Loading...
HomeMy WebLinkAboutRESPONSE - BID - 6062 LEMAY RIGHT TURN LANE AT MULBERRY 31218NrR��roRe C cv of �ovr Co s 2 s blowny M{i`.v�N T CO I it �Tw�97,d�SLcrf�� -6o �M* JOPM I� 700-70010 F/A Minor Contract Revisions FA 1 700-70016 F/A Fuel Cost Adjustment FA 1 700-70021 F/A On -The -Job Trainee 0 700-70022 F/A OJT Colorado Tr m FA 1 700-7038 osion Control FA 1 Total Cost Total Cost in Words: 9. PRICES Dollars The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. 10. ACCEPTANCE OF FUEL COST ADJUSTMENTS: Bidders have the option to accept Fuel Cost Adjustments in accordance with the Revision of Section 109 - Fuel Cost Adjustment. To accept this standard special provision, the bidder must fill in an "X" next to "YES" below. No Fuel Cost Adjustment will be made due to fuel cost changes for bidders who answer "NO". If neither line is marked, the Department will assume the bidder rejects Fuel Cost Adjustments for this project. After bids are submitted, bidders will not be given any other opportunity to accept or reject this adjustment. (Mark only one line with an "X"): YES, I choose to accept Fuel Cost Adjustments for this project X NO, I choose NOT to accept Fuel Cost Adjustments for this project (if neither line is marked, the default is "NO", I choose NOT to accept Fuel Cost Adjustments for this project 7/96 Section 00300 Page 3 RESPECTFULLY SUBMITTED: At L Corx 2c�� NC CONTRACTOR BY: V 1 Title License Number (If Applicable) if Bid is by corporation) A ` aaaress J Telephone Email J1 9/+3%o 7 Date �."D 1',le (a—)o) -7 9 a 1 So�tN s@E' 9 IAU qv,i� CGy,1r C acj 7/96 Section 00300 Page 4 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 7/96 Section 00410 Page 1 I 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned Naranjo Civil Constructors, Inc as Principal, and Westfield Insurance Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as Owner, in the penal sum of Five Percentof Amount Bid ($ 5% )for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying bid and hereby made a part hereof to enter into a Contract Agreement for the construction of City of Fort Collins Project, 6062 Lemay Right Turn Lane at Mulberry WHEREAS, the Owner, as a condition for receiving said bid, requires the Principal to deposit with the Owner a Bid Guaranty equal to five percent (5%) of the amount of said bid. NOW, THEREFORE, (a) If said bid shall be rejected; or in the alternate, (b) If said bid shall be accepted and the Principal shall execute and deliver a Contract Agreement (properly completed in accordance with said bid) and shall furnish a Performance and Payment Bond upon the forms prescribed by the Owner for the faithful performance of said Agreement; and shall in all other respects perform the agreement created by the acceptance of said bid; then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liabi- lity of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. 00410 continued The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such bid; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 13th day of September , 2007 , and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above, PRINCIPAL SURETY Name Naranjo Civil Constructors, Inc Westfield Insurance Company 1863 Second Avenyye 6300 S Syracuse Way, Suite 230 Address: Greeley, CO S31 En lew od CO 8011 By B m-F SbHaJ L�r>r . VP _ Title: Karen Feggestad Attorney tia PAI (SEAL) (SEAL) All NOTE: Surety Companies executing bonds must be authorized to transact 6 business in the State of Colorado and be acceptable to the Owner. MOODY INSURANCE AGENCY, INC. 3773 CHERRY CREEK NORTH DRIVE, SUITE 800 DENVER, COLORADO 80209-3804 PHONE (303) 824-6600 THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER 0 AND ISSUED PRIOR TO 03107103, FOR ANY PERSON OR PERSONS NAMED BELOW. General POWER NO 0500152 07 Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. Ohio Farmers Insurance Co. CERTIFIED COPY Westfield