HomeMy WebLinkAboutCORRESPONDENCE - BID - 5276 TRAFFIC CONTROLAdminist ve Services is
Purchasing Division
City of Fort Collins
MAY 2 9 2001
May 22, 2001
Traffic Masters, Inc
2832 E Mulberry
Ft Collins, CO 80524
Re Bid #5276 Traffic Control
The City of Fort Collins has elected to renew Bid #5276 Traffic Control for the City of Fort
Collins with your firm The terms and conditions of this renewal will be the same as stated in the
original bid documents with 5% increases to the 2000 Bid Schedule "A" as shown on the
attached 2001 Bid Schedule "A", and including an increase in response time from 30 minutes to
45 minutes
If the renewal is acceptable to your firm, please sign this letter and the attachment in the space
provided and return along with a current copy of your insurance to the City of Fort Collins,
Purchasing Division, 256 W Mountain, Fort Collins, CO 80521, before June 4, 2001
If this renewal is not acceptable with your firm, please send us a written notice stating that you
do not wish to renew the bid If you have any questions regarding this renewal, please contact
John Stephen, CPPB, Buyer, at 970-221-6777
Sincerely,
C
amer II, CPPO,
Dtrecasing and Risk Management
Signature Date
(Please indicate your desire to renew Bid #5276 by signing this letter and returning it with a
current copy of insurance forms to Purchasing Division on or before June 4, 2001 )
256 W Mountain Avenue • PO Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
Bid Schedule " A " Including 5% Price Increase for 2001
Contractor to provide all service, manpower and equipment
Traffic Control Supervisor (at job site)
$
3244
per hour
Traffic Control Supervisor (at job site)
$324 45
per day
Flag Person with paddle
$
1730
per hour
Flag Person with paddle
$173 04
per day
36" Reflectorized Tube
$
69
per day per unit
Vertical Panel without light
$
82
per day per unit
Type I Barricade without light
$
82
per day per unit
Type II Barricade without light
$
82
per day per unit
Type III Barricade without lights
$
378
per day per unit
Light - Steady Burn
$
36
per day per each
Light - Flashing
$
36
per day per each
Barrels
$
1 16
per day per unit
Size A Sign with stand
$
1 35
per day per set
Size A Sign without stand
$
1 16
per day per set
Size B Sign with stand
$
1 53
per day per set
Size B Sign without stand
$
1 35
per day per set
No Parking Sign with stand
$
1 35
per day per unit
Specialty Sign Size A -Cost of Manufacturing
$
7053
per sign
Specialty Sign Size B-Cost of Manufacturing
$
8228
per sign
28" Cone with reflective strip
$
64
per day per cone
36" Cone with reflective strip
$
74
per day per cone
Safety Fence
$
500
per day per roll
Light - Steady Burn
$
36
per day per unit
Light - Flashing
$
36
per day per unit
Arrow Board
$
7636
per day per unit
Type IV Barrier -Jersey Barrier
$
11 77
per day per unit
Size A Signs - 0 01 to 9 00 Square Feet
Size B Signs - 9 01 to 16 00 Square Feet
Specialty Signs - The initial manufacturing will be paid for per the unit cost for specialty signs and the rental
rate paid per the appropriate rental rate
Firm Name Tdr1flc_Con
l�
Signature /�����,,""""""cc((//CC
Date 2 3 m V} y p
MAY-25-2001 FRI 09:59 AN FLOOD PETERSON
FAX N0, 7209777113
P. 01
AGQB& CERTIFI TE OF LIABILITY
PRODUCER THIS C
Flood & Peterson Insurance Inc ONLY
DATE (MWOOWYV)
05/25/01
93S1 Grant Street, Suite 600 HOLDER THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Denver, CO 80229 720 977-7110 INSURERS AFFORDING COVERAGE
TBRAFFIC MASTERS, INC. INSURER♦ EMC Insurance Col -any
INSURERS Re_llance_NatiOnal Insurance _
2832 E. MULBERRY INSURER
FORT COLLINS, CO 80524 INSURER
INSURER E
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING
ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTTICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POUGES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES AGGREGATE LIMITS SHOWN_ MAY HAVE BEEN REDUCED BY PAID CLAIMS
L% TYPE OF INSURANCE POLICY NUMBER POLICYEFECYVE POWDRINYI 4CY E%PIMTON LIMITS
A
GENERAL LIABILITY
1D45067
OS/09/01
05/09/02
EACH OCCURRENCE
$1.000.000
X COMMERCIALGENERAL LLOB ILIT'
AREDAMAGE(AAYPnafl.)
