HomeMy WebLinkAboutRESPONSE - BID - 6062 LEMAY RIGHT TURN LANE AT MULBERRY 31218NrR��roRe
C cv of �ovr Co s
2 s blowny M{i`.v�N T
CO
I
it �Tw�97,d�SLcrf��
-6o
�M* JOPM
I�
700-70010
F/A Minor Contract Revisions
FA
1
700-70016
F/A Fuel Cost Adjustment
FA
1
700-70021
F/A On -The -Job Trainee
0
700-70022
F/A OJT Colorado Tr m
FA
1
700-7038
osion Control
FA
1
Total Cost
Total Cost in Words:
9. PRICES
Dollars
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or change quantities at his sole discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twenty-five percent (25%) of the total Agreement Price.
10. ACCEPTANCE OF FUEL COST ADJUSTMENTS:
Bidders have the option to accept Fuel Cost Adjustments in accordance
with the Revision of Section 109 - Fuel Cost Adjustment. To accept this
standard special provision, the bidder must fill in an "X" next to "YES"
below. No Fuel Cost Adjustment will be made due to fuel cost changes for
bidders who answer "NO". If neither line is marked, the Department will
assume the bidder rejects Fuel Cost Adjustments for this project. After
bids are submitted, bidders will not be given any other opportunity to
accept or reject this adjustment.
(Mark only one line with an "X"):
YES, I choose to accept Fuel Cost Adjustments for this project
X NO, I choose NOT to accept Fuel Cost Adjustments for this project
(if neither line is marked, the default is "NO", I choose NOT to accept
Fuel Cost Adjustments for this project
7/96 Section 00300 Page 3
RESPECTFULLY SUBMITTED:
At L Corx 2c�� NC
CONTRACTOR
BY:
V 1
Title
License Number (If Applicable)
if Bid is by corporation)
A ` aaaress
J Telephone
Email
J1
9/+3%o 7
Date
�."D 1',le
(a—)o) -7 9 a 1
So�tN s@E' 9 IAU qv,i� CGy,1r C acj
7/96 Section 00300 Page 4
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
I
00410 BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned Naranjo Civil
Constructors, Inc as Principal, and Westfield Insurance
Company as Surety, are hereby held and firmly bound unto the
City of Fort Collins, Colorado, as Owner, in the penal sum of Five Percentof
Amount Bid ($ 5% )for the payment of which, well and truly to be made, we
hereby jointly and severally bind ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal
has submitted to the City of Fort Collins, Colorado the accompanying bid
and hereby made a part hereof to enter into a Contract Agreement for the
construction of City of Fort Collins Project, 6062 Lemay Right Turn Lane at
Mulberry
WHEREAS, the Owner, as a condition for receiving said bid, requires
the Principal to deposit with the Owner a Bid Guaranty equal to five
percent (5%) of the amount of said bid.
NOW, THEREFORE,
(a) If said bid shall be rejected; or in the alternate,
(b) If said bid shall be accepted and the Principal
shall execute and deliver a Contract Agreement
(properly completed in accordance with said bid) and
shall furnish a Performance and Payment Bond upon
the forms prescribed by the Owner for the faithful
performance of said Agreement; and shall in all
other respects perform the agreement created by the
acceptance of said bid;
then this obligation shall be void, otherwise the same shall remain in
force and effect; it being expressly understood and agreed that the liabi-
lity of the Surety for any and all claims hereunder shall, in no event,
exceed the penal amount of this obligation as herein stated.
00410 continued
The Surety, for value received, hereby stipulates and agrees that the
obligations of said Surety and its bond shall be in no way impaired or
affected by any extension of the time within which the Owner may accept
such bid; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set
their hands and seals this 13th day of September , 2007 , and such of them
as are corporations have caused their corporate seals to be hereto affixed
and these presents to be signed by their proper officers, the day and year
first set forth above,
PRINCIPAL SURETY
Name Naranjo Civil Constructors, Inc Westfield Insurance Company
1863 Second Avenyye 6300 S Syracuse Way, Suite 230
Address: Greeley, CO S31 En lew od CO 8011
By B
m-F
SbHaJ L�r>r . VP _ Title: Karen Feggestad
Attorney tia
PAI
(SEAL) (SEAL)
All
NOTE: Surety Companies executing bonds must be authorized to transact
6 business in the State of Colorado and be acceptable to the Owner.
MOODY INSURANCE AGENCY, INC.
3773 CHERRY CREEK NORTH DRIVE, SUITE 800
DENVER, COLORADO 80209-3804
PHONE (303) 824-6600
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME
POWER 0 AND ISSUED PRIOR TO 03107103, FOR ANY PERSON OR PERSONS NAMED BELOW.
General POWER NO 0500152 07
Power Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
Ohio Farmers Insurance Co.
CERTIFIED COPY Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a 'Company' and collectively as 'Companies; duly
organized and existing under the laws of the State of Ohio, and having Its principal office In Westfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
EVAN E MOODY, DANIEL S FINHOLM, VERA T KALSA, D N BROYLES, KAREN A FEOGESTAD, SCOTT J HOWARD,
JOINTLY OR SEVERALLY
of DENVER and State of CORS true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred In Its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other Instruments or contracts of
suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -- - - - - - - - - - - -
LIMITATION THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do In
the premises Said appointment Is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY
'Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and Is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-In-Fact to represent and act for
and on behalf of the Company subject to the following provisions'
The Aftorney-In-Fact. may be given full power and authority for and In the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognlzances, contracts, agreements of Indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such Instruments so executed by any such
Attorney -In -Fact shall be as binding upon the Company as If signed by the President and sealed and attested by the Corporate Secretary'
'Be It Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which It Is attached.' (Each adopted at a meeting
held on February„$, 2000)
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 07th day of
MARCH A.D. 2006 . ,
Corporal N
seats
\�s�.�'bf7 ••.,.:p:�t(7AC
,..
Affixed I. '
SEAL
State of Ohio "'�"�"•"
County of Medina as
WESTFIELD INSURANCE COMPANY
WESTFIELD NATIONAL INSURANCE COMPANY
IAi11EgEp.t' OHIO FARMERS INSURANCE COMPANY '`nJly
+By
Richard L. Kinnaird, Jr., Senior Executive
On this 07th day of MARCH A D , 2006 , before me personally came Richard L. Kinnalyd, Jr. to me known, who, being by me duly
sworn, did depose and say, that he resides In Medina, Ohio; that he Is Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described In and which executed the above
Instrument, that he knows the seals of said Companies, that the seals affixed to said Instrument are such corporate seals, that they were so affixed
by order of the Boards of Directors of said Companies, and that he signed his name t/thheerrreet/to�/1 by like order
Notarial
Seal ptAL S '
Affixed
• l William J. Kahelin, Av6rney at Law, Notary Pubhc
State of Ohio N am 0 My Commission Does Not Expire (See 147 03 Ohio Revised Code)
T E O i �
County of Medina ss q r
''•...r
1, Frank A. Carrillo, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which Is still In full force and effect, and furthermore, the resolutions of the Boards of Oirectors, set out In the Power of Attorney are
In full force andteffect
In W$rrIl9*V1W,,,?eof, I have hereunto set my hand and affixed the seals of said Companies at Westfleld Center, Ohio, this 13thday of
e�etttbEFr f 1PrDD11*,. 2007
AIL
x
4PC AC2 (oerlilil
s
,.•'°fit K`NAC n�S•,
n, S EA L L9m I
„.
