downtown Fort Collins The project included upgrades to Mountain Ave, Mountain & Mason Intersection, left turn lane extension on College Ave, addition of enhanced crosswalks at four major intersections on College Ave, storm drainage improvements and adherence to new ADA Accessibility Guidelines The project included State funding and coordination with officials with the Colorado Department of Transportation Foothills Community - Boulder, Colorado Project Manager for this 12-acre affordable housing project in northwest Boulder, developed by the Boulder Housing Authority Preliminary and Final design for infrastructure of multifamily, townhouse and duplex units with a community building, trails and open space Development constraints included the mapping and relocation of an existing flood plain and incorporation of an existing open irrigation system through the development The design incorporated new urbanistic architecture, alleys and carriage units G�qUff 5 ASS CIATE.5 INC G L, T2jcL 55871b0,t i9th Street C.realet, Cninndo 60634 RESUME been in many areas of industrial, institutional, waste water, and commercial design These areas include; low voltage and high voltage distribution, lighting, fire alarms, control, instrumentation, energy management, and various special systems REPRESENTATIVE PROJECTS RONALD J. McNUTT, P.E. Eaton Fire Station —Eaton, CO Electrical Engineering Consultant Designed the electrical system Windsor/Severance Fire Station — Windsor, CO EDUCATION Bachelor of Science/ Designed the electrical system Electrical Engineering Union Colony Fire Rescue Station #3 & #7 — University of Colorado Greeley, CO Boulder, Colorado Designed the electrical system REGISTRATION Licensed Professional Lafayette Fire Station — Lafayette, CO Engineer Designed the electrical system States of Colorado, Arizona, California, Fire Station #5 — Loveland, CO Connecticut, Maryland, Designed the electrical system Massachusetts, Michigan, Nebraska, Spring Canyon Fire Station — New Mexico, New York, Designed the electrical system NCEES, Pennsylvania, South Dakota, North Metro Fire Rescue — Texas, Utah, Virginia, Designed the electrical system Wyoming Certified Consulting West Adams County Fire Protection 5 stations - Engineer Adams County, Colorado State of Colorado Designed the electrical systems PROFESSIONAL R J McNutt & Associates, Inc Greeley, Colorado President PROFESSIONAL ORGANIZATIONS Consulting Engineer's Council Illuminating Engineering Society SUMMARY OF EXPERIENCE AND CAPABILITIES Mr McNutt's specialty of study in engineering was power distribution and computer control systems He has been a design engineer in the construction field for thirty-three years This experience has Poudre Fire Authority 3 stations - Fort Collins, Colorado Designed the electrical systems Bancroft Fire Station - Bancroft, Colorado Designed the electrical system Island Grove Community Center Greeley, CO Designed the electrical system Island Grove Regional Treatment Facility Greeley, CO Designed the electrical system South Park Ambulance — Fairplay, CO Designed the electrical system Loveland Police & Courts Facility Loveland, CO Designed the electrical system I AE AssoctAl I3S ALICIA B THORPE, PE PROJECT MANAGER EDUCATION Bachelor of Science in Architectural Engineering, 1997 University of Wyoming University of Wyoming Professional Advisory Board for Civil and Architectural Engineering Department (Term 2001-2006) REGISTRATION Professional Engineer(PE)- Colorado QUALIFICATIONS RECENT EXPERIENCE: OTHER NOTABLE PROJECTS PROFESSIONAL ASSOCIATIONS Since joining AE Associates, Inc in 1997, Ms Thorpe has worked as a Project Manager and designer in mechanical HVAC design Her responsibilities include project design and coordination of mechanical systems as well as on -site problem solving As an engineer at AE Associates, she functions in project management roles for various projects Alicia has expenence in design of both new construction and remodel projects, and has been involved in start-up and operation through her work on commissioning teams LOVELAND POLICE AND COURTS Loveland, Colorado Project Manager for this 96,000 at two-story ice budding that houses Police functions for the City of Loveland, and Court functions for Lanmer County The mechanical systems were handled under a Design -Build arrangementwith U S Engineering Company LOVELAND MEDICAL CENTER Loveland, Colorado Alicia functioned as project manager and lead HVAC designer for this 78,000 square foot medical office building The functions of this building include medical office space, procedure areas, surgical suites, overnight beds and imaging department (MR1, CT Scanning, X-Ray, mammography, ultrasound, etc) NORTH COLORADO MEDICAL CENTER MOB I Greeley, Colorado Alicia functioned as project managerfor the shell and core portion of this fourstory medical office building (three above grade levels plus basement) DENVER CONVENTION CENTER HOTEL Denver, Colorado Project Manager for this $250 million, 38-story, Hyatt Hotel currently under construction at the cornerof California and 15"' Street in downtown Denver Part of her responsibility included the high rise smoke control systems The mechanical systems were handled under a Design -Assist arrangement PORTOFINO TOWER Denver, Colorado Alicia functioned as the Project Managerforth is 120,000 sf, fourteen story, luxury condominium with four levels of underground parking Part of her responsibility included the high rise smoke control systems Westin Hotel at Denver International Airport - Denver, Colorado Summit View Medical Office Building - Greeley, Colorado University School - Greeley, Colorado O'Meara Ford - Northglen, Colorado American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) A AssoclAII'S GREGORY R MARTINO, PE PRESIDENT EDUCATION REGISTRATIONS QUALIFICATIONS SIGNIFICANT PROJECTS Bachelor of Architectural Engineering, 1971 Pennsylvania State University LEED' 2 0 Accredited Professional California, Colorado, Nevada, and most other states As Founder and President, Mr Martino mentors his staff to listen to what the client wants, propose creative but cost effective solutions, and accept feedback positively A firm opponent of micro -management, he enables each staff member to do their job as effectively and efficiently as they can within his general guidelines His commitment tobuilding system commissioning not only ensures owner satisfaction at the completion of the project, but also provides valuable feedback for staff education and design improvement By maintaining this exceptional level of service most clients have become repeat clients, and in some instances AE Associates has become a "sole -source' for engineering services POLICE and COURTS BUILDING Loveland, Colorado Project Director for this 96,000 sf two-story office building that houses Police functions for the City of Loveland, and Court functions for Lanmer County The mechanical systems were handled under a Design -Build arrangement with U S Engineering Company LOVELAND MEDICAL CENTER Loveland, Colorado Project Director for this 78,000 sf, two-story, medial office budding that houses an Imaging Center, four surgical suites, and extensive office space for doctors The mechanical systems were handled under a Design -Assist arrangement with U S Engineering Company GSA-NRRC Foil Collins, Colorado Project Director for this 120,000 sf, three-story office building for several federal government offices The mechanical systems were handled under a Design -Budd arrangement D 0 T OFFICE BUILDING Lakewood, Colorado Project Director for this 128,000 sf, three story office building for the federal Department of Transportation The mechanical systems were handled under a Design -Build arrangement MILLENIUM FINANCIAL Denver, Colorado Project Director for this 140,000 sf, three story, Class A office building located in downtown Denver The mechanical systems were handled under a Design -Build arrangement SUMMIT VIEW MEDICAL OFFICE BUILDING Greeley, Colorado Project Directorfor this 58,000 sf, two story, medical office building that houses an Imaging Center and extensive office space for doctors The mechanical systems were handled under a Design -Build arrangement PROFESSIONAL American Society of Heating, Refrigeration and An -Conditioning Engineers AFFILIATIONS American Consulting Engineers Council International Code of Budding Officials National Fire Protection Association SECTION 2 ® Q Proposed Approach 0 Q Motivation Belford Watkins Group is uniquely qualified for the Scope of Work ® anticipated under this request for Architectural Services Not only has Belford Watkins Group personnel been involved in new and prototypical Q station design, but also many remodel and addition protects to existing stations In fact, our experience is extensive in the difficult venue of renovation work ranging from addition / remodel protects for fire stations, 0 churches and schools, to small controlled maintenance protects for school ® districts and municipalities The proposed) team for the Poudre Fire 'Watkins Authority contract includes many firms that Belford has worked with ® on fire stations and renovation protects, as well as consultants that have worked successfully with the City of Fort Collins in the past Naa ,r Availability Belford Watkins Group has the availability to start work at any time Once Poudre Fire Authority's target dates are known, Belford Watkins can recommend a schedule to accomplish the deadline with 0 written and/or graphic schedule matenal that will set milestones for the entire Design / Owner Team Belford Watkins has been involved in many public school protects that require: strict adherence to t schedules in order to accomplish construction within specified windows This is exemplified by local projects for the Poudre School District including the recent renovation to Blevins Junior High and addition/remodels completed for Riffenburgh and Bennett Elementary Schools The size of protects anticipated by Poudre Fire Authority can be easily accommodated with existing staff and they will be completed in Poudre Fire Authority's time frames Belford ®Watkins ' presence in Fort Collins along with consultants from the surrounding area allow easy access to and historywith local entities Milt This presence also affords the Owner easy access to design ® personnel and quick response to protect issues especially during construction ® Attitude These are your protects, not ours You will pay for it, use the facilities, and maintain the buildings for the foreseeable futul e ® We provide many good, creative choices and recommendations You make all the decisions We believe the talent in this profession is to take the user group's ideas and aspirations, and make a usable, attractive protect ® We use a charrette process in which we present many alternatives Together, we will discuss the pros and cons of the different options, and the best ideas rise to the top ® This technique allows Owners to drive the direction of the design and allows for a natural consensus to be built among a potentially diverse group of people, departments and interests ® P O U D R E FIRE R E AUTHORITY T Y ARCHITECTURAL T E C T U R A L & ENGINEERING G I N E E R I N G S E R V I C E S 8eUbrd Watkins Group, LLC SECTION d We find that people get more excited about a project when they are asked to participate and give input The photographs above show Mark Belford presenting options in atypical charrette setting Please note the walls are filled with options Cost Control Methods The following describes our philosophy and approach to project cost control Set expectations during the programming phase The program provides accurate detail about the quantities and types of space It also captures the overall quality of construction that the city and fire authority expects The time and effort spent on developing a realistic budget will pay dividends as the project moves forward info design We will work from a milestone design schedule At the first milestone, our design team can develop a very useful tool — a cost model This tool is nothing more than a baseline estimate broken down by building systems It is then used as a measuring stick for subsequent design decisions and estimates With this powerlul tool, out design team can prioritize design decisions Decisions will be acknowledged through meeting minutes, space planning sheets and schematic