Center, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a 'Company' and collectively as 'Companies; duly organized and existing under the laws of the State of Ohio, and having Its principal office In Westfield Center, Medina County, Ohio, do by these presents make, constitute and appoint EVAN E MOODY, DANIEL S FINHOLM, VERA T KALSA, D N BROYLES, KAREN A FEOGESTAD, SCOTT J HOWARD, JOINTLY OR SEVERALLY of DENVER and State of CORS true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred In Its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other Instruments or contracts of suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -- - - - - - - - - - - - LIMITATION THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do In the premises Said appointment Is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY 'Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall be and Is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-In-Fact to represent and act for and on behalf of the Company subject to the following provisions' The Aftorney-In-Fact. may be given full power and authority for and In the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognlzances, contracts, agreements of Indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such Instruments so executed by any such Attorney -In -Fact shall be as binding upon the Company as If signed by the President and sealed and attested by the Corporate Secretary' 'Be It Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which It Is attached.' (Each adopted at a meeting held on February„$, 2000) In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 07th day of MARCH A.D. 2006 . , Corporal N seats \�s�.�'bf7 ••.,.:p:�t(7AC ,.. Affixed I. ' SEAL State of Ohio "'�"�"•" County of Medina as WESTFIELD INSURANCE COMPANY WESTFIELD NATIONAL INSURANCE COMPANY IAi11EgEp.t' OHIO FARMERS INSURANCE COMPANY '`nJly +By Richard L. Kinnaird, Jr., Senior Executive On this 07th day of MARCH A D , 2006 , before me personally came Richard L. Kinnalyd, Jr. to me known, who, being by me duly sworn, did depose and say, that he resides In Medina, Ohio; that he Is Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described In and which executed the above Instrument, that he knows the seals of said Companies, that the seals affixed to said Instrument are such corporate seals, that they were so affixed by order of the Boards of Directors of said Companies, and that he signed his name t/thheerrreet/to�/1 by like order Notarial Seal ptAL S ' Affixed • l William J. Kahelin, Av6rney at Law, Notary Pubhc State of Ohio N am 0 My Commission Does Not Expire (See 147 03 Ohio Revised Code) T E O i � County of Medina ss q r ''•...r 1, Frank A. Carrillo, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which Is still In full force and effect, and furthermore, the resolutions of the Boards of Oirectors, set out In the Power of Attorney are In full force andteffect In W$rrIl9*V1W,,,?eof, I have hereunto set my hand and affixed the seals of said Companies at Westfleld Center, Ohio, this 13thday of e�etttbEFr f 1PrDD11*,. 2007 AIL x 4PC AC2 (oerlilil s ,.•'°fit K`NAC n�S•, n, S EA L L9m I „. (06-02) 1iJlrEtt�p 1�1 1848 : -i1 Frank A Carrind, Secret t Srmrrury SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Cv"%i C,7tF�TON�csyp�S� 2. Permanent main office address: I�U,3 d. o c4LE��' C-0 'i3(1Zo 3I 3. When organized: ").1 iwa� 4. If a corporation, where incorporated: C7l_a{W�coa 5. How many years have you been engaged in the contracting business under your present firm or trade name? & Yf- 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 7. General character of Work performed by your company: CaN�at�rE,_ una,�, 0T�L-\ntS0 D2-,-nCi" ,av 8. Have you ever failed to complete any Work awarded to you? �j n If so, where and why? E Have your ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency? %jo If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. SE-C— Pt'crA-C- -U-p 12. List your major equipment available for this contract. Sty' f%cCykC.ti 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 15. Credit available: $ ?50rJ OHO l 16. Bank reference: Fr1�AM UIJ Q�(LZ11 ��J �31. iil3lr 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? V E75 18. Are you licensed as a General CONTRACTOR? If yes, in what crty, county and state? 