(06-02)
1iJlrEtt�p 1�1
1848 : -i1 Frank A Carrind, Secret t Srmrrury
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1.
Name of Bidder:
Cv"%i
C,7tF�TON�csyp�S�
2.
Permanent main
office address: I�U,3
d. o
c4LE��' C-0 'i3(1Zo 3I
3. When organized:
").1 iwa�
4. If a corporation, where incorporated: C7l_a{W�coa
5. How many years have you been engaged in the contracting business
under your present firm or trade name? & Yf-
6. Contracts on hand: (Schedule these, showing the amount of each
contract and the appropriate anticipated dates of completion.)
7.
General character of Work performed by your company:
CaN�at�rE,_ una,�, 0T�L-\ntS0 D2-,-nCi" ,av
8. Have you ever failed to complete any Work awarded to you? �j n
If so, where and why?
E
Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency? %jo
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
SE-C— Pt'crA-C- -U-p
12. List your major equipment available for this contract.
Sty' f%cCykC.ti
13. Experience in construction Work similar in importance to this
project:
14. Background and experience of the principal members of your organization,
including officers:
15. Credit available: $ ?50rJ OHO l
16. Bank reference: Fr1�AM UIJ Q�(LZ11 ��J �31. iil3lr
17. Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER?
V E75
18. Are you licensed as a General CONTRACTOR?
If yes, in what crty, county and state? 4rtUc--saw, ;WyV�01 3o-�—oLiL What
class, license and numbers? Cram= /ky(zn(,q
19. Do you anticipate subcontracting Work under this
Contract? Y
If yes, what percent of total contract? Lo '/b
and to whom?
20. Are any lawsuits pending against you or your firm at this time? No
IF yes, DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
What company? {.ii0y IN y,(7-tAr�C"E (n.c n41�r..T-'1
22. What are your company's bonding limitations? 3 S-n1�nN R—C'aX.
�`AN:"aW SOCZ
23. The undersigned
corporation to
verification of
Qualifications.
Dated at 10 OQ
Title: V 1
State of C,,,_ w4co
County of WIN-Aj
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
this 13 day of 200.7
7o"i,-i being duly sworn deposes and says that he
is V 9 of UAi� ptoso C.r,t C.,,ssx+J�cst�,�FK and that
(name of organization)
the answers to the foregoing questions and all statements therein contained
are true`and correct.
Subscribed and'sworn to before me this I ✓ day of� 20�
ir5 f?01;, .
Ay+�'"; 44 Fill,
My Commisslon Expires
- y rc6imni rsion expires November 05. 2008
w A
7/96 Section 00420 Page 3
PAST PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Project Title
Protect Location
Protect Description
Architect/Engineer Information
ArchitecVEngineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Final Contract Amount
Change Order History
Total Number of Change Orders
Total Amount of Change Orders
City of Greeley
Wendy Daughtery, City Engineer
1100 10th Street, Suite 300, Greeley, CO 80631
(970)336-4095
Promontory Pond Rehabilitation
Greeley, CO
2200CY Earthwork, 3800 Ton Riprap, 1900 Ton Bedding,
Pond Liner Repair, Structural Concrete Modifications
Smith Geotechnical
1225 Red Cedar Circle, Suite H, Fort Collins, CO 80524
(970)490-2620
Page 1 of 3
476,759.00
371,721.49
2,478.77
r,
„9.ssTransmittal
Date 09/21/07
To City of Fort Collins
Naranjo Cnrd Constructors, Inc
1863 2nd Avenue
Greeley, CO 80631
Phone (970) 356.7909
Far (970) 356-0887
Websde i~ naranlocivil win
Email lohnlQnaranlocivil win
TransMemo TRN-001
215 North Mason Street, 2nd Floor
Fort Collins, CO 80524
Phone (970)221-6367
Fax (970)221-6586
Attn- John Stephen
Subject AQC M455-070 Lemay Ave Right Turn Lane at Mulberry Street
Comments:
John,
Attached are the additional required CDOT Forms. Let me know if 1 missed anything.
Thanks.
Qty. item No. IDescription
F1 09/21/07 11CDOT Form 605
09/21/07 11CDOT Form 621
���3 —� 09I21107 CDOT Form 715 20ii
_ ;
.,
Sent for the following action(s):
- As Required per Contract
By John Leone
Engineering Manager
Naranjo Civil Constructors, Inc
p j
l Rtw-1
15�..'+��w
PAST PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Project Title -
Project Location
Project Description
ArchitectfEngineer Information
Architect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Final Contract Amount
Change Order History
Total Number of Change Orders
Total Amount of Change Orders
City of Evans
Dawn Anderson, City Engineer
1100 37th Street, Evans, CO 80620
(970)475-1129
2006 Concrete Project
Evans, CO
Remove and replace concrete, 5400LF of new regional concrete
trail, non potable pump station modifications
Concrete Work Pump Station Work
City of Evans Aqua Engineering
1100 37th Street, Evans, CO 4803 Innovation Dr, Fort Collins, CO
(970)475-1129 (970)229-9668
Page 2 of 3
409,200 00
445,086 80
7
35,886 80
�rn'LLp _ p
PAST PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Project Title
Project Location
Project Description
Architect/Engineer Information
Architect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Final Contract Amount
Change Order History
Total Number of Change Orders
Total Amount of Change Orders
Town of Johnstown
Becky Ware, Project Manager
4601 DTC Boulevard, Suite 700, Denver, CO 80237
(303)2212-7275
SH60 and Parish Ave Intersection Improvements
Johnstown, CO
Intersection reconstruction Remove asphalt and concrete,
asphalt paving, concrete flatwork, waterline, storm sewer,
signdization
PBS&J
4601 DTC Boulevard, Suite 700, Denver, CO 80237
(303)2212-7275
Page 3 of 3
964,580 00
999,873.00
5
35,293 00
CURRENT PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Protect Title.
Project Location
Project Description,
Architect/Engineer Information
Architect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Contract Remaining
Percent Complete
Scheduled Completion Date
p�( �—N�"AL'"-.
City of Golden
Jeremy Reichert, Project Manger
1440 10th Street, Golden, CO 80401
(303)384-8152
2007 Concrete Replacement
Golden, CO
Remove and replace concrete Storm drainage work
City of Golden
1440 10th Street, Golden, CO 80401
(303)384-8152
Page 1 of 6
500,000 00
400,000 00
20%
Nov-07
CURRENT PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Project Title
Project location
Project Description
ArchitecUEngineer Information
Architect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Contract Remaining
Percent Complete
Scheduled Completion Date
City of Greeley
Michael Forslund
1001 9th Ave, Greeley, CO 80631
(970)336-4092
2007 Shared Concrete Replacement
Greeley, CO
Remove and replace concrete
City of Greeley
1001 9th Ave, Greeley, CO 80631
(970) 336-4092
Page 2 of tc
158,000.00
70,000 00
56%
Sep-07
CURRENT PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Project Title
Project Location
Project Description
Architect/Engineer Information
Archltect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Contract Remaining
Percent Complete
Scheduled Completion Date
C �� i
r�
�I k.