design drawings and form the foundation for subsequent construction document eflorts Value engineering, if needed, will be based on items that minimally affect the scope, aesthetics, or function of the facility POUDRE FIRE AUTHORITY ARCHITECTURAL & ENGINEERING S E R V I C E S Belford Watkins Group LLC SECTION Different systems and materials will be analyzed for their Inclusion Into this project Use of alternates in the bidding process is an effective way to control possible budget issues Day to day attention to, understanding of, and designing in the current market conditions Deliverables As we move through the design process, early deliverables will Include a written Programmatic document and Space Diagram Options with associated Cost Models to investigate different approaches to the project including site development options as needed Once the budget has been arrived at and the approach to the project set, final Schematic Design documents will be generated including a Site Plan, Floor Plan, Building Elevations and a Cost Estimate Finally, all of the design information will be summarized in a Schematic Design Manual that will include a written executive summary including conceptual systems for the building, findings for the site including survey, utility and geotechnlcal findings, Data Sheets for each space within the building and the above drawings and cost estimate Following are examples of some of these deliverables and the design process POUDRE FIRE AUTHORITY ARCHITECTURAL & EMGINEERING S E R V I C E S Belford Watkins Group LLC SECTION d Programming Each space required by the Fire Department will be analyzed by need The rooms are given an appropriate square footage based on usage, mechanical, electrical and architectural systems UNION COLONY FIRE RESCUE STATION 3 Room Number 127 Room Name Trammg/Commumty/EOC Square Feet 1000 square feet Functional Descnpuon Emergency Operations Center/Training Room/Community Room a Architectural 1 Separate entrance to the front of the site with a second means of secure access to the fire station living quarters and an emergency exit 2 Window coverings for room darkening 3 ADA mens and women's bathrooms 4 Parking adequate for occupant load plus additional spaces for fire station personnel (Consider separate public and fire station parking) 5 Parking for visiting fire apparatus b Structural 1 9' ceding height 2 Carpeted floor c Mechanical d Electrical I Wall, floor and ceding outlets 2 Wired for Cable Television at each end of room 3 Muumum two duplex outlets at the wet bar 4 Adjustable lighting 5 Ceding Mounted Digital Light Projector wired) to media closet 6 Emergency generator capable of supplying the entire building e Communications I Station communications speaker with adjustable volume 2 Telephone lines (20) preferable wireless 3 Modem Imes 4 Access to main frame computers (20) preferable wireless 5 Public Address system for the community, policy, and conference rooms only f Fire Protection I Full sprinkler system with smoke detection that is not single station g Special Considerations I White boards for presentations 2 Bulletin Boards 3 Facilities for two wall mounted TV's with appropnate backing 4 Separate entryway to have a secure bulletin board for scheduling calendar 5 Allow storage space for tables and chairs 6 Flip chart clip/pm strips on all walls 7 Wet bar to be equipped with a garbage disposal 8 Cupboards above the wet bar need to lugh enough for a commercial coffee maker h Security 1 Programmable lock on main entrance Example of a programming sheet — The sheets are used to analyzed and create cost model analysis POUDRE FIRE AUTHORITY ARCHITECTURAL & ENGINEERING S E R V I C E S Be/ford Watkins Group LLC 0 SECTION d Cost Models After the programming Is complete, the cost models are created to ® help assist the Owner In making decisions based on different building systems Cost Model #1 OuaBty Leval .Im11M m Station #r Flat ROW at Apparatus Bey, 412 Hip Roofs Elsewhere ® More Compact Footprint No PrecastA amts Thme Ba t000ma for EVIs Bunknoms ® ApparaNs Bay 4,480 $123 73 $154,332 AW r-dus Am,.II ry 1,660 z $I404J = $241117 ®Living Quarters 2„924 x $11134 = $394,047 v Sla'pjng Quancra 2,196 x S20970 S460491 ® Training Room 612 x $16089 = $98,467 Bmldmg 11,872 $1,730,454 $146/ef Srte $473,000 ® Subtdal $2,201,454 $186 fs I ® lnFlanon to March 2006 $89,138 4% b 3%Change Onict Conhngenoy S68,748 Total $2,360,340 ® Cost Model #4 ® M. Flmcu, Appa-mc cry a". HVAC and Ebc to Bwment Space Remove Ma rune morepe at Appenlus Bay ® and Flat Root over Apparatus Anc,llary ® 1,p,vrnmsBay 4,480 $10357 — $464,002 Appsmlos Aacrllary 1271 $13916 — $175,579 ® m Lrvp Qan uan 1,911 a $13ROfl $264,172 skcpwp Qrwncra Basmnmu 2,196 1 1200 $17996 $9572 — $395,194 — $114%8 Trarnmg Rwm 612 a S14354 S87846 ® SubmtW 11 672 $1 501 662 S129 /n 1 ® Srte $473 UW Subeaal $t 974 662 $169 1, r ® InlUmm m March 2006 S78 986 4'% ® 34 Chnn, (TOer Commgeaoe i61 609 ® total 52,115,357 ® Examples of 2 different Cost models ® POUDRE FIRE AUTHORITY ARCHITECTURAL & E PJ G I N E E R I N G S E R V I C E S Belford Watkins Group LLC SECTION d Charrette The Charette process is used to help the Owner make decisions about the extenor look of a building or the arrangement of spaces After the design is defined, the cost estimate is further refined Design Option 1 Fire Station #3 — Union Colony- based off of Union Colony Station 7 floor plan Design Option 2 Fire Station #3 — Union Colony — Based off of the Union Colony Station 7 prototypical Floor plan and additional square footage for the new bays and training room POUDRE FIRE AUTHORITY ARCHITECTURAL & ENGINEERING S E R V I C E S Belford Watkins Group LLC TABLE OF CONTENTS Cover Letter Section One Section Two Statement of Qualifications Capabilities of Finn Assigned Personnel Proposed Approach Motivation Availability Attitude Cost Control Methods Deliverables Section Three Fee Proposal Section F o u r Relevant Experience & References POIJORE FIRE AUTHORITY -ARCHITECTURAL & ENGINEERING S E R V I C E S Belford Watkins Group LLC SECTION 2 Design Option 2 — Fire Station #3 — Floor Plan based off of Initial wish list of the Union Colony Fire District- and Fire Station 