4rtUc--saw, ;WyV�01 3o-�—oLiL What class, license and numbers? Cram= /ky(zn(,q 19. Do you anticipate subcontracting Work under this Contract? Y If yes, what percent of total contract? Lo '/b and to whom? 20. Are any lawsuits pending against you or your firm at this time? No IF yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL What company? {.ii0y IN y,(7-tAr�C"E (n.c n41�r..T-'1 22. What are your company's bonding limitations? 3 S-n1�nN R—C'aX. �`AN:"aW SOCZ 23. The undersigned corporation to verification of Qualifications. Dated at 10 OQ Title: V 1 State of C,,,_ w4co County of WIN-Aj hereby authorizes and requests any person, firm or furnish any information requested by the OWNER in the recital comprising this Statement of Bidder's this 13 day of 200.7 7o"i,-i being duly sworn deposes and says that he is V 9 of UAi� ptoso C.r,t C.,,ssx+J�cst�,�FK and that (name of organization) the answers to the foregoing questions and all statements therein contained are true`and correct. Subscribed and'sworn to before me this I ✓ day of� 20� ir5 f?01;, . Ay+�'"; 44 Fill, My Commisslon Expires - y rc6imni rsion expires November 05. 2008 w A 7/96 Section 00420 Page 3 PAST PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Project Title Protect Location Protect Description Architect/Engineer Information ArchitecVEngineer Address Phone Number Project Financial Information Original Contract Amount Final Contract Amount Change Order History Total Number of Change Orders Total Amount of Change Orders City of Greeley Wendy Daughtery, City Engineer 1100 10th Street, Suite 300, Greeley, CO 80631 (970)336-4095 Promontory Pond Rehabilitation Greeley, CO 2200CY Earthwork, 3800 Ton Riprap, 1900 Ton Bedding, Pond Liner Repair, Structural Concrete Modifications Smith Geotechnical 1225 Red Cedar Circle, Suite H, Fort Collins, CO 80524 (970)490-2620 Page 1 of 3 476,759.00 371,721.49 2,478.77 r, „9.ssTransmittal Date 09/21/07 To City of Fort Collins Naranjo Cnrd Constructors, Inc 1863 2nd Avenue Greeley, CO 80631 Phone (970) 356.7909 Far (970) 356-0887 Websde i~ naranlocivil win Email lohnlQnaranlocivil win TransMemo TRN-001 215 North Mason Street, 2nd Floor Fort Collins, CO 80524 Phone (970)221-6367 Fax (970)221-6586 Attn- John Stephen Subject AQC M455-070 Lemay Ave Right Turn Lane at Mulberry Street Comments: John, Attached are the additional required CDOT Forms. Let me know if 1 missed anything. Thanks. Qty. item No. IDescription F1 09/21/07 11CDOT Form 605 09/21/07 11CDOT Form 621 ���3 —� 09I21107 CDOT Form 715 20ii _ ; ., Sent for the following action(s): - As Required per Contract By John Leone Engineering Manager Naranjo Civil Constructors, Inc p j l Rtw-1 15�..'+��w PAST PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Project Title - Project Location Project Description ArchitectfEngineer Information Architect/Engineer Address Phone Number Project Financial Information Original Contract Amount Final Contract Amount Change Order History Total Number of Change Orders Total Amount of Change Orders City of Evans Dawn Anderson, City Engineer 1100 37th Street, Evans, CO 80620 (970)475-1129 2006 Concrete Project Evans, CO Remove and replace concrete, 5400LF of new regional concrete trail, non potable pump station modifications Concrete Work Pump Station Work City of Evans Aqua Engineering 1100 37th Street, Evans, CO 4803 Innovation Dr, Fort Collins, CO (970)475-1129 (970)229-9668 Page 2 of 3 409,200 00 445,086 80 7 35,886 80 �rn'LLp _ p PAST PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Project Title