Urban Drainage Flood Control District
Jeff Fischer
2480 W 26th Ave, Denver, CO 80211
(303)455-6277
Cherry Creek at Stroh Ranch
Parker, CO
Channel Grading, Sculpted Drop Structures, Riprap Basin
Muller Engineering
777 S Wadsworth Boulevard, Lakewood, CO 80226
(303)988-4939
Page 3 of to
930,000 00
930,000 00
0%
Nov-07
CURRENT PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Project Title -
Project location
Project Description
Architect/Engineer Information
Architect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Contract Remaining
Percent Complete
Scheduled Completion Date
Town of Frederick
Andy Jesik
451 Oak Street, Frederick, CO 80530
(303)833-1416
WCR13 Median
Frederik, CO
Colored and patterned concrete median
Civll Resources
451 Oak Street, Frederick, CO 80530
(303)833-1416
Page 4 of Ic
274,000 00
240,000 00
12%
Jul-07
CURRENT PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Protect Title
Protect Location
Protect Description
ArchltectlEngineerInformation
Architect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Contract Remaining
Percent Complete
Scheduled Completion Date
Town of Parker
Tom Williams, City Engineer
20120 E Mainstreet, Parker, CO 80138
(303) 840-9546
Cherry Creek at Highlands
Parker, CO
Channel grading, trail replacement, storm culvert
Muller Engineering
777 S Wadsworth Boulevard, Lakewood, CO 80226
(303) 988-4939
Page 5 of t,
53,000 00
53,000.00
0%
Jul-07
CURRENT PROJECT INFORMATION
Owner Information
Owner
Owners Rep
Address
Contact Phone Number
Project Information
Protect Title
Project Location
Project Description
Architect/Engineer Information
Architect/Engineer
Address
Phone Number
Project Financial Information
Original Contract Amount
Contract Remaining
Percent Complete
Scheduled Completion Date
Town of Parker
Tom Williams, City Engineer
20120 E Mainstreet, Parker, CO 80138
(303)840-9546
Jordan Culvert Repairs
Parker, CO
Repair metal arch pipe under Jordan Road
Muller Engineering
777 S Wadsworth Boulevard, Lakewood, CO 80226
(303)988-4939
Page 6 of L.
23,000 00
23,000 00
0%
Jul-07
xl , OFF
LW
EQUIPMENT
VIN/SERIAL #
2004
Bobcat Skidsteer S300
S/N 525811086
2004
Bobcat Skidsteer T250 Tracked Skid
S/N 525611767
2004
Bobcat Mini- Excavator442
S/N 522311534
2002
Koamtsu PC200LC - 7L
A66173
2004
John Deere 544H Wheel Loader
1998
Komatsu PC200 LC-6
A83877
1996
Case 621B Loader
JEE0041490
1999
Komatsu PC60
56132
2001
CAT 246 Skid Loader
I 055Z03021
DUMP TRUCKS
1992
Kenworth Tandem Dump Truck
1XKAD69X4NS579621
2007
Mack Tandem Dump Truck
1993
Kenworth Tractor
1 NKDLR9X9PJ589078
1996
GMC Utility Dump Truck
1GDKC34J8TJ510658
PICK
UPS/SMALL VEHICLES
2006
Ford F150 STX Pickup
1FTRF14WX6NA34159
2005
Dodge Diesel Pickup
3D3KS28C55G708607
2005
Dodge Herm Pickup
1D3HU18D15J541426
2004
Ford F150 Pickup
1FTPW14524KD85676
2003
Toyota 4Runner
JTEBU14R638000923
2003
Toyota SR5 4x4 Pickup
5TBBT441135411279
2003
Dodge D2500 Pickup
3D7KU26673G752305
2003
Chevy C1500 #43
2GCEC19X431237294
2003
Chevy C1500 #9
2GCEC19X331379877
2003
Chevy 2500 HD 44
1GCHK29GX3E111090
2002
GMC 2500 Utility Truck 4x4
1GDHK24UX2E149149
2001
Chevrolet Crew Cab 44
1GBJK33GO1F144708
2001
Chevrolet Crew Cab 4X2
1 GBJC33G 11 F146786
2000
GMC Utility Fuel Truck 4X2
1 GDGC24R8YR224615
1999
Dodge Turbo Diesel 2500 Extended Cab 4X4
167KF2363XJ544774
1999
Ford F350 Crew Cab 4X4
1 FDW W37S3XED96290
1990
Dodge Diesel Pickup Utility
1B7KE2685LS686435
TRAILERS
2002 Wacker G25 Portable Generator Trailer
4TCSU02522HG2000F
1999 Ingersoll Rand Generator Trailer
29677UAJ221
1999 Fontaine Lowboy Trailer
4LF4S5134X3508570
1995 Gold Star Trailer
4HLCH1621ST080982
1995 Maxey Trailer
1 M9FT24T7S1104053
1991 Stnck Van Trader
1S11S8286ME336559
1991 Strick Van Trailer
1S11S8288ME336594
1972 Fruehauf Van Trailer
BLP899218
2001 SUPTrailer- Geno's
1S9HP16211C243790
2001 SUP TRAILER
1S9TP14291C243596
2001 HMD Trailer
ID0319299CO
1981 HMD Trailer
I ID610581COLO
MOBILE CONSTRUCTION EQUIPMENT
2005 Multiqwp 2" Submersible Pump
n/a
2003 3" Gas Trash Pump
Senal # 18606 Model # QP301TH
2003 Honda GX120 4 0 HP Joint Saw
n/a
2004 Partner K950 14" Demo Saw
n/a
2003 Partner K950 14" Demo Saw
n/a
2002 Partner K950 14" Demo Saw
n1a
2002 Wylie Water Trailer
2002 Laser Level Spectra Precision
2002 Topcon Pipe Laser
20D1 Partner K950 16" Concrete Demo Saw w/blade
2001 Munro 3" Submersible Pump
2001 Munro 3" Submersible Pump
2001 Munro 3" Submersible Pump
2001 Georgia buggy - Concrete transport
2001 Georgia buggy - Concrete transport
2001 Bosch Rotary Hammer Drill 11227E
2001 Asphalt Cutting tool attachment
2000 Stanley Hydraulic Plate Compactor for CASE 580
2000 Honda Generator 5 5 hP
2000 Honda Generator 5 5 hP
1999 Honda Generator 6 5 hP
1998 Hydraulic Thumb Attachment for Komatsu PC200
1998 Wacker Jumping Jack
1998 Hotsy 550C
1997 Cat Forklift 5000 LB
1996 Multi - Quip Rammer MT-85H
1995 Multi - Quip Generator 6 5 hP
1995 Ground Pounder Plate Compactor (Honda)
1995 Ground Pounder Plate Compactor (Honda)
1995 Gar-Bro Concrete Bucket
1993 Ground Pounder Plate Compactor (Honda)
1988 Dayton Industrial Generator 11 hP
Bomag BW605 Walk Behind Roller
1985 Lincoln Arc Welder (Portable)
1985 Clipper Concrete 14" Floor Saw w/ Diamond Blade
n/a
n/a
n/a
n/a
n/a
05AM051
COLORADO DEPARTMENT OF TRANSPORTATION
CONTRACTORS PERFORMANCE CAPABILITY STATEMENT
Project
1 List names of partnerships or joint ventures 0 none
2 List decreases In the contractors fiscal or workmanship qualifications compared to the last prequallficatlon statement
submitted to CDOT (Attach additional sheets If necessary )
a Key personnel changes 0 none
b Key equipment changes 0 none
c Fiscal capability changes (legal actions, etc) 0 none
d Other changes that may effect the contractors ability to perform work 0 none
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE
OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND CORRECT TO THE
BEST OF MY KNOWLEDGE
Contractor's firm or company name
By
Date
Title
2nd Contractor's firm or company name (if joint venture)
By
Date
Title
CDOT Form #605 1/92
Herman Naranjo
President — Operations Superintendent
EXPERIENCE SUMMARY
Mr Naranjo has over 32 years of diverse experience in Concrete Construction in
Colorado Mr Naranjo has been involved with the construction and construction
management of concrete construction projects for over 30 years Mr Naranjo as
Owner and President of Naranjo Civil Constructors, Inc , has built an organization
that specializes in civil concrete structures through urban and rural waterways
and complex street and trail reconstruction projects Mr Naranjo has owned and
operated Naranjo Civil Constructors, Inc for 23 years and has built a solid
reputation throughout the industry for his thorough knowledge of concrete
construction operations and the application of the highest standards in safety,
quality, and productivity
RECENT PROJECT EXPERIENCE
7'h Ave Bridge Reconstruction over the No. 3 Ditch
Owner Contact: City of Greeley
Scope of Work: Scope involves the demolition and replacement of existing
bridge with a CIP 8 X 22 Concrete Box Culvert The project scope extends
beyond a concrete structure in that it involves dewatering, excavation, sub -grade
replacement, backfill, installation of storm drainage systems, and street and
