HomeMy WebLinkAboutWORK ORDER - RFP - P677 FUTURE SW W & WW FACILITY IMPROVEMENTS, , I ",< '-
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
ROCKY MOUNTAIN CONSULTANTS, INC
DATED March 1, 2000
Work Order Number
Purchase Order Number qq (7 3,3q
Project Title Rodeo Detention Pond Facility
Commencement Date March 1 2000
Completion Date _ October 1 2000
Maximum Fee (time and reimbursable direct costs)
Project Description Provide resident engineering project coordination and geotechnical
services for the Rodeo Stormwater Detention Pond
Scope of Services See attached Exhibit A
Service Provider agrees to perform the services identified
above and on the attached forms in accordance with the CC Purchasing
terms and conditions contained herein and in the Services
Agreement between the parties In the event of a conflict
between or ambiguity in the terms of the Services
Agreement and this work order (including the attached
forms) the Services Agreement shall control
The attached forms consisting of Exhibits A, B, C and D,
(8) pages are hereby accepted and incorporated herein by
this reference, and Notice to Proceed is hereby given
O \FRONT OFF10ETt Whns%RodOi Pond\Work O,oer Fonn Exhibit A WN
Service Provider Rocky Mountain Consultants, Inc
Date ��-3 - 2 000
City of Fort C
Submitted By
Prole
Date
Reviewed By O`M44k X. IC-AC-'-1
Senior Utility Engineer
Date
Approved By N cl zt ''
Utilities General Manager
Date
Approved By
Dir P
Date
49b
D \FROM OFFICETt CoIMsV adeo Pond\Work ONer Form EMnbd A wN
'Z-
EXHIBIT A
CITY OF FORT COLLINS
RODEO STORMWATER DETENTION POND
PROJECT DESCRIPTION
A stormwater detention pond on the west side of Overland Trail on the south side of the Hughes Stadium
access road, including an outlet structure, 2 inlet structures, excavation of 330,000 cubic yards of earth
material, placement of 70,000 cubic yards of embankment for new parking area, and seeding
SCOPE OF SERVICES
PROJECT BIDDING AND CONTRACT AWARD
A General
Provide assistance during the pre -bid interval to generate bidding interest, aid prospective
bidders in fully understanding the scope of the project, and explaining any unusual or
significant features Following the bid opening, provide assistance in evaluating the bid
proposals and recommending award of contract Specific items of involvement will be as
follows
Coordinate protect advertisement
Conduct a pre -bid conference and job -walk with contractors and suppliers to
familiarize prospective bidders with actual site conditions or constraints
Respond to all contractor and supplier inquiries to provide more complete
understanding of the protect as required
Assist City in conducting the bid opening
Review bid proposals
Following review of proposals, provide City with a recommendation for Award of
Contract
PROJECT CONSTRUCTION
A RMC will establish a full understanding between the City, the Engineer, and the Contractor
regarding all aspects and responsibilities on the protect as soon as practical following award
of the contract Some of the major items to be established are as follows
1 Establish formal lines of communication
2 Review protect construction schedule and sequencing
3 Field offices and staging areas
4 Care and protection of private property
5 Weekly progress meetings
6 Quality control testing - bedding and other materials and compaction testing
7 OSHA regulations - competent person
8 Shop drawing submittals
B During the construction of the protect, RMC will use it's best efforts to, create a well
coordinated approach, minimize potential problems, and ensure a timely completion within
the protect budget RMC will provide a full time resident engineer to work with the City's
construction staff during the entire construction period RMC will provide the following
services
O\FROM OFFICE6t W hMNWeo 1un6Exhft A S.W W Se --wM Page 1
1 Provide basic horizontal and vertical control survey data
2 Review and approve shop drawing submittals
3 Review and observation of material handling and storage procedures
4 Review and observation of general construction procedures and compliance with
the Contract Documents
5 Conduct weekly progress meetings
6 Observation of excavation with respect to width, depth, stability of bottom, and
safety procedures (shoring)
7 Work closely with City staff and contractor to provide any special needs
8 Provide, observe, and coordinate geotechnical testing and compaction of