7 as the prototypical plan that was to be re -used Design Option 3 — Fire Station #3 — Union Colony — Owner groups request turn of the century style, remove training room to meet budget constraints POUDRE FIRE AUTHORITY ARCHITECTURAL & ENGINEERING S E R V I C E S Belford Watkins Group LLC SECTION d Design Option 4 Fire Station #3 — Union Colony — Owner Group request turn of the century style Final Design product Fire Station #3— Union Colony— cost analysis and final construction budget based off of this design concept Schematic Design After final probable construction cost analysis, site plan, exterior elevations and floor plans have been approved by the Owner, the formal schematic design drawings are finalized MG can provide the Owner Group with photographic renderings of the exterior building sited correctly on the property Photographic rendering of the Union Colony Model of Redeemer Lutheran Church -used Station #7 project — Used for City Council Approval for fund raisers POUDRE FIRE AUTHORITY ARCHITECTURAL & ENGINEERING S E R V I C E S Safford Watkins Group, LLC SECTION 3 Fee Proposal Fees would be based upon the following ranges Basic A/E Services Fees for basic architectural, structural, mechanical and electrical services would range from 5 5 - 6 5% for reuse of the prototypical station in the same configuration as Station #12 with minor changes and re -siting the design (not including civil, planning and landscaping services) to 6 5- 7 5% for design of a new station type (not including civil, planning and landscaping services) Note Civil, planning and landscaping services can range from 15 to 2 percent of the construction cost depending on the complexity of the site and the extent of the planning review process required 8-11% for remodel work depending on the project size and the extent of mechanical and plumbing revisions Reimbursable Expenses Anticipated reimbursable expenses would be 5 — 10% of design fees Fees would be towards the lower end of the range if the city were responsible for printing costs for bid sets It is assumed that security, surveying and geotechnical services would be contracted separately by the City but, if necessary, could be provided as consultants of Belford Watkins Hourly Rates Belford Watkins Group Principal Project Coordinator Intern Architect CAD Technician Clencal Reimbursables Reimbursable expenses would include Travel Long distance phone calls Postage Reproduction $105 00/hr S. 95 00/hr $ 70 00/hr $ 55 00/hr $ 25 00/hr POUDRE FIRE AUTHORITY —ARCHITECTURAL & E IV G I N E E R I N G S E R V I C E S Belford Watkins Group, LLC CSE Consultants 4710 S College Ave Ft Collins, CO 80525 phifax (970) 282-8005 e-mail Alcse@gwest net CSE Consultants - Structural Engineering Hourly Billing Rate Schedule 2007 CATEGORY RATE Project Manager $100 Project Engineer $80 Design Engineer $70 CAD Drafting $70 Administrative $50 INTIRMOi CON:U LTING GROIN INTERWEST CONSULTING GROUP PROFESSIONAL SERVICE RATES 2007 1 PERSONNEL HOURL•( RA E Principal $120 Project Manager $98 Sr Project Engineer $88 Project Engineer $83 Design Engineer $75 CAD Technician $60 Clerical $45 Mileage $0 55/mile Copies (8'/s" X 11") $0 18/copy Prints (24" X 36") $2 00/sheet Mylar Sepia (24" X 36") $13 00/sheet Vellum (24" x 36") $7 00/sheet Unless otherwise stated in the Agreement for Professional Services, reimbursable expenses such as outside reproduction, deliveries, sub -consultant fees, and travel costs are in addition to the base contract fees and are charged as listed above or at cost plus fifteen percent These Professional Service Rates are considered Confidential and shall not be released to a third party without written permission of Interwest Consulting Group, Inc Rates are subject to change ASSOC ATES INC rLrCr2jCA1 UVtFrRs 55S7 We,t lyth Street Greeley, Colorado 80634 Hourly Rates 2007 Principal Engineer Designer AutoCad Operator Clerical G RW6R J.W2007 Mast.m H. dy rites d. @ $110 00 per hour @ $ 95 00 per hour @ $ 80 00 per hour @ $ 60 00 per hour @ $ 45 00 per hour AE Associates, Inc. 5587 West 19t' Street Greeley, Colorado 80634 RATE SHEET 2007: 1 President 2 Principals 3 Project Managers 4 Engineers 5 Designers 6 CAD Drafters 7 Administrative $175 00 per hour $135 00 to $145 00 per hour $125 00 to $135 00 per hour $ 90 00 to $115 00 per hour $ 65 00 to $105 00 per hour $ 45 00 to $65 00 per hour $ 35 00 to $45 00 per hour SECTION 4 Relevant Experience The following pages show selected protects that are representative of our experience C l i e n t Project Cost R e l e v a n c e C l i e n t P r o I e c t Cost R e I e v a n c e Union Colony Fire Rescue - Station #7 Greeley, Colorado $1,400,000 New Facility Fire station #7 represented the development of the prototypical station for Union Colony Special attention was given to design of a facility that meets fundamental requirements for the Authoi dy at any location, but allows flexibility to adapt and expand based upon site specific requirements Don Watkins -Project Architect Union Colony Fire Rescue Fire Station #3 Greeley, Colorado $1, 900, 000 New Facility This fie station is currently completing construction and is based upon the prototypical station for Union Colony noted above Escalation of costs in the current construction environment provided a challenge to maintain the much desired functionality of the prototypical Station #7 while increasing the number of apparatus bays and sleeping quarters In depth cost models were investigated to value enE sneer systems and materials and prioritize goals to bring this protect into budget POUDRE FIRE AUTHORITY ARCH I T E C T U A L AND ENGINEERING S E R V I C E S Beh ord Watkins Group LLC SECTION Ot C l i e n t City of Loveland, Loveland Fire Department Live Fire Training Prop Loveland, Colorado Protect Coat $660,000 R e l e v a n c e New Facility The latest addition to the Loveland Fire Departments facilities is a live fire training prop that is in the initial stages of construction This two thousand square foot, two story, cast -in -place concrete structure will be added to the city's training facility and will provide a realistic training environment for the firefighters C l i e n t North Metro Fire