pedestrian walkway reconstruction
36th Avenue Drainage Improvements
Owner Contact: City of Evans
Scope of Work: Scope involved the demolition and replacement of existing
bridge with a CIP 4 X 8 Concrete Box Culvert H + L Concrete, Inc , as the
General Contractor, performed the entire excavation, subgrade replacement and
prep, as well as the backfdl and final grading for the project The protect also
involves guardrail construction, RCP, and nprap placement at FES outflow
Two Rivers Parkway — Greeley/Loveland Canal
Owner Contact: Weld County
Scope of Work: Scope involved the excavation and prep for a CIP 8 X 10
Concrete Box Culvert H + L Concrete, Inc , as the General Contractor,
completed the entire excavation, subgrade prep, and concrete construction for
the project,
Lower Shaw Heights Channel Improvements
Owner Contact: Urban Drainage & Flood Control District/City of Westminster
Scope of Work: Scope of work involved construction of an 8 X 10 CIP Concrete
Box Culvert, three concrete drop structures, and a ramp and retaining wall
system for maintenance access near 80th Avenue and Sheridan, in Westminster,
Colorado H + L Concrete, Inc , built the structure while dealing with massive
surges in stormwater runoff through the channel The protect also had the
additional complexity of being built amidst apartment complexes and the UP
railroad line on one side and commercial businesses on the other
Punt The Creek, Phase II / III
Owner Contact: Greenway Foundation
Scope of Work: Scope of Work involved the construction of several concrete
structures interlaced with a new bike trail near Lower Downtown Denver The
work was performed as part of a total protect that diverted the Cherry Creek
Channel and subsequently presented several water control challenges
WORK EXPERIENCE
H + L Concrete, Inc., Greeley, Colorado
Owner - President
CG&S Company, Greeley, Colorado
Project Superintendent
Cowan Concrete Inc, Greeley, Colorado
Concrete Foreman
Jerry Naranjo
1863n° Avenue
Greeley, CO 80631
Office: (970) 356 - 7909
Education
Bachelor of Science —Engineering —Civil Specialty Colorado school ofMines 1993
Professional Profile and Proiect Experience
Naranjo Civil Constructors, Inc. — Genera/ Manager, Vice —President & Secretary,
June 1999 — Present
Currently responsible for all phases of project management, design -build services, estimating,
business development, accounting, personnel management, and contract management.
Experience summaries of major responsibilities are as follows.
• Project Management. Currently responsible for construction projects totaling nearly 5 0
million per year in revenue Project management tasks include but are not limited to pre -
construction meetings, submittals, materials purchasing, scheduling, utility locates and potholing
services, subcontractor management, progress billing, and equipment and manpower allocation
Also serves as the in-house engineer to troubleshoot technical problems on the plans and in the
field, as well as providing surveying and takeoff support to the excavating and concrete crews.
Tasked with promoting quality construction, safe working environments and ultimately project
profitability
• Design -Build Services. Offers small-scale design -build services to a select group of
contractors normally related to drainage structures and solutions related to structural concrete.
Design services have been offered using AutoCAD R14, photo/image editors and publishing
software to produce high -end presentation style drawings for ownership review and acceptance.
Subsequent "build" services are implemented from design and directly into the field.
• Estimating. Obtains all quotes from suppliers and subcontractors for approximately 30
projects per month. Manages the database of quotes received over time by supplier by
specification. Attends all pre -bid meetings on behalf of the organization and conducts thorough site
investigations to troubleshoot conditions that could possibly impact the cost of construction.
• Business Development. Responsible for assessing new business opportunities via public
advertisements for bid, negotiated work with clients, and scanning contacts to develop new leads.
Constructs all presentation materials for new client development with several software packages
namely, Microsoft Office, Adobe Publisher, and AutoCAD R14.
• Accounting. Responsible for tracking all accounting functions including but not limited to A/R,
A/P, project cost tracking, payroll, and all federal, state and local taxation issues Also responsible
for monthly, quarterly, and annual financial statements to be submitted to bonding and banking
authorities Also develops budgets and revenue forecasts for internal review.
• Personnel Management. Serves as new -hire screener in charge of selecting qualified
applicants for various positions within the organization Responsible for all new hire reporting to
the state as well as all personnel issues related to job performance evaluations, terminations,
workman's compensation claims, and most importantly the redistribution of personnel to optimize
crew performance.
• Contract Management. Responsible for getting low -bid and negotiated work under contract.
Responsibilities also include all tasks related to subcontracts, change orders, change of condition
cost estimates, actual vs budget analysis, retainage issues, and punchlist management. Serves as
the point person for all clients, engineers, and subcontractors.
MORRISON KNUDSEN CORPORATION, Denver, Colorado
Staff Engineer-1996-1999
Served as a Staff Engineer and consultant to the mining and construction industry Known in the
industry to be one of the most advanced users of the Mincom mine planning software Extensive
participation in developing feasibility studies and mine plans in Venezuela and Germany Also
served long-term consulting contracts for onsite engineering and innovative solutions for BHP New
Mexico Operations in Farmington, NM and ALCOA Sandow Mine in Rockdale, Texas Provided
engineering and cost analysis to support potential and ongoing mining and construction projects
internal and external to the organization.
MORRISON KNUDSEN CORPORATION, Denver, Colorado
Interim Office Manager - 1996 -1997
Responsible for starting the Mining Group's Denver Office, and developing a solid client base.
Responsible for consulting revenues, marketing and development of future business, and the
subsequent expansion of the office to include technical staff relocated from San Antonio, Texas.
Also responsible for all administrative duties until support structures were in -place, and
operational.
MINCOM INC, Denver, Colorado
Engineering Consultant -1995 -1996
Served as a software consultant to clients in Germany, Texas, New Mexico, and Pennsylvania, Mr
Naranjo developed a strong background in the use of Mincom's Mine Planning and Geological
Modeling Software. He was also heavily involved in marketing and sales, by serving as the
company representative for software exhibits in multiple locations. He also completed a short-term
assignment in Brisbane, Australia, working in the software development department, specifically
responsible for the specifications and design of Mincom's user-friendly GTi environment.