Project Location Project Description Architect/Engineer Information Architect/Engineer Address Phone Number Project Financial Information Original Contract Amount Final Contract Amount Change Order History Total Number of Change Orders Total Amount of Change Orders Town of Johnstown Becky Ware, Project Manager 4601 DTC Boulevard, Suite 700, Denver, CO 80237 (303)2212-7275 SH60 and Parish Ave Intersection Improvements Johnstown, CO Intersection reconstruction Remove asphalt and concrete, asphalt paving, concrete flatwork, waterline, storm sewer, signdization PBS&J 4601 DTC Boulevard, Suite 700, Denver, CO 80237 (303)2212-7275 Page 3 of 3 964,580 00 999,873.00 5 35,293 00 CURRENT PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Protect Title. Project Location Project Description, Architect/Engineer Information Architect/Engineer Address Phone Number Project Financial Information Original Contract Amount Contract Remaining Percent Complete Scheduled Completion Date p�( �—N�"AL'"-. City of Golden Jeremy Reichert, Project Manger 1440 10th Street, Golden, CO 80401 (303)384-8152 2007 Concrete Replacement Golden, CO Remove and replace concrete Storm drainage work City of Golden 1440 10th Street, Golden, CO 80401 (303)384-8152 Page 1 of 6 500,000 00 400,000 00 20% Nov-07 CURRENT PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Project Title Project location Project Description ArchitecUEngineer Information Architect/Engineer Address Phone Number Project Financial Information Original Contract Amount Contract Remaining Percent Complete Scheduled Completion Date City of Greeley Michael Forslund 1001 9th Ave, Greeley, CO 80631 (970)336-4092 2007 Shared Concrete Replacement Greeley, CO Remove and replace concrete City of Greeley 1001 9th Ave, Greeley, CO 80631 (970) 336-4092 Page 2 of tc 158,000.00 70,000 00 56% Sep-07 CURRENT PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Project Title Project Location Project Description Architect/Engineer Information Archltect/Engineer Address Phone Number Project Financial Information Original Contract Amount Contract Remaining Percent Complete Scheduled Completion Date C �� i r� �I k. Urban Drainage Flood Control District Jeff Fischer 2480 W 26th Ave, Denver, CO 80211 (303)455-6277 Cherry Creek at Stroh Ranch Parker, CO Channel Grading, Sculpted Drop Structures, Riprap Basin Muller Engineering 777 S Wadsworth Boulevard, Lakewood, CO 80226 (303)988-4939 Page 3 of to 930,000 00 930,000 00 0% Nov-07 CURRENT PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Project Title - Project location Project Description Architect/Engineer Information Architect/Engineer Address Phone Number Project Financial Information Original Contract Amount Contract Remaining Percent Complete Scheduled Completion Date Town of Frederick Andy Jesik 451 Oak Street, Frederick, CO 80530 (303)833-1416 WCR13 Median Frederik, CO Colored and patterned concrete median Civll Resources 451 Oak Street, Frederick, CO 80530 (303)833-1416 Page 4 of Ic 274,000 00 240,000 00 12% Jul-07 CURRENT PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Protect Title Protect Location Protect Description ArchltectlEngineerInformation Architect/Engineer Address Phone Number Project Financial Information Original Contract Amount Contract Remaining Percent Complete Scheduled Completion Date Town of Parker Tom Williams, City Engineer 20120 E Mainstreet, Parker, CO 80138 (303) 840-9546 Cherry Creek at Highlands Parker, CO Channel grading, trail replacement, storm culvert Muller Engineering 777 S Wadsworth Boulevard, Lakewood, CO 80226 (303) 988-4939 Page 5 of t, 53,000 00 53,000.00 0% Jul-07 CURRENT PROJECT INFORMATION Owner Information Owner Owners Rep Address Contact Phone Number Project Information Protect Title Project Location Project Description Architect/Engineer Information Architect/Engineer Address Phone Number Project Financial Information Original Contract Amount Contract