Rescue District #66 Broomfield, Colorado Protect Cost $2,118,000 R e l e v a n c e New Facility This latest fire station for North Metro Fire Rescue District provides response to the growing area south of Lafayette, east of Louisville and north of Broomfield immediately adjacent to the new Northwest Parkway The building was designed with an agranan theme in keeping with the concept for the surrounding community including a i adio tower disguised as a water windmill and native grass plantings A longitudinal clearstory provides exceptional daylighting at the Apparatus Bay Don Watkins Prol act Architect _Z7 L-1-AA POUDRE FIRE A U T H O R I T Y ARCHITECTUAL AND ENGINEERING S E R V I C E S Belford Watkins Group LLC SECTION 4 C l i e n t Nederland Fire Station Nederland, Colorado Project Cost $2,100,000 R e l e v a n c e New Facility The site for this budding was very tight and required a two story � approach to accomplish the desired building program, the location of the building is very prominent in the community, the budding accommodates paid and volunteer personnel and administrative offices have also been _ _ Incorporated in the facility The building has two ambulance bays and three double loaded Apparatus bays for six vehicles, storage space, and an area for bio- Decontamination and turnout gear It ,p�fp ii+130 The administration/ business area of the station has a large training Room, officer's office, conference room, chief office and an 1--`--- Administration office The second floor area above the administration area is the living Quarters and support facilities for volunteer fire fighters and Paid staff The extenoi of the facility was designed to serve as A focal point for the community II csF-ift c Don WatkmsPro/eat Architect POUDRE FIRE AUTHORITY ARCHITECTUAL AND ENG I NE ERING S E R V I C E S Bettwof Watkins Group, LLC A' ` h ' ' e ` ` ° ' e August 14, 2007 Planning Mr James B O'Neill, II City of Fort Collins — Purchasing Division I n t e r i o r s 215 North Mason Street Fort Collins, CO 80521 RE Poudre Fire Authority — Architectural Services Proposal No P-1080 Dear Mr O'Neill, Please accept this proposal as an expression of our interest in being considered to work with the City of Fort Collins and the Poudre Fire Authority Our interest in this project stems not only from our experience with fire stations specifically, but also because of our vast experience with remodel / addition projects, controlled maintenance projects and feasibility studies Tins flexibility and experience is critical for the diversity of services that will be required in the open-ended, architectural and engineering services contract anticipated We would welcome your contact with any of our Clients in tlus regard Belford Watkins Group's extensive involvement with facilities where input from numerous committees is required has facilitated our ability to listen to our Clients and incorporate their ideas in our design solutions This ability, combined with our understanding of the design elements that must be considered when constructing a fire station, results in a facilities that are functional, efficient and durable We pride ourselves on being responsive to our Clients throughout the design and construction process Towards this end we provide a design team with a single manager who will be involved throughout the project We also maintain rigorous commumcations to set goals and document decisions We area local firm and easily accessible Additionally, we have a proven track record of being able to work we] I with contractors to provide solutions and feedback at the time in the design process when responsiveness is so critical We look forward to an opportunity to further discuss now we can contribute to the success of your project Si cerely, 2121 MdymM Drive Don Watkins Suite 303 Fort Collins CO 80525 Ph 9704070070 Pm 970 40 71011 C l i e n t P r o I e c t Cost R e l e v a n c e a Client P r o 1 e c t Cost R e l e v a n c e SECTION It North Metro Fire Rescue District Station #64 Thorton, Colorado $800,000 Renovation and Addition An addition to and remodel of the existing building has provided updated and enlarged dayroom, dining, kitchen, and office facilities, and also Replaced dorm -style bunk I ooms The addition also Includes separate office space for Fire Prevention Don Watkins -Project Architect Castle Pines North Metro District Castle Pines, Colorado $600, 000 New Facility The Castle Pines Metropolitan District office and maintenance facility is located near an upscale residential community To keep the massing of the building residential in scale, the facility is divided into two buildings The maintenance yard is screened from the surrounding roadways by being located between two buildings The design of the facility respects that of the exclusive Castle Pines Subdivision Don Watkins - Project Architect POUD RE F 1 RE AUTHOR ITV ARCH ITECTUAL AND ENGI NEER ING S E R V I C E S Bellord Watkins Group LLC SECTION 4 Other Relevant Fire Station/Municipal Projects North Metro Fire Rescue District renovation of Stations #61, 63 and 65 City of Golden Fire Station #4 Bancroft Fire Department Station #3 Castlewood/South Metro Fue District renovation to Stations #35 and 36 Wheat Ridge Police Department addition and renovation POUDRE FIRE AUTHORITY ARCH I T E C T U A L AND ENGINEERING S E R V I C E S Belford Watkins Group, LLC SECTION 4 References Client City of Loveland Fire Department Live Fire Training Prop Loveland Colorado Reference Ken Cooper — 970/962-2635 Chief Mike Charo — 970/962-2808 Client Union Colony Fire/Rescue Authority Fire Station #3 and #7 Greeley, Colorado Reference Chief Doug Forsman— 970/350-9515 Lieutenant Ron Adams — 970/304-3433 (Pager) Client Poudre School District Various remodels and additions Fort Collins, Colorado Reference Ed Holder — 970/490-3412 Client North Metro Fire Rescue District North Metro Fire Rescue District Stations #66, 63, 68, 6L 65 and 64 Broomfield and Northglenn, Colorado Reference Fire Chief John O'Hayre — 303/452-9910 Client Nederland Fire Station Nederland, Colorado Reference Rick Dirr — 303/259-9161 Client Castlewood Fire Protection District Castlewood Fire Stations #35, 36 and 37 Remodels