MORRISON KNUDSEN CORPORATION, Carlos, Texas
Project Engineer-1993 -1995
Mr Naranjo provided dragline engineering and design support for a two-dragline (BE-1570) open -
pit lignite operation. He was responsible for developing long-range mine planning, strategic
development, and designed and implemented post -mining topography, including endlake and
drainage design Mr Naranjo provided daily engineering support to the operations engineer and pit
superintendents and completed a temporary assignment as night shift dragline superintendent. He
was also responsible for the integration of state-of-the-art mining -software solutions in the mining
engineering department.
John Leone
1863n0 Avenue
Greeley, CO 80631
Office: (970) 356 — 7909
ENGINEERING MANAGER/ESTIMATOR
Education
Bachelor of Science — Chemical Engineering & Petroleum Refining - Colorado School of Mines
1992
Professional Profile and Proiect Experience
Naranjo Civil Constructors, Inc. — Engineering Manager
November 2005 — Present
Currently responsible for all phases of estimating and contract management. Also ad as project
manager as needed.
Experience summaries of major responsibilities are as follows:
• Estimating. Obtains all quotes from suppliers and subcontractors for approximately 30
projects per month. Manages the database of quotes received over time by supplier by
specification Attends all pre -bid meetings on behalf of the organization and conducts thorough site
investigations to troubleshoot conditions that could possibly impact the cost of construction.
• Contract Management. Responsible for getting low -bid and negotiated work under contract.
Responsibilities also include all tasks related to subcontracts, change orders, change of condition
cost estimates, and actual vs budget analysis.
• Business Development. Assists in assessing new business opportunities via public
advertisements for bid, negotiated work with clients, and scanning contacts to develop new leads.
Constructs all presentation materials for new client development with several software packages
namely, Microsoft Office, Adobe Publisher.
Aggregate Industries, Greeley, Colorado
Estimating Manager — 2004-2005
Served as head estimator and project manager for Aggregate Industries Greeley Contracting
Division. Projects ranged in size from $5000 to $5,500,000. Projects included both private and
public projects including CDOT projects Projects estimated and managed included projects with
up to 10 subcontractors. Responsible for obtaining all quotes from suppliers and subcontractors,
attending all pre -bid meetings on behalf of the organization, getting subcontractors under contract,
and managing projects in the construction phase.
J-2 Contracting Company, Greeley, Colorado
Estimator/Project Manager/Owner—1996-2004
Responsible for estimating and managing projects totaling $6,000,000 per year Projects ranged
in size from $5000 to $3,300,000. Projects included both private and public projects including
CDOT projects. Approximately $2,000,000 of yearly revenue was subcontracted. Responsible for
obtaining all quotes from suppliers and subcontractors, attending all pre -bid meetings on behalf of
the organization, getting subcontractors under contract, and managing project in the construction
phase.
References
• City of Greeley, Mike Bedell, Project Engineer (970) 336-4125
• Town of Parker, Tom Williams, Storm Water Engineer (303) 840-9546
• City of Evans, Dawn Anderson, Engineer (970) 475-1160
Christine Warner
1863"' Avenue
Greeley, CO 80631
Office: (970) 356 - 7909
Education
Traffic Control Supervisor Training, Erosion Control Supervisor Training, Project
Management Certification through Grow Colorado, Payroll — Labor Compliance through
Colorado Department of Transportation.
Professional Profile and Proiect Experience
Naranjo Civil Constructors, Inc. — Project Manager, Traffic Control Supervisor, Erosion
Control Supervisor, Certified Payroll.
May 2002 — Present
Currently responsible for all phases of project management, traffic control supervisor, accounting,
payroll, subcontractor management.
Experience summaries of major responsibilities are as follows -
Project Management. Currently responsible for construction projects totaling nearly 5.0
million per year in revenue Project management tasks include but are not limited to pre -
construction meetings, submittals, materials purchasing, utility locates and potholing services,
subcontractor management, and progress billing. Tasked with promoting quality construction, safe
working environments and ultimately project profitability.
Traffic Control Supervisor. Responsible for drawing traffic control management plans,
organizing traffic control equipment and maintaining a clean and safe worksite for all working
personnel on our projects
Accounting. Responsible for tracking all accounting functions including but not limited to A/R,
A/P, project cost tracking, payroll, and all federal, state and local taxation issues. Also responsible
for monthly, quarterly, and annual financial statements to be submitted to bonding and banking
authorities
Payroll. Responsible for all aspects of payroll Collecting time data from each project and
properly allocating time to those projects Documenting and tracking proper employee codes for
certified payroll
• Subcontractor Management. Responsible for notifying and properly organizing
subcontractors. Ordering materials for the project in a timely manner. Also acts as main point of
contact for all suppliers and subcontractors on all projects
Northern Colorado Traffic Control, Greeley, Colorado
Traffic Control Supervisor —Scheduling Manager 1994 - 2002
Ms Warner managed several projects with as many as 20 employees on any one sight. Has a vast
knowledge of traffic control, project management, safety, and organizational skills.
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
FG-479
?VAV k NCy � P, -,Jo�q�
VAP--'? VuA,NSTV-�Ct
7/96 Section 00430 Page 1
COLORADO DEPARTMENT OF TRANSPORTATION
Project No -
UNDERUTILIZED DBE (UDBE) BID
AQC M455-070
CONDITIONS ASSURANCE
LEMAY AVE AND SH14, FORT COLLINS, CO,
LARIMER
Instructions, Contractor — Complete and submit this form with your bid Report only Underutilized DBE (UDBE) participation percentages which
qualify under the contract goal specification for this project It is important to review CDOT Form #715 instructions before completing this forth
POLICY
It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have equal opportunity to
participate in the performance of contracts financed with federal, state or local entity funds
UNDERUTILIZED DBE PARTICIPATION COMMITMENT
1) Will your company's Underublized DBE (UDBE) participation commitment meet contract goals'® Yes ❑ No
2) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below 30.0%
3 List the UDBE firms, committed work items, and eli ibis UDBE percent of your bid that ou are committinq to each
UDBE FIRM NAME
CERTIFICATION
COMMITTED
SUBCONTRACT
ELIGIBLE
UDBE % *
EXP. DATE
WORK ITEM(S)
CATEGORY
See Fwm #715
O Trucker
1 NARANJO CIVIL
09 / 30 / 08
�ane^t Ctv'P�cae.
0 Subcontractor
30.0 %
CONSTRUCTORS, INC
0 Supplier ❑ Broker
❑ Trucker
2
I 1
❑ Subcontractor
%
O Supplier ❑ Broker
0 Trucker
3
/ /
❑ Subcontractor
%
❑ Suppler ❑ Broker
❑ Trucker
4
/ /
❑ Subcontractor
%
❑ Supplier ❑ Broker
Trucker
5
/ /
❑ Subcontractor
%
❑ Supplier 0 Broker
BOX A- TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT
30.0
Round percentage amounts to the nearest hundredth)
Additional instructions on how to calculate the actual eligible amounts and percentages for the trucker, subcontractor, supplier, and broker categories
are available on the CDOT Form #715 and in the 'Counf rig DBE Participation Toward Contract Goals and CDOT's annual DBE goer section of the
'DBE — Definitions and Requirements' In the Standard Special Pmvisrons
I understand that, if my company is determined to be the low bidder for the contract on this project, I must submit a completed
CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed on this form to the
Transportation Department by 4.00 pm on the third work day after the day bids are opened The actual amounts submitted on
each CDOT Fomi #715 must equal or exceed the percentage commitments documented on this form. In addition, if my
company does not meet the DBEIUDBE goat for this project, I must submit a completed CDOT Form #718 DBE GOOD
FAITH EFFORT DOCUMENTATION before 4,00 pm on the day after bids are opened. CDOT Form 9715s submitted for
firms not included on this form, OR for amounts exceeding those listed on this form, will be accepted but NOT counted as
Good Faith Efforts. Only the efforts the contractor made prior to the bid opening will count as Good Faith Efforts.
i understand my obligation to abide by the policy stated above. I shall not discriminate on the basis of race, color, age, sex, national
origin, or handicap in the bidding process or the performance of contracts
I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY
KNOWLEDGE.
