Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5266 BORING HORIZONTAL (2)BID SCHEDULE Contractor must include all mobilization, labor, materials, equipment, profit and overhead for each bore Bore # 1 Light and Power Utility a) Location Trilby Road and Railroad Tracks (see attached drawing) b) Size 18 inch steel and 80 feet long c) This bore must be completed by April 15, 1998 Z72, Gn / linear foot X 80 feet = $ -7— � 760, oo Total bid for Bore #1 Bore # 2 Light and Power Utility a) Location Sherwood and Railroad Tracks (see attached drawing) b) Size 12 inch steel and 60 feet long ZZR vo / linear foot X 60 feet = $ / 3 6!;'• oa Total bid for Bore #2 Bore # 3 Water Utility a) Location Mason and Oak Streets (see attached drawings) b) Size 14 inch steel and 70 feet long $ 3t(. 04 / linear foot X 70 feet = $ Z� 7 70• O rO Total bid for Bore #3 TOTAL BID FOR ALL BORES $ -S7, Z/a, X)a FIRM NAME &'Dole fir/'/ Sr4—cMy 60 SIGNATURE�/ _--- (3"3> ADDRESS 7 0� �" Y /A a3 Phone 273— c1 3 $Z P�03 Fax(3�J) Z73 935_�( TRAINOR CONSTRUCTION COMPANY 15000 W. 44th Avenue #8 Golden, CO 80403 Phone (303) 273-9382 Fax (303) 273-9354 3/24/98 Ft Collins Bid Proposal #5266 Clarifications based on phone discussions with Janet McTague and Tim McTague 1 Bore #2 may not be borable at a 12" diameter casing 2 Work on But a #1 does not have to be complete by Apt it 15, 1998 as stated, 3 Bores ai a intended to be constructed consecutively 4 Bore pits to be backfilled, compacted and paved by others 5 Survey to be by others 6. Watet carrier pipe to be supplied by the City 7, Waterline connections to be made by the City, including excavation of receiving pits Russ Iverson Trainor Constriction Co 'thy Co/b©� TRAINOR CONSTRUCTION COMPANY 15000 W 44th Avenue #8 Golden, CO 80403 Phone (303) 273-9382 Fax (303) 273-9354 3/24/98 Ft Collins Boring Bid References 1 Miller & Ridge Rd 24" Sanitary Sewer Bore - 12/19/97 Clear Creek Sanitation District c/o Lane En meermg 9500 W 14 Ave Lakewood, CO 80215 (303)233-4042 Attn Raj Lotfi - Proj Engineer 2 I-70 Business Loop & 29 Road 30" Sanitary Sewer Bore - 11/20/97 Central Grand Valley Water & Sanitation District c/o Westwater Engineering 2516 Foresight Circle #1 Grand Junction, CO 81505 (970)241-7076 Attn Kellle Knowles - Proj Engineer 3 Santa Fe & Bellevrew 36" Water line Bore - 2/4/98 CDOT (303)798-7664 Attn Ron Buck - Proj Engineer