Littleton, Colorado Reference Chief Frank Young — 303/773-8282 POUDRE FIRE AUTHORITY ARCHITECTUAL AND ENGINEERING S E R V I C E S Belford Watkins Group LLC INTCRWEOi CON ULTING GROUP INTERWEST CONSULTING GROUP REPRESENTATIVE PROJECT EXPERIENCE Commercial Development Fort Collins Police Services Facility* — Fort Collins, Colorado (Humphnes-Poli) Seven Generations Office Park* — Fort Collins, Colorado (Seven Generations, LLC) Pioneer Charter School* - Fort Collins, Colorado (Architecture West) Huron Street Library* - Thornton, Colorado (Humphnes-Poll) Wright Farm Library* - Thornton, Colorado (Humphries -Poll) Preston Center - Fort Collins, Colorado (Western Property Advisors) Harmony Technology Park - Fort Collins, Colorado (Hewlett Packard) Timberline Center — Fort Collins, Colorado (Timberline Development, LLC) The Village at St Michael's — Greeley, Colorado (Thorp Associates) Thunder Mountain Harley Davidson Complex, Loveland, Colorado (Thorp Associate) Residential Development Rigden Farm - Fort Collins, Colorado (Wheeler Commercial) Preston Center — Fort Collins, Colorado (Bnsben Development) Seven Lakes Subdivision - Loveland, Colorado (Glen Properties) T-Bone Ranch — Greeley, Colorado (Sovereign Homes) 3120 Broadway — Boulder, Colorado (Boulder Housing Partners) Foothills Community - Boulder, Colorado (Boulder Housing Partners) Transportation Design (Private) Timberline/Drake Roadway Improvements at Rigden Farm - Fort Collins, Colorado (Wheeler Commercial) Ziegler Roadway Widening at Preston Center - Fort Collins, Colorado (Western Property Advisors) Municipal Services Downtown Enhancement Project - Fort Collins, Colorado Kechter — Ziegler Roundabout - Fort Collins, Colorado Timberline Road - Fort Collins, Colorado Eisenhower Boulevard (US Highway 34) - Loveland, Colorado I-70 at Hidden Valley - East of Idaho Springs, Colorado (CDOT) Walnut Street Improvements - Boulder, Colorado Plan Review — Elk Grove and Livingston, California, Mead, Colorado * Indicates LEED project kNuff LLccrwCc- E c cMe, ,5S7 West 19th SUcet C,reeleN, Colo,ado 50634 FIRE STATION PROJECTS UNION COLONY FIRE RESCUE STATION #3 2006 NORTH METRO FIRE STATION #66 2004 FIRE STATION #6, LOVELAND 2004 NEW EATON FIRE STATION 2003 FIRE STA FION NO I4, FT COLLINS 2002 WINDSOR/SEVERANCE FIRE STATION 2002 UNION COLONY FIRE RESCUE STATION #7 2002 LA SALLE FIRE STATION 200I LAFAYETTE FIRE STATION I999 FIRE STATION #5 LOVELAND I998 FIRE STATION # I2 FT. COLLINS I998 SPRING CANYON FIRE STATION I997 NORTH METRO FIRE RESCUE AUTHORITY I996 BANCROFT FIRE STATION #3 I994 FIRE STATION #I0 FT COLLINS I993 WEST ADAMS CO FIRE PROTECTION DIST I992 ADAMS COUNTY AIRPORT FIRE STATION I990 ADAMS CO FIRE STATION I990 do AL Atisxx rA IF', UNION COLONY FIRE STATION #3 - Greeley, CO 11,000 Total Square Feet Forced Air HVAC System Vehicle Exhaust System Currently Under Construction LOVELAND FIRE STATION #6 - Loveland, CO 10,000 Total Square Feet Forced Air HVAC System Vehicle Exhaust System Garage Make -Up Air/Exhaust System Completed in 2004 EA1 ON FIRE STATION #1 - Eaton, CO 16,000 Total Square Feet Forced Air HVAC System Vehicle Exhaust System Garage Make -Up Air/Exhaust Syslem Completed in 2003 BLACK FOREST FIRE STATION • Black Forest, CO 17,000 Total Square Feet Forced Air HVAC System Vehicle Exhaust System Compressed Air Systems Completed in 2003 LAFAYETTE FIRE STATION, Lafayette, CO TRI-LAKES FIRE STATION - Monument, CO 12,500 Total Square Feet 9,000 Total Square Feet Forced An HVAC System Packaged Rooftop Units Vehicle Exhaust System Vehicle Exhaust System Garage Make -Up An/Exhaust System Garage Make -Up Air I Exhaust System Completed in 1999 Completed in 1999 CASTLEWOOD FIRE STATION #35 -Arapahoe County, CO Remodel of Existing Fire Station Forced Air HVAC System Completed in 1998 C UanUaMProllnfolMumcipal Prolectslfire stations Bishton wpd do A ASSOCIA I LS UNION COLONY CIVIC CENTER Greeley, Colorado 65,000 sf complex with two performing arts theaters Monfort Concert Hall has 1,700 seats Hensel PhelpsTheater has 250 seats LOVELAND POLICE AND COURTS BUILDING Loveland, Colorado Two-story government office complex 96,000 sf plus partial basement Lanmer County courtrooms Medium secunty facility GREELEY POLICE HEADQUARTERS Greeley, Colorado 77,000 sf government complex Gym, laboratory, evidence storage, narcotics lock -down, interview rooms and offices OTHER NOTABLE PROJECTS Lanmer County Detention Facility, Ft Collins, Colorado Island Grove Treatment Center, Greeley, Colorado P B Roche Memorial Facility, Greeley, Colorado Athletic Club, Ft Collins, Colorado Eaton Fire Station, Eaton, Colorado Pueblo County Public Works, Pueblo, Colorado Department of Social Services, Pueblo, Colorado Lanmer County Alternate Sentencing Unit, Ft. Collins, Colorado C Uan\Jan\Projanfo\Municrpal Projects\Municipal Hauscr B&G Club No Text SECTION I Statement of Qualifications Capabilities of Firm Belford Watkins Group is a full -service architectural firm that brings to your protect a wealth of experience and a team of professionals who are committed to excellence in design solutions and superior quality of service The professionals at Belford Watkins Group have successfully completed over 130 projects locally and nationally As former partners in large firms with offices in multiple states, we have intentionally organized a smaller practice and limited the number of projects we work on each year This has allowed us to be intimately involved with each of our protects In the larger practices, we have found that senior experienced persons become predominately administrators and marketers Almost all of our protects are public facilities including fire stations, schools, community centers, university buildings, and churches Five technical persons make up this office Both Mark Belford and Don Watkins are licensed in Colorado and each have over 28 years experience Assigned Personnel Belford Watkins Group Don Watkins will be the principal in charge and protect manager for all new and renovation protects Don Watkins offers an in- depth history with fire station protects Mark Belford will assist in design for protects and be in charge of quality control Patti Watkins will be in charge of