Company Name' Date:
H&L CONCRETE INC, D13A NA R CIVIL CONSTRUCTORS, INC 9 / 13 / 07
Company Officer . afire' Title:
VP
Previous edition: may not be used CDOT Form 714 1106
COLORADO DEPARTMENT OF TRANSPORTATION
PROJEM N
c t^ s5- o 0
ANTI -COLLUSION AFFIDAVIT
LocanoN
l.ICA,^_a A,,e
FO'2T Crn-taN5 CQ l�.l i`�lT}2- CO ---74,
I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this
bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on
his or her behalf and on behalf of my firm
I further attest that
1 The prices) and amount of this bid have been arrived at independently, without consultation, communication or
agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder
or potential prime bidder
2A Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or
potential prime bidder on this project, and will not be so disclosed prior to bid opening
2B Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on
this project have been disclosed to me or my firm
3A No attempt has been made to solicit, cause or induce any firm m or person who is a bidder or potential prime bidder to
refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non-
competitive bid or other form of complementary bid
3B No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder
on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project
4 The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or
discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom-
petitive or other form of complementary bid
5 My fiirn has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or
services from any firm or person, or offered, promised or paid cash or anything of value to any fine or person,
whether in connection with this or any other project, in consideration for an agreement or promise by any firm or
person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid
or agreeing or promising to do so on this project
6 My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or
services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person,
whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high,
noncompetitive or other forth of complementary bid, or agreeing or promising to do so, on this project
7 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities
relating to the preparation, approval or submission of my firm's bid on this project and have been advised by each of
them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or
other conduct inconsistent with any of the statements and representations made in this affidavit
8 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent
concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this
contract
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST
OF MY KNOWLEDGE
Connector's lion or orarparry name
li * L Cot�c-� ---r= ltacTi
By /
D
'D7->h NA.cw�o Gv(L° Co�S�vv S,1Nc
"e
�P
2rM 000troc s fine or conwany name (H joint wntum )
By
Dare
Title
� ....POE...... ¢'��
Sworn to before me this�;."day of, C�� 20 U I
NMW PuMk Z I "Lna
MY cpmnisslon copffe. = /
','�.
NOTE: This document mus6fW,,s3f ned`•
�-r
I'll CDOT Form #M8 1102
COLORADO DEPARTMENT OF TRANSPORTATION
CONTRACTORS PERFORMANCE CAPABILITY STATEMENT
Project#
lkWr- t-A4ss- ono
1 List names of partnerships or joint ventures )( none
2 List decreases in the contractors fiscal or workmanship qualifications compared to the last prequalification statement
submitted to CDOT (Attach additional sheets if necessary )
a Key personnel changes N none
b Key equipment changes 14 none
c Fiscal capability changes (legal actions, etc) none
d Other changes that may effect the contractors ability to perform work none
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE
OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND CORRECT TO THE
BEST OF MY KNOWLEDGE
Contractors firm or company name
Rt L Corscvz�--t; lwc.
By
Date
9/ai lo-7
T
2nd Contractor's firm or company name (if joint venture)
By
Date
Title
CDOT Form #605 1192
COLORADO DEPARTMENT OF TRANSPORTATION
PROJECT NO
ASSIGNMENT OF ANTITRUST CLAIMS
Contractor and Colorado Department of Transportation (CDOT) recognize that in actual economic practice
antitrust violations ultimately impact on CDOT Therefore, for good cause and as consideration for executing this
contract and for receiving payments hereunder
1 Contractor hereby irrevocably assigns to CDOT any and all claims it may now have or which may hereafter
accrue to It under federal or state antitrust laws in connection with the particular project, goods or services
purchased or acquired by CDOT pursuant to this contract
2 Contractor hereby expressly agrees
a That, upon becoming aware that a third party has commenced a civil action asserting on Contractor's
behalf an antitrust claim which has been assigned to CDOT hereunder, Contractor shall immediately
advise In writing
(1) Such third party that the antitrust claim has been assigned to CDOT, and
(2) CDOT that such civil action Is pending and of the date on which, In accordance with subparagraph
a (1) above, Contractor notified such third party that the antitrust claim had been assigned to CDOT,
b To take no action which will in any way diminish the value of the claims or rights assigned or dedicated
to CDOT hereunder, and
c Promptly to pay over to CDOT its proper share of any payment under an antitrust claim brought on
Contractor's behalf by any third party and which claim has been assigned to CDOT hereunder
3 Further, Contractor agrees that In the event It hires one or more subcontractors to perform any of Its duties
under the contract, Contractor shall require that each such subcontractor
a Irrevocably assign to CDOT (as a third party beneficiary) any and all claims that such subcontractor may
have or which may thereafter accrue to the subcontractor under federal or state antitrust laws In connec-
tion with any goods or services provided by the subcontractor in carrying out the subcontractor's obliga-
tions to Contractor,
b Upon becoming aware that a third party has commenced a civil action on the subcontractor's behalf
asserting an antitrust claim which has been assigned to CDOT hereunder, shall immediately advise In
writing
(1) Such third party that the antitrust claim has been assigned to CDOT, and
(2) Contractor and CDOT that such civil action Is pending and of the date on which, In accordance with
subparagraph b (1) above, the subcontractor notified such third party that the antitrust claim had
been assigned to CDOT,
c Take no action which will In any way diminish the value of the claims or rights assigned or dedicated to
CDOT hereunder, and
d Promptly pay over to CDOT its proper share of any payment under an antitrust claim brought on the
subcontractor's behalf by any third party and which claim has been assigned or dedicated to CDOT
pursuant hereto
I, acting in my capacity as officer of a bidder (bidders if a joint venture) do agree to the above assignment of
antitrust claims
Contractors firm or company name
By
Date
Title
2nd contractors firm or company name (It lemt venture)
By
Defe
Title
C DOT Form #621 1 V91
FZC
OJECT NO
My55.070
COLORADO DEPARTMENT OF TRANSPORTATION
ASSIGNMENT OF ANTITRUST CLAIMS
Contractor and Colorado Department of Transportation (COOT) recognize that in actual economic practice
antitrust violations ultimately impact on COOT Therefore, for good cause and as consideration for executing this
contract and for receiving payments hereunder