1100,01)0
"INS MADE I (�AJ OCCUR
ME0 ex? (Any ono PFfsor,
$5 , O O 0__ _
_
PERSONAL A ADV INJURY
El 000,000
GENERAL AGGREGATE
$2 , O 0 0_ Q 0 0
GEN1 AGGREGATE LIMMAPPLES PER
PRODUCTS •COMPA)PAGG
$2, 000,000
POLICY PRO.LOC
—
AUTOMOBILE
U"1UTY
COMBINEDSINGLE LMIT
$
ANY AUTO
{EA aedmml
ALL OWNED AUTOS
BODILY INJURY
i
SCHEDULED AUTOS
(Par pmonl
HIRED AUTOS
tI
NONOWNE) ALTOS
BODILY INJURY
(PA, ApciQBnl)
$
---111
--I
_ -}-
Y PE PRORTTDAMAGE
PR(PaOPERTY
f
w,a
GARAGE LIABILITY
AUTOCNLV EAACCIDENT
S___
ANY AUTO
OTHERTHAN EA ACC
_
S
AUTO ONLY ASS
S
EKOESS
UABILRY
EACH_OCCURRENCE
S
_
_ --
OCCUR Li CLAMS MADE
AGGREGATE
S
S
_
DEDUCTIBLE
S
RETENTION S
S
B
WORRIERS COMPENSATION AND
NWX6005549
06/01/00
06/01/01
X w STATLL OTH
EMPLOYERS` IJA&LITY
E L EACH ACCIDENT
a 10 0, 0 0 0
EL DISEASE EA EAPL OYEE
S1001 000
EL DISEASE POUCY UNIT
5500 000
OTHER
DESCRIPTION OF OPERATIONSAACATIONSMEHICLES/EXCLUSIONS ADDED BY ENDONSEMENTISPECIAL PRDVIBIDNS
City of Fort Collins
Attn: Purchasing Dept.
256 West Mountain
Port Collins, CO 80521
of 2 #S18586
SHOULD ANVOFTNE ABOVEDESCRIBEO POUCIESBE CANCELLED BEFORE THE EXPIRATION
DATE TNEAEOF, THE ISSUING INSURER WILL ENDEAYOR TOMAIL I,O—OAYSWRITTEN
NOTICETOTHE CERRFICATE HOLDERNAMEOTOTHE LEFT, BUTFALURE TOPOSOSNALL
IMPOSE NO OBIIGATION OR LIAR IUTY OF ANY IONO UPON THE INSURERdT3 AGENTS OR
DLH o
J
Is"
C
AdministirlWe Services
Purchasing Division
May 22, 2001
Traffic Masters, Inc
2832 E Mulberry, Inc
Ft Collins, CO 80524
Re Bid #5276 Traffic Control
The City of Fort Collins has elected to renew Bid #5276 Traffic Control for the City of Fort
Collins with your firm The terms and conditions of this renewal will be the same as stated in the
original bid documents with 5% increases to the 2000 Bid Schedule "A" as shown on the
attached 2001 Bid Schedule "A", and including an increase in response time from 30 minutes to
45 minutes
If the renewal is acceptable to your firm, please sign this letter and the attachment in the space
provided and return along with a current copy of your insurance to the City of Fort Collins,
Purchasing Division, 256 W Mountain, Fort Collins, CO 80521, before June 4, 2001
If this renewal is not acceptable with your firm, please send us a written notice stating that you
do not wish to renew the bid If you have any questions regarding this renewal, please contact
John Stephen, CPPB, Buyer, at 970-221-6777
Sincerely,
v � (�
� me B O'Netll Il, CPPO,
Dtrec or of Purchasing and Risk Management
Signature
Date
(Please indicate your desire to renew Bid #5276 by signing this letter and returning it with a
current copy of insurance forms to Purchasing Division on or before June 4, 2001 )
256 W Mountain Avenue • PO Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
Bid Schedule " A " Including 5% Price Increase for 2001
Contractor to provide all service, manpower and equipment
Traffic Control Supervisor (at job site)
$
3244
per hour
Traffic Control Supervisor (at job site)
$324 45
per day
Flag Person with paddle
$
1730
per hour
Flag Person with paddle
$173
04
per day
36" Reflectorized Tube
$
69
per day per unit
Vertical Panel without light
$
82
per day per unit