Remaining Percent Complete Scheduled Completion Date Town of Parker Tom Williams, City Engineer 20120 E Mainstreet, Parker, CO 80138 (303)840-9546 Jordan Culvert Repairs Parker, CO Repair metal arch pipe under Jordan Road Muller Engineering 777 S Wadsworth Boulevard, Lakewood, CO 80226 (303)988-4939 Page 6 of L. 23,000 00 23,000 00 0% Jul-07 xl , OFF LW EQUIPMENT VIN/SERIAL # 2004 Bobcat Skidsteer S300 S/N 525811086 2004 Bobcat Skidsteer T250 Tracked Skid S/N 525611767 2004 Bobcat Mini- Excavator442 S/N 522311534 2002 Koamtsu PC200LC - 7L A66173 2004 John Deere 544H Wheel Loader 1998 Komatsu PC200 LC-6 A83877 1996 Case 621B Loader JEE0041490 1999 Komatsu PC60 56132 2001 CAT 246 Skid Loader I 055Z03021 DUMP TRUCKS 1992 Kenworth Tandem Dump Truck 1XKAD69X4NS579621 2007 Mack Tandem Dump Truck 1993 Kenworth Tractor 1 NKDLR9X9PJ589078 1996 GMC Utility Dump Truck 1GDKC34J8TJ510658 PICK UPS/SMALL VEHICLES 2006 Ford F150 STX Pickup 1FTRF14WX6NA34159 2005 Dodge Diesel Pickup 3D3KS28C55G708607 2005 Dodge Herm Pickup 1D3HU18D15J541426 2004 Ford F150 Pickup 1FTPW14524KD85676 2003 Toyota 4Runner JTEBU14R638000923 2003 Toyota SR5 4x4 Pickup 5TBBT441135411279 2003 Dodge D2500 Pickup 3D7KU26673G752305 2003 Chevy C1500 #43 2GCEC19X431237294 2003 Chevy C1500 #9 2GCEC19X331379877 2003 Chevy 2500 HD 44 1GCHK29GX3E111090 2002 GMC 2500 Utility Truck 4x4 1GDHK24UX2E149149 2001 Chevrolet Crew Cab 44 1GBJK33GO1F144708 2001 Chevrolet Crew Cab 4X2 1 GBJC33G 11 F146786 2000 GMC Utility Fuel Truck 4X2 1 GDGC24R8YR224615 1999 Dodge Turbo Diesel 2500 Extended Cab 4X4 167KF2363XJ544774 1999 Ford F350 Crew Cab 4X4 1 FDW W37S3XED96290 1990 Dodge Diesel Pickup Utility 1B7KE2685LS686435 TRAILERS 2002 Wacker G25 Portable Generator Trailer 4TCSU02522HG2000F 1999 Ingersoll Rand Generator Trailer 29677UAJ221 1999 Fontaine Lowboy Trailer 4LF4S5134X3508570 1995 Gold Star Trailer 4HLCH1621ST080982 1995 Maxey Trailer 1 M9FT24T7S1104053 1991 Stnck Van Trader 1S11S8286ME336559 1991 Strick Van Trailer 1S11S8288ME336594 1972 Fruehauf Van Trailer BLP899218 2001 SUPTrailer- Geno's 1S9HP16211C243790 2001 SUP TRAILER 1S9TP14291C243596 2001 HMD Trailer ID0319299CO 1981 HMD Trailer I ID610581COLO MOBILE CONSTRUCTION EQUIPMENT 2005 Multiqwp 2" Submersible Pump n/a 2003 3" Gas Trash Pump Senal # 18606 Model # QP301TH 2003 Honda GX120 4 0 HP Joint Saw n/a 2004 Partner K950 14" Demo Saw n/a 2003 Partner K950 14" Demo Saw n/a 2002 Partner K950 14" Demo Saw n1a 2002 Wylie Water Trailer 2002 Laser Level Spectra Precision 2002 Topcon Pipe Laser 20D1 Partner K950 16" Concrete Demo Saw w/blade 2001 Munro 3" Submersible Pump 2001 Munro 3" Submersible Pump 2001 Munro 3" Submersible Pump 2001 Georgia buggy - Concrete transport 2001 Georgia buggy - Concrete transport 2001 Bosch Rotary Hammer Drill 11227E 2001 Asphalt Cutting tool attachment 2000 Stanley Hydraulic Plate Compactor for CASE 580 2000 Honda Generator 5 5 hP 2000 Honda Generator 5 5 hP 1999 Honda Generator 6 5 hP 1998 Hydraulic Thumb Attachment for Komatsu PC200 1998 Wacker Jumping Jack 1998 Hotsy 550C 1997 Cat Forklift 5000 LB 1996 Multi - Quip Rammer MT-85H 1995 Multi - Quip Generator 6 5 hP 1995 Ground Pounder Plate Compactor (Honda) 1995 Ground Pounder Plate Compactor (Honda) 1995 Gar-Bro Concrete Bucket 1993 Ground Pounder Plate Compactor (Honda) 1988 Dayton Industrial Generator 11 hP Bomag BW605 Walk Behind Roller 1985 Lincoln Arc Welder (Portable) 1985 Clipper Concrete 14" Floor Saw w/ Diamond Blade n/a n/a n/a n/a n/a 05AM051 COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTORS PERFORMANCE CAPABILITY STATEMENT Project 1 List names of partnerships or joint ventures 0 none 2 List decreases In the contractors fiscal or workmanship qualifications compared to the last prequallficatlon statement submitted to CDOT (Attach additional sheets If necessary ) a Key personnel changes 0 none b Key equipment changes 0 none c Fiscal capability changes (legal actions, etc) 0 