1 Contractor hereby irrevocably assigns to COOT any and all claims it may now have or which may hereafter
accrue to it under federal or state antitrust laws in connection with the particular project, goods or services
purchased or acquired by COOT pursuant to this contract
2 Contractor hereby expressly agrees
That, upon becoming aware that a third party has commenced a civil action asserting on Contractor's
behalf an antitrust claim which has been assigned to COOT hereunder, Contractor shall immediately
advise in writing
(1) Such third party that the antitrust claim has been assigned to COOT, and
(2) CDOT that such civil action is pending and of the date on which, in accordance with subparagraph
a (1) above, Contractor notified such third party that the antitrust claim had been assigned to COOT,
To take no action which will in any way diminish the value of the claims or rights assigned or dedicated
to COOT hereunder, and
Promptly to pay over to COOT its proper share of any payment under an antitrust claim brought on
Contractor's behalf by any third parry and which claim has been assigned to COOT hereunder
Further, Contractor agrees that in the event it hires one or more subcontractors to perform any of its duties
under the contract, Contractor shall require that each such subcontractor
a Irrevocably assign to COOT (as a third party beneficiary) any and all claims that such subcontractor may
have or which may thereafter accrue to the subcontractor under federal or state antitrust laws in connec-
tion with any goods or services provided by the subcontractor in carrying out the subcontractor's obliga-
tions to Contractor,
b Upon becoming aware that a third party has commenced a civil action on the subcontractor's behalf
asserting an antitrust claim which has been assigned to COOT hereunder, shall immediately advise in
writing
(1) Such third party that the antitrust claim has been assigned to COOT, and
(2) Contractor and COOT that such civil action is pending and of the date on which, in accordance with
subparagraph b (1) above, the subcontractor notified such third party that the antitrust claim had
been assigned to COOT,
c Take no action which will in any way diminish the value of the claims or rights assigned or dedicated to
COOT hereunder, and
d Promptly pay over to COOT its proper share of any payment under an antitrust claim brought on the
subcontractor's behalf by any third party and which claim has been assigned or dedicated to COOT
pursuant hereto
I, acting in my capacity as officer of a bidder (bidders if a joint venture) do agree to the above assignment of
antitrust claims
Contratlols nrtn or company name gy Dam
H 4 L Con�r t�-E I ri c ��� ^ 912110
Title T"
CWTF..#M IMI
COLIORADO DEPARTMENT OF TRANSPORTATION
CERTIFICATE OF PROPOSED
project No.: AQC M 455 - 0-7 o
UNDERUTILIZED DBE (UDBE)
PARTICIPATION
Project Code (SA#) IS153
LEMAv AvE Y SH
Location. 1, CaLlbitJCo, (
FaLA .cote
Form #. I of
Prime Contractor- Send completed/signed form to the Business Programs Office (instructions on second page) The "Eligible UDBE
Amounts" submitted on this form must equal or exceed the commdment(s) documented on the CDOT Form 714 you submitted with your
bid For the complete list of certified DBE/UDBE firms and their DBE work codes go to http:/fwww.d0Ls1ate.co.us1app_u
uc
NOTE: See 49 CFR pad 26 55, and the "DBE - Definitions and RequiremenW in the Standard Special Provisions, for further information concerning
counting DBE participation of truckers, subcontractors, suppliers and service providers toward the protect's UDBE goal
PART 1a — TRUCKING CONTRACT
If the UDBE is being used as a trucker for one or more "trucking" DBE work codes (25500, 25505 etc) then
ACTUAL UDBE AMOUNT - Actual contract amount for the transportation services provided by the UDBE firm and any UDBE lessees.
EUG/BLE UDBE TRUCKING AMOUNT= I (ACTUAL UDBE AMOUNT) - (Any non-UDBE lessee amounts In this contract)" I
' For work done on this UDBE contract with non-UDBE lessees, credit toward the project UDBE goal is given only for the broker fees or commissions
the UDBE trucker receives for arranging the transportabons services, because the services themselves are being performed by non-UDBEs
NAME OF UDBE FIRM
CERTIFICATION #
EXPIRATION DATE ELIGIBLE UDBE TRUCKING AMOUNT
$
DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR:
Complete list of work codes is at httpJAvww dot state cc us/app ucp/
PART 1 b —SUBCONTRACT
ELIGIBLE UDBE SUBCONTRACT AMOUNT = I (Actual UDBE contract amount) - (Aril} rion=UDBE Wvvei tier amounts in this contract)'
" Work that a UDBE subcontracts to a lower tier non-UDBE firm does not count toward the project UDBE goal,,
NAME OF UDBE FIRM
CERTIFICATION #
EXPIRATION DATE „ `ELIGIBLE UDBE SUBCONTRACTAMOUNT
NARAiJ�a Cava C0-3-R4wr n-S L I Pic
l ouor �,
u�q i 3a/��oo� $ I q oa
l010, S
t �a �wt-
DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR
Complete list of work codes is at httpLlvww dot state co ss/app�, ucpl✓
Zpsscior 2.O (yoci
PART 1c — SUPPLY CONTRACT'S'
If the supplier is a UDBE with'a ",Type" field of ','Manufacturer" for the item(s)
ELIGIBLE UDBE SUPPLY AMOUNT,=,[ (Actual UDBE contract amount) X 100%
If the supplier is a UD6E with a `Type" field of "Regular Deals ' for the item(s)
ELIGIBLE UDBE SUPPLT AMOUNT = I (Actual UDBE contract amount) X 60% I
NOTE If the supplier is a UDBE with a "Type" field of `Broker for the item(s) use PART Id- BROKER / SERVICE CONTRACT
NAME OF UDBE FIRM
CERTIFICATION #
EXPIRATION DATE ELIGIBLE UDBE SUPPLY AMOUNT
/ I is
DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR
Complete fist of work codes is at http Gwww dot state co us/app ucp1
PART I — BROKER / SERVICE CONTRACT
If purchasing materials or supplies through a UDBE with a "Type" field of "Broker, count only the amount of brokerage commission
and/or delivery service fees included in the contract Other examples of services to include in this section are bonding, brokering,
consulting, security guards, and Insurance etc
ELIGIBLE UDBE SERVICE FEE AMOUNT= Actual compensation retained by the UDBE broker/agent for services rendered'
' The amounts that count toward UDBE goals are limited to the compensation retained by the UDBE broker/agent for services rendered, provided the
fee/commission is determined by CDOT to be reasonable and not excessive as compared with fees customarily charged for similar services
NAME OF UDBE FIRM
CERTIFICATION #
EXPIRATION DATE ELIGIBLE UDBE SERVICE FEE AMOUNT
$
DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR
Complete list of work codes is at httpjA� dot state co uslapp_uclY
Original - Business Programs Office Previous editions may not be used CDOT Form 715 - Page 1 of 2 1106
STATE OF COLORADO
DEPARTMENT OF TRA114SPORTATION
� OT
Contracts and Market Analysts Branch AOC M455-070
4201 East Arkansas Avenue Lemay Ave @ Mulberry Street
Denver, Colorado 80222 Project Code 15153
Telephone (303) 757-9736
Facsimile (303) 757-9868
RECEIVE=.
September 24, 2007
Mr Jin Wang
City of Fort Collins
Engineering Dept
P O Box 580
Fort C011111a, CO 80522-0580
Dear Mr Wang
Based on my review of the financial statement dated Sept 21, 2007 and
receipt of
-CDOT Form 605, Contractors Performance Capability Statement
-CDOT Form 606, Anti -Collusion Affidavit
-CDOT Form 621, Assignment of Anti -Trust Claims and
-Documentation of conformance with CDOT UDBE Contract Goal Policy,
the City's award of Protect AQC M455-070 to Naranjo Civil Constructors is
approved.