embankment
9 Observation and enforcement of placement of all ground surface materials such as
rip -rap, seeding and mulching, grading and disturbed landscaping
10 Review of partial pay requests and recommendation to City for payment to the
contractor
11 Assist in review and coordination of all change orders, if necessary
12 Monitor construction progress and schedule
13 Conduct final inspection/job walk in conjunction with City staff, and prepare a
"punchlist"
14 Prepare recommendation for establishing date of substantial completion, final job
acceptance and final payment to the contractor
15 Prepare 'record" reproducible drawings and furnish original drawings for
permanent record to the City
16 Prepare "As -Built" topographic survey of detention pond area (survey to elevation
5145) Input stage/storage data into modified SWMMhydraulic model todetermine
"As -Built" function of the detention pond Edit the drainage report to reflect "As -
Built" conditions
17 Prepare and provide precondition and construction photos in digit format with
written descriptions
O WROW OFFICE\F Whits%R dtl POW\E NbM-SmPe of 5e", e w Page 2
EXHIBIT B
WORK SCHEDULE
Completion Time
1 Bidding and construction
2 Project Bidding and Award Two months
3 Project Construction 5 months
36 Additional Permits and/or Approvals The Professional shall provide the necessary backup
material to the City for submission of additional permits and/or approvals as may be required for
completion of the project
37 Health and Safety Considerations Engineer will, under this Agreement, perform design of
facilities in accordance with prevailing safety codes
o FRONT OFFICETt EomnsVZMoo aor xfobiu swpe of Sew— Page 1 of 1
EXHIBIT D
COMPENSATION
Methods of Payment for Services and Expenses of Professional
1 1 Project Bidding and Construction Services City shall pay professional on an "hourly not -to -
exceed basis" a maximum amount of $110,012 00
Hourly Billing Rates of Project Team
Function Maximum Hourly Rate
Project Manager/Principal
$120
Project Engineer
$
95
Construction Engineer 1
$
60
CAD Tech 1
$
50
Clerical
$
40
Two -Man Survey Crew
$110
Registered Land Surveyor
$
65
1 2 Manner of Payment
1 2 1 Professional shall submit monthly statements City shall make prompt monthly payments
in response to Professional's approved monthly statements
1 2 2 The monthly statements submitted by Professional shall be paid on an hourly basis for
services completed through the Bidding and Construction Phase
1 2 3 Monthly payment to the Professional for satisfactory performance shall be made within
30 days after billing is received by City Carrying charges of 1-1 /2 percent per month or the
maximum rate allowed by law, if less, shall be due for accounts which are not paid within
60 days after the billing date Said carrying charge shall not apply to payments withheld by
the City upon default of the Professional or to insure performance
1 2 4 Upon satisfactory completion of any phase for which withholding has been instituted, the
withheld shall be promptly paid by the City to Professional Final payment shall be made
following acceptance of the work by the City, subject to statutory retentions for unresolved
claims
o TROW OFFICETt c 1105XRooeo Pona xmaw scone or se"Ims x Page 1 of
EXHIBIT D
RODEO DETENTION POND FACILITY
PROJECT MANHOURS AND COSTS
Project
Manager
Project
Engineer
CAD Tech I
2-Person
Survey Crew
Clerical
Construction
En sneer I
Terracon
Hourly Rate
$120 00
$65 00
$52 00
$110 00
$40 00
$60 00
L S
I PROJECT BIDDING AND CONTRACT AWARD
Provide assistance during the re -bid interval
16
32
Conduct a re -bid conference and lob -walk
8
6
Assist City in conducting the bid opening
6
8
Provide City with a recommendation for Award of Contract
4
4
VI PROJECT CONSTRUCTION
Review of shop drawi qg submittals
8
40
Monitor construction progress and schedule
-dailv
60
180
820
Provide observation -reports
80
System testing
32
$14,220 00
Prepare "record" reproducible drawings and project photos for permanent record to City
4
8
24
12
60
Prepare "as -built" Surve and h draulic model
4
16
12
$
TOTAL BIDDING & CONSTRUCTION HOURS
110
296
36
8
12
992
TOTAL BIDDING & CONSTRUCTION COSTS
$13,200 00
$19 240 00
$1,872 00
$880 00
$4110 00
$59,520 00
114,220 00
REPRODUCTION COSTS - $600 00
TOTAL CONSTRUCTION PHASE - $110 012 00
D \FRONT OFFICE\Ft Gollins\Rodeo Pond\Exhibit D-RodeoDetentionPondFacihty 2 wh2