protect coordination and interior design Consistent with Belford Watkins Group's philosophy of client satisfaction and quality control, this team would be in place from earliest design efforts through the end of construction to provide consistency and continuity Consultants Ron Lindburg-CSE Consultants - will be the principal structural engineer Robert Almirall — Interwest Consulting Group - will be the principal civil engineer and assist with planning submittals Ron Boone — RJ McNutt and Associates - will be the principal electrical and lighting engineer Alicia Thorpe — AE Associates — will be the principal mechanical engineer POUCRE FIRE AUTHORITY - ARCHITECTURAL8 ENGINEERING S E R V I C E S Belford watkms Group LLC Education Registration Experience SECTION I Resumes Don Watkins -Principal, Project Manager BA Architecture, Arizona State University Registered Architect in Colorado, AIIA Member NCARB registration With over 25 years experience, Don Watkins has developed a reputation for his multi- discipline approach to project management, design and coordination in all phases of the built environment As an architect, he has a wide range of experience with both publicly and privately funded projects Don's experience includes a broad collection of different types and sizes of projects which include renovations, additions and new facilities He has varied experience in working with owners from programming through construction close-out Don has recently left a partnership in a Denver based firm to establish a new practice in Fort Collins Dons' career has been characterized by the ability to deliver complete, quality projects on time and within budget • Loveland Live Burn Prop, Loveland, Colorado • Union Colony Fire Rescue Authority Station #3, Greeley, Colorado • Union Colony Fire Rescue Authority Station #7, Greeley, Colorado • NMFRD Station #66, Broomfield, Coloi ado • Nederland Fire Station, Nederland, Colorado • Jefferson County Airport Station, North Metro Fire Rescue District (NMFRD), Jefferson County, Colorado • NMFRD Station #64, Addition and Remodel, Broomfield, Colorado • Castlewood Fire Stations #35, #36 & #37, Englewood, Colorado • Castle Pines Metropolitan District, Offices and Maintenance Facility, Castle Rock, Colorado • Wheat Ridge Police Department Addition and Remodel, Wheat Ridge, Colorado • Bancroft Fire Station #3, Jefferson County, Colorado • Golden Fire Station #4, Golden, Colorado • West Adams County Fire Protection District Station Remodels, Northglenn and Broomfield, Colorado • Werner Enterprises Phoenux Trucking Terminal, Phoenix, Arizona • Northglenn Dodge Service Center, Northglenn, Colorado • Werner Enterprises Denver Trucking Terminal, Adams County, Colorado • Grease Monkey, Broomfield, Colorado POUDRE FIRE AUTHOR ITY -ARCHITECTURAL & ENGINEERING S E R V I C E S Belford Watkins Group, LLC SECTION I Mark S. Belford - Principal, Project Architect Ed u c a t i o n Bachelor of Architecture, Kansas State University R e g i s t r a t i o n Registered Architect in Colorado, AIA Member, NCARB Registration E x p e r i e n c e Mark Belford has a great deal of experience with K-12 schools, university protects, recreation centers and religious education protects Most of his work has been in the public sector Mark recently left as partner in a practice in the Lawrence/Kansas City area and has recently started a practice in Colorado Projects Mark has been responsible include • Fletcher Elementary School Addition & Renovation, Aurora, CO • Our Lady Of Peace Church Renovation Master Plan, Greeley, CO • Cherryvale High School Addition 8, Renovation, Cherryvale, KS • Lincoln Elementary Addition & Renovation, Cherry vale, KS • Pinckney Elementary Addition & Renovation, Lawrence, KS • Free State High School Addition, Lawrence, KS • Centennial Elementary Addition & Renovation, Lawrence, KS • New York Elementary School Addition & Renovation, Lawrence, KS • Mesa County Courthouse Renovation, Grand Junction, CO • Sunflower Elementary School, Lawrence, KS • Bear Creek K-8 School, Lakewood, CO • Kansas Memorial Union Renovation, University Of Kansas • Dyche Museum Addition & Renovation, University of Kansas • Willard Hall Renovation, Pittsburg State University • Good Samaritan Addition & Renovation, Fort Collins, CO • Corpus Christi Catholic Church & School, Lawrence, KS • Saint John Church Addition & Renovation, Lawrence, KS • Baldwin Junior High Addition & Renovation, Baldwin, KS • Usher Mansion Renovation & Addition, Lawrence, KS • Spahr Hall Addition & Renovation, University of Kansas • Lawrence Chamber of Commerce Renovation, Lawrence, KS • Broken Arrow Elementary School Addition & Renovation, Lawrence, KS • Bell Hall Renovation, Fort Leavenworth, Kansas • Redeemer Lutheran Church & School, Fort Collins, CO POUDRE FIRE AUTHORITY -ARCH ITECTURAL & ENGINEERING S E R V I C E S Belford Watkins Group LLC RON L. LiNDBURG, P.E. CSE Consultants • 817 E Lineolnway • Cheyenne, WY 82001 • Telephone 307-634-1701 CSE Consultants • 4710 S College Avenue • Fort Collins, CO 80525 • Telephone 970-282-8005 EDUCATION UNIVhRSI I Y Of WYOMING B S degree in Civil Engineering (Architectural option), I986 PROFESSIONAL EXPERIENCE CSE Consultants - Structural Engineering, Cheyenne, Wyoming & Fort Collins, Colorado Project Manager & Owner, 2003 - present Structural Engineer - schematic design, design development, contract documents and contract administration for commercial construction and custom residential construction Engineer of Record for Projects including United Way Housing Services Center Fort'Collins, Colorado UW Plaza - Buildings 3 &4 Laramie, Wyoming Good Samaritan - Six Bed Addition Fort Collins, Colorado East High School Phase II Cheyenne, Wyoming Suncor Energy Gurnsev & Cheyenne, Wyoming Lundvall Office Building Greeley, Colorado Avanti Business Complex Cheyenne, Wyoming Clothes Pony Remodel Fort Collins, Colorado Odell Brewing Company Addition Fort Collins, Colorado WHIP Flex Warehouse Windsor, Colorado Livermore Elementary Addition Livermore, Colorado Shepardson Elementary Addition Fort Collins, Colorado Peterson Specialty Products Loveland, Colorado Heschel Street '16' Townhomes Fort Collins, Colorado Good