none d Other changes that may effect the contractors ability to perform work 0 none I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE Contractor's firm or company name By Date Title 2nd Contractor's firm or company name (if joint venture) By Date Title CDOT Form #605 1/92 Herman Naranjo President — Operations Superintendent EXPERIENCE SUMMARY Mr Naranjo has over 32 years of diverse experience in Concrete Construction in Colorado Mr Naranjo has been involved with the construction and construction management of concrete construction projects for over 30 years Mr Naranjo as Owner and President of Naranjo Civil Constructors, Inc , has built an organization that specializes in civil concrete structures through urban and rural waterways and complex street and trail reconstruction projects Mr Naranjo has owned and operated Naranjo Civil Constructors, Inc for 23 years and has built a solid reputation throughout the industry for his thorough knowledge of concrete construction operations and the application of the highest standards in safety, quality, and productivity RECENT PROJECT EXPERIENCE 7'h Ave Bridge Reconstruction over the No. 3 Ditch Owner Contact: City of Greeley Scope of Work: Scope involves the demolition and replacement of existing bridge with a CIP 8 X 22 Concrete Box Culvert The project scope extends beyond a concrete structure in that it involves dewatering, excavation, sub -grade replacement, backfill, installation of storm drainage systems, and street and pedestrian walkway reconstruction 36th Avenue Drainage Improvements Owner Contact: City of Evans Scope of Work: Scope involved the demolition and replacement of existing bridge with a CIP 4 X 8 Concrete Box Culvert H + L Concrete, Inc , as the General Contractor, performed the entire excavation, subgrade replacement and prep, as well as the backfdl and final grading for the project The protect also involves guardrail construction, RCP, and nprap placement at FES outflow Two Rivers Parkway — Greeley/Loveland Canal Owner Contact: Weld County Scope of Work: Scope involved the excavation and prep for a CIP 8 X 10 Concrete Box Culvert H + L Concrete, Inc , as the General Contractor, completed the entire excavation, subgrade prep, and concrete construction for the project, Lower Shaw Heights Channel Improvements Owner Contact: Urban Drainage & Flood Control District/City of Westminster Scope of Work: Scope of work involved construction of an 8 X 10 CIP Concrete Box Culvert, three concrete drop structures, and a ramp and retaining wall system for maintenance access near 80th Avenue and Sheridan, in Westminster, Colorado H + L Concrete, Inc , built the structure while dealing with massive surges in stormwater runoff through the channel The protect also had the additional complexity of being built amidst apartment complexes and the UP railroad line on one side and commercial businesses on the other Punt The Creek, Phase II / III Owner Contact: Greenway Foundation Scope of Work: Scope of Work involved the construction of several concrete structures interlaced with a new bike trail near Lower Downtown Denver The work was performed as part of a total protect that diverted the Cherry Creek Channel and subsequently presented several water control challenges WORK EXPERIENCE H + L Concrete, Inc., Greeley, Colorado Owner - President CG&S Company, Greeley, Colorado Project Superintendent Cowan Concrete Inc, Greeley, Colorado Concrete Foreman Jerry Naranjo 1863n° Avenue Greeley, CO 80631 Office: (970) 356 - 7909 Education Bachelor of Science —Engineering —Civil Specialty Colorado school ofMines 1993 Professional Profile and Proiect Experience Naranjo Civil Constructors, Inc. — Genera/ Manager, Vice —President & Secretary, June 1999 — Present Currently responsible for all phases of project management, design -build services, estimating, business development, accounting, personnel management, and contract management. Experience summaries of major responsibilities are as follows. • Project Management. Currently responsible for construction projects totaling nearly 5 0 million per year in revenue Project management tasks include but are not limited to pre - construction meetings, submittals, materials purchasing, scheduling, utility locates and potholing services, subcontractor management, progress billing, and equipment and manpower allocation Also serves as the in-house engineer to troubleshoot technical problems on the plans and in the field, as well as providing surveying and takeoff support to the excavating and concrete crews. Tasked with promoting quality construction, safe working environments and ultimately project profitability • Design -Build Services. Offers small-scale design -build services to a select group of contractors normally related to drainage structures and solutions related to structural concrete. Design services have been offered using AutoCAD R14, photo/image editors and publishing software to produce high -end presentation style drawings for ownership review and acceptance. Subsequent "build" services are implemented from design and directly into the field. • Estimating. Obtains all quotes from suppliers and subcontractors for approximately 30 projects per month. Manages the database of quotes received over time by supplier by specification. Attends all pre -bid meetings on behalf of the organization and conducts thorough site investigations to troubleshoot conditions that could possibly impact the cost of construction. • Business Development. Responsible for assessing new business opportunities via public advertisements for bid, negotiated work with clients, and scanning contacts to develop new leads. Constructs all presentation materials for new client development with several software packages namely, Microsoft Office, Adobe Publisher, and AutoCAD R14. • Accounting. Responsible for tracking all accounting functions including but not limited to A/R, A/P, project cost tracking, payroll, and all federal, state and local taxation issues Also responsible for monthly, quarterly, and annual financial statements to be submitted to bonding and banking authorities Also develops budgets and revenue forecasts for internal review. • Personnel Management. Serves as new -hire screener in charge of selecting qualified applicants for various positions within the organization Responsible for all new hire reporting to the state as well as all personnel issues related to job performance evaluations, terminations, workman's compensation claims, and most importantly the redistribution of personnel to optimize crew performance. • Contract Management. Responsible for getting low -bid and negotiated work under contract. Responsibilities also include all tasks related to subcontracts, change orders, change of condition cost estimates, actual vs budget analysis, retainage issues, and punchlist management. Serves as the point person for all clients, engineers, and subcontractors. MORRISON KNUDSEN CORPORATION, Denver, Colorado Staff Engineer-1996-1999 Served as a Staff Engineer and consultant to the mining and construction industry Known in the industry to be one of the most advanced users of the Mincom mine planning software Extensive participation in developing feasibility studies and mine plans in Venezuela and Germany Also served long-term consulting contracts for onsite engineering and innovative solutions for BHP New Mexico Operations in Farmington, NM and ALCOA Sandow Mine in Rockdale, Texas Provided engineering and cost analysis to support potential and ongoing mining and construction projects internal and external to the organization. MORRISON KNUDSEN CORPORATION, Denver, Colorado Interim Office Manager - 1996 -1997 Responsible for starting the Mining Group's Denver Office, and developing a solid client base. Responsible for consulting revenues, marketing and development of future business, and the subsequent expansion of the office to include technical staff relocated from San Antonio, Texas. Also responsible for all administrative duties until support structures were in -place, and operational. MINCOM INC, Denver, Colorado Engineering Consultant -1995 -1996 Served as a software consultant to clients in Germany, Texas, New Mexico, and Pennsylvania, Mr Naranjo developed a strong background in the use of Mincom's Mine Planning and Geological Modeling Software. He was also heavily involved in marketing and sales, by serving as the company representative for software exhibits in multiple locations. He also completed a short-term assignment in Brisbane, Australia, working in the software development department, specifically responsible for the specifications and design of Mincom's user-friendly GTi environment. MORRISON KNUDSEN CORPORATION, Carlos, Texas Project Engineer-1993 -1995 Mr Naranjo provided dragline engineering and design support for a two-dragline (BE-1570) open - pit lignite operation. He was responsible for developing long-range mine planning, strategic development, and designed and implemented post -mining topography, including endlake and drainage design Mr Naranjo provided daily engineering support to the operations engineer and pit superintendents and completed a temporary assignment as night shift dragline superintendent. He was also responsible for the integration of state-of-the-art mining -software solutions in the mining engineering department. John Leone 1863n0 Avenue Greeley, CO 80631 Office: (970) 356 — 7909 ENGINEERING MANAGER/ESTIMATOR Education Bachelor of Science — Chemical Engineering & Petroleum Refining - Colorado School of Mines 1992 Professional Profile and Proiect Experience Naranjo Civil Constructors, Inc. — Engineering Manager November 2005 — Present Currently responsible for all phases of estimating and contract management. Also ad as project manager as needed. Experience summaries of major responsibilities are as follows: • Estimating. Obtains all quotes from suppliers and subcontractors for approximately 30 projects per month. Manages the database of quotes received over time by supplier by specification Attends all pre -bid meetings on behalf of the organization and conducts thorough site investigations to troubleshoot conditions that could possibly impact the cost of construction. • Contract Management. Responsible for getting low -bid and negotiated work under contract. Responsibilities also include all tasks related to subcontracts, change orders, change of condition cost estimates, and actual vs budget analysis. • Business Development. Assists in assessing new business opportunities via public advertisements for bid, negotiated work with clients, and scanning contacts to develop new leads. Constructs all presentation materials for new client development with several software packages namely, Microsoft Office, Adobe Publisher. Aggregate Industries, Greeley, Colorado Estimating Manager — 2004-2005 Served as head estimator and project manager for Aggregate Industries Greeley Contracting Division. Projects ranged in size from $5000 to $5,500,000. Projects included both private and public projects including CDOT projects Projects estimated and managed included projects with up to 10 subcontractors. Responsible for obtaining all quotes from suppliers and subcontractors, attending all pre -bid meetings on behalf of the organization, getting subcontractors under contract, and managing projects in the construction phase. J-2 Contracting Company, Greeley, Colorado Estimator/Project Manager/Owner—1996-2004 Responsible for estimating and managing projects totaling $6,000,000 per year Projects ranged in size from $5000 to $3,300,000. Projects included both private and public projects including CDOT projects. Approximately $2,000,000 of yearly revenue was subcontracted. Responsible for obtaining all quotes from suppliers and