Type I Barricade without light
$
82
per day per unit
Type II Barricade without light
$
82
per day per unit
Type III Barricade without lights
$
378
per day per unit
Light - Steady Burn
$
36
per day per each
Light - Flashing
$
36
per day per each
Barrels
$
1 16
per day per unit
Size A Sign with stand
$
1 35
per day per set
Size A Sign without stand
$
1 16
per day per set
Size B Sign with stand
$
1 53
per day per set
Size B Sign without stand
$
1 35
per day per set
No Parking Sign with stand
$
1 35
per day per unit
Specialty Sign Size A -Cost of Manufacturing
$
7053
per sign
Specialty Sign Size B-Cost of Manufacturing
$
8228
per sign
28" Cone with reflective strip
$
64
per day per cone
36" Cone with reflective strip
$
74
per day per cone
Safety Fence
$
500
per day per roll
Light - Steady Burn
$
36
per day per unit
Light - Flashing
$
36
per day per unit
Arrow Board
$
7636
per day per unit
Type IV Barrier -Jersey Barrier
$
11 77
per day per unit
Size A Signs - 0 01 to 9 00 Square Feet
Size B Signs - 9 01 to 16 00 Square Feet
Specialty Signs - The initial manufacturing will be paid for per the unit cost for specialty signs and the rental
rate paid per the appropriate rental rate
Firm Name Traffic Control
Signature
Date
r
" Bid Schedule " A "
Contractor to provide all service, manpower and equipment
5 ;
3 -� 44
Traffic Control Supervisor (at job site)
$
30 96
per r
s
Traffic Control Supervisor (at job site)
$309
00°I5�—per
day-- 3z
Flag Person with paddle
$
16 48 ,g2 =
per hour-/7 3D
Flag Person with paddle
$16480AF-2q_perday- /93.0`/
36" Reflectorized Tube
$
664,t3 =
per day per unit-•� 9
Vertical Panel without light
$
78�,,4 =
per day per unit- , SZ
Type I Barricade without light
$
78 A ov =
per day per unit- $ L
Type II Barricade without light
$
78 "
per day per unit - 3
Type III Barricade without lights
$
3 60- IK
per day per unit- 3 7S
Light - Steady Burn
$
341-a2-
per day per each - , 3(-
Light - Flashing
$
34 F --
per day per each- 3(p
Barrels
$
1 11 r a
per day per unit - G 4
Size A Sign with stand
$
1 29r ob
per day per set - / 3S
Size A Sign without stand
$
1 11,
per day per set —/ ii,
Size B Sign with stand
$
1 46r .o-7
per day per set -/ ss
Size B Sign without stand
$
1 29+ c6
per day per set- / ss
No Parking Sign with stand
$
1 29t ab
per day per unit-( js
Specialty Sign Size A -Cost of Manufacturing
$
67 17-f3 36
per sign - 70,5-3
Specialty Sign Size B-Cost of Manufacturing
$
78 36r3,9�
per sign -8.z ' g
28" Cone with reflective strip
$
61, o s
per day per cone , 0
36" Cone with reflective strip
$
71 -)3
per day per cone • "7�1
Safety Fence
$
4 764.14
per day per roll .5. ov
Light - Steady Burn
$
34f-Alper
day per unit .gm
Light - Flashing
$
34 0 zo
per day per unit • -46
Arrow Board
$
72 763 �
per day per unit�76.36
Type IV Barrier -Jersey Barrier $ 11 21 r,SG per day per unit 11.9 i
Size A Signs - 0 01 to 9 00 Square Feet
Size B Signs - 9 01 to 16 00 Square Feet
Specialty Signs - The initial manufacturing will be paid for per the unit cost for specialty signs and the rental
rate paid per the appropriate rental rate
Spa fl'✓`r�p- �� �
Firm Name Tra Control
Signature
Signature ��
Date S 4 Al 0