Samaritan -Therapy Addition Loveland, Colorado Valley Steel & Wire Company Fort Collins, Colorado Jorgenson Laboratories Warehouse Loveland, Colorado Ballyneal Golf and Hunt Club Yuma, Colorado Milliken Housing Project Milliken, Colorado Dunn Elementary Addition Fort Collins, Colorado East High School Phase I & IIA Cheyenne, Wyoming WyeaTech Diesel Shop Laramie, Wyoming Arena Sports Indoor Soccer Arena Windsor, Colorado Blackstone C C Pump House Aurora, Colorado Lanterl Office Buildings Fort Collins, Colorado Timberline Terrace Office Building Fort Collins, Colorado Markley Motors Renovations Fort Collins, Colorado River Bend Business Park Laramie, Wyoming Sunstone Office Buildings Fort Collins, Colorado IVA, INC , Ft Collins, Colorado Project Engineer, 1997 - 2004 Project structural engineer - schematic design, design development, contract documents and contract administration for structures including schools, churches, theaters, hospitals, offices and other commercial buildings Structural systems utilizing reinforced masonry, steel framing, wood framing, structural insulated panels, insulated concrete forms and pre- engineered metal buildings Multiplex theater projects in seismic zones 3 and 4 Engineer of Record or Project Engineer for Projects including Coloradoan Office Building Fort Collins, Colorado Skyline Center for Health Loveland, Colorado Fossil Ridge High School Fort Collins, Colorado The Winslow Retirement Village Fort Collins, Colorado Palmer Design Center Fort Collins, Colorado Loveland Good Samaritan Kitchen Loveland, Colorado Resurrection Fellowship Church Loveland, Colorado Cool River Wine & Spirits Cheyenne, Wyoming Mountain View High School Loveland, Colorado Centennial Bank Bennett Elementary Addition Rffenburgh Elementary Addition Union Colony Fire Station #7 Our Saviours Lutheran Church The Lodge at Miramont National Wildlife Research Center Norlarco Credit Union Mountain View Swimming Pool Park Meadows Medical Office Planet Hyundai "'heat Ridge High School Additions McCovs Restaurant Livermore Elementary Addition Nrwot High School Addition Rental Cite St Johns United Church Addition Buena Vista Elementary Metro 12 Movie Theatre Metro 16 Movie Theatre Estes Park Birthing Suite Fort Collins/Windsor, Colorado Fort Collins, Colorado Fort Collins, Colorado Greeley, Colorado Greeley, Colorado Fort Collins, Colorado Fort Collins, Colorado Fort Collins, Colorado Loveland, Colorado Lone Tree, Colorado Golden, Colorado Wheat Ridge, Colorado Fort Collins, Colorado Livermore, Colorado Niwot, Colorado Longmont, Colorado Greeley, Colorado Buena Vista, Colorado Calearco, California Rancho Mirage, California Estes Park, Colorado TERRACON CONSULTANTS WESTERN, INC, Ft Collins, Colorado Protect Engineer, 1993 - 1997 Responsible for the structural design of custom and multifamily residential, commercial buildings, and earth retaining systems Field observation services for construction relating to earthwork, foundation, concrete, timber, masonry and steel construction Prepared geotechnrcal engineering reports for residential and commercial development EMPIRE LABORATORIES, INC, Ft Collins, Colorado Staff Engineer, 1986 - 1993 Staff engineer working in the disciplines of geotechnrcal, materials and structural engineering Supervised subsurface drilling investigations, conducted geotechnral laboratory tests, and developed asphaltic and Portland cement concrete mix designs Field engineering work involving the observation of earthwork, utility and budding construction Supervised drilled pier construction and conducted special inspection of masonry construction for shopping centers, parking garages, hospitals, schools, and athletic facilities Evaluated field and laboratory soils data and prepared geotechnrcal engineering reports for residential and commercial development Structural design of custom homes, office buildings and foundation systems for pre-engineered metal buildings PROFESSIONAL REGISTRATION Registered Professional Engineer Colorado, Wvommg Licensed !teal Estate Broker Colorado V INTIRWRBT CO N Sb LTI NG GROUP ROBERT ALMIRALL, PE EDUCATION/REGISTRATIONS BS / Civil Engineering / Virginia Tech / 1986 1999/Professional Engineer / Colorado, No 33441 1991 / Professional Engineer / Virginia, No 021882 PROFESSIONAL EXPERIENCE Mr Pdmirall has 21 years of experience providing general civil engineering and client support services His experience includes the design, project management and oversight of public and private land development projects in Virginia, California and Colorado These have included residential, commercial, and industrial site developments, roadway designs, watershed analyses, grading and drainage plans, storm sewer and stormwater management plans, erosion and sedimentation control plans, sanitary and water main system design, flood plain studies, and site layouts Prior to joining lnterwest Consulting Group, Pvlr Almirall was a Project Manager, Division Manager and most recently the Director of Operations for a Fort Collins, Colorado office of a statewide engineering firm, Director of Engineering for a 25 person land development firm in Manassas, Virginia, a partner and Vice President in his own firm in Fairfax, Virginia, and a Design Engineer for a statewide; engineering and planning firm based out of Northern Virginia. As a Project Manager, Mr Almirall has been responsible for the design, quality control and processing of numerous entitlement and land development projects These have included Annexation and Rezoning applications, Municipal projects and private land development designs Mr Almirall is dedicated to client satisfaction through his commitment to responsiveness, attention to detail, budget management and strong communication skills PROJECT EXPERIENCE Fort Collins Police Services Facility — Fort Colliuis, Colorado Project Manager for the City of Fort Collins Police Facility on Timberline Road This project included the grading and utility design as well as the LEED certifications required for the proposed site construction Through a sep.rrate contract with the City Engineering Department, the design of rimberlme Road adjacent to the site was also integral to the projects success