Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESPONSE - BID - 5266 BORING HORIZONTAL (3)
J BID SCHEDULE Contractor must include all mobilization, labor, materials, equipment, profit and overhead for each bore Bore # 1 Light and Power Utility a) Location Trilby Road and Railroad Tracks (see attached drawing) b) Size 18 inch steel and 80 feet long c) This bore must be completed by April 15, 1998 $ 1 SS. e2 / linear foot X 80 feet = $ Total bid for Bore #1 Bore # 2 Light and Power Utility a) Location Sherwood and Railroad Tracks (see attached drawing) b) Size 12 inch steel and 60 feet long /linear foot X 60 feet = $ O� TOO• �� Total bid for Bore #2 Bore # 3 Water Utility a) Location Mason and Oak Streets (see attached drawings) b) Size 14 inch steel and 70 feet long $ ZOO. '-- / linear foot X 70 feet = $ /t ©OD.' Total bid for Bore #3 TOTAL BID FOR ALL BORES $ _SS' FIRM SIGN eIN, 2 ?4Z Fax Sent by KR SWEROFEGER A 0 17195479297, 03/26/98 8 33AM,JetraX #557,Page 1/1 K. R. SWERDFEGER CONSTRUCTION, INC. Office (719)547.0242 Pax (719)547-9297 421 East Induatnal Boulevard Pueblo West, Colorado 91007 Denver(303)791.3229 Albuquerque (505) 888-0632 REFERENCES FOR CASING BORES l# Remedial Solutions, Inc. Rick ABacleto 125' of 12" Casing at Anport Road in Ft. Collins. Completed 3/2/98 (970)593-1894 2# Moongate Water Jetf Giariano 3-16" Bores 185' Each in Las Cruees, NM (505)302-7001 Completed 1124/98 30 City of Trinidad Jim Fernandez 20" Bore 200' m'Fnmdad, CO. (719)846-9843