Please include a copy of FHWA Form 1213 as part of your contract with Naranjo
Civil Constructors Your cooperation in this matter is appreciated
Sincerely,
Richard
CDOT Award Officer
SECTION 00300
BID FORM
SECTION 00300
BID FORM
PROJECT:6062 Lemay Right Turn Lane at Mulberry
Place
Date cj/i3/0-7 A
1. In compliance with your Invitation to Bid dated ALY uiv ;1-JL, 200-7 and
subject to all conditions thereof, the undersigned
a (Corporation, Limited Liability Company, Partnership, Joint Venture, or
Sole Proprietor) authorized to do business in the State of Colorado
hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed
on the following Bid Schedule or Baal Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this
proposal is made in good faith, without collusion or connection with any
other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the
Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be
done, all of which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of Fky£ P6CcL-4-1: OF A-1-4W;.ir $S.p
($ ) in accordance with the Invitation To Bid and Instructions
to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this
Bid. The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: We5ss L-i.P b-oos fNmc'/� W-j 2:2.0
C.J �3ut1)
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by
the CONTRACTOR under one of the items listed in the Bid Schedule,
irrespect.Lve of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through _ I .
7/96 Section 00300 Page 1
S BASE BID REVISED BID SCHEDULE
ADDENDUMI
6062 Lemay Right Turn Lane at Mulberry
Item #
Item
Unit
Quantity
Unit Cost
Total
202-00000
Removal of Structures and Obstructions
LS
1
ISAO
i51ao'-
202-OW35
Removal of Concrete Pipe
LF
99
I 5U
j 1y33 4z
202-00200
Removal of Sidewalk
SY
135
11 '-'
I S 1 a.'"
202-00201
Removal of Curb
LF
142
<4 ti�?-
I;LA -0
202-00210
Removal of Conacte Pavement
SY
164
25 -'
L[ X ILI ti
202-00220
Removal ofAsphaft Mat
SY
98
11SO
11;nj
202-00250
Removal of Pavement Marking
SF
381
Aj %:!-
-11 '
202-0I000
Removal of Fence
LF
23
I 'p
DLC Z
203-01500
Binding
HR
8
s049
1 DOO'-
208-00045
Concrete Washout Structure
EACH
1
11pp4~
''=
208-00050
Storm Dram Inlet Protection
EACH
5
3(m
jo5oo
208-00070
Stabilized Construction Entrance
EACH
1
1 �=
[ ' 1 `'-
210-01000
Reset Fence
LF
236
[25,
210 1001
Modify Fence
LF
3
=
I
210-01700
Reset Sprinkler Hcad
EACH
3
) 2 `=
t
210-017I0
Reset Valve
EACH
2
3.36'
Lo-7Lp
210-04010
Adjust Manhole
EACH
1
1p 1 S_
I S
212-00006
Seeding (Native)
ACRE
02
;1.550-
SJO's
212-00032
Soil Conditioning
ACRE
02
-7&SC
[rJ30'=
213.MM
Mulching Weed Free)
ACRE
02
S d
St0
213-00061
Mulch Twktfier
LB
40
304-06000
Aggregate Base Course Class 6
TON
254
3' =
A DL55
403-32821
Hot Mix Asphalt (Grading SG) (1 W) (PO 58-28)
TON
38
qis
-3[y113
403-33851
Hot Mix Asphalt (Grading S) (100) (PG 64-28)
TON
38
412-01020
Concrete Pavement (10 Inch) (Fast Track)
SY
261
'='
-
412-01001
Concrete Pavement(10 Inch) (Colored)
SY
18
603-01I50
15 Inch Reinforced Concrete Pipe
LF
55
Jr- 4D
13 1"i
603-05015
15 Inch Reinforced Concrete End Section
EACH
6
ci 20,13
608-00006
Concrete Sidewalk (61nch)
SY
94
608-OW tO
Concrete Curb Ramp
SY
29
1 c;
609-21010
Curb and Gutter Type lI Section I-B)
LF
111
609-21020
jCurb and Gutter T II(Section II-B)
LF
482
-v
I 'Ll
609-24002
Gutter Type II (2 Foot)
LF
176
3=
p `L°
610-00030
Medum Cover Material Concrete
SF
1,354
'�-C14
'j --
626-00000
Mobilization
LS
I
j y
630-IWOS
Traffic Control
LS
I
153Ctj
53CYJ"'
700-700I0
F/A Minor Contract Revisums
FA
1
S10,00000
$10,00000
Total Bid Cost
155;A
Total Bid Cost in Words: � Mai-C2w EiCrt q.rE T�,C.�O ;,j INFs"x MtsL-E-�7,1aUollars
(For Performance and Payment Bonds)
Force Account
Total Bid Cost
I SSc) r
700-700l6
F/A Fuel Cost Adjustment
FA
1
51,500 00
$1,500 00
700-7W21
F/A On -The -Job Traince
HOUR
0
$000
$000
700-70022
F/A O1T Colorado Tminm09111113FA
1
$150 00
$150 00
700-70380
F/A Erosion Control
I FA
1
$I,OW 00
$1,000 W
Total Contract Cost
[ y
Total Cost in Words:
IIKW.M
PRINTED NAME M*4-t s s-:&A -
DATE
NArcAN w Cpvti Cs�s' �.u'�i t I,.rc
TITLE �\
Base Bid
Item #
Item
Unit
Quantity
Umt Cost
Total
202-00000
Removal of Structures and Obstructions
LS
1
202-00035
Removal of Concrete Pipe
LF
99
202-00200
Removal of Sidewalk
SY
135
202-00201
Removal of Curb
LF
142
202-00210
Removal of Concrete Pavement
SY
164
202-00220
Removal of Asphalt Mat
SY
98
202-00250
Removal of Pavement Marking
SF
381
202-01000
Removal of Fence
LF
23
203-01500
Blading
HR
8
208-00045
Concrete Washout Structure
EACH
208-00050
Storm Drain Inlet Protection
EACH
5
209-00070
Stabd¢ed Construction Entrance
EAC
1
210-01000
Reset Fence
236
210-01001
Modify Fence
LF
3
210-01700
Reset Sprinkler HeadnLCB
3
210-01710
Reset Valve
2
210-04010
Adjust Manhole
1
212-00006
SeedingNative
02
212-00032
Soil Conditioning
02
213-00003
Mulching (Weed Free)
02
213-00061
Mulch Tackifier
40
304-06000
Aggregate Base Course lass 6)
TON
254
403-32821
Hot Mix As haft G n SG 100 PG 58-28
TON
38
403-33851
Hot Mix Asphalt radio S 100 PG 64-28
TON
38
412-01020
Concrete Pav ent (10 Inch) (Fast Track)
SY
261
412-01001
Concrete P ement (10 Inch) (Colored)
SY
18
603-01150
15 Inch einforced Concrete Pipe
LF
55
603-05015
151 w Reinforced Concrete End Section
EACH
6
608-00006
2�ncr Is Sidewalk 6 Inch
SY
94
608-00010
Concrete Curb Ramp
SY
29
609-2101
Curb and Gutter Type It (Section I-B)
LF
111
609-21 20
Curb and Gutter Type 11 (Section II-B)
LF
482
609-24002
Gutter Type It (2 Foot)
LF
176
610-00030
Median Cover Material (Concrete)
SF
1,354
626-00000
Mobilization
LS
1
630-10005
Traffic Control
LS
1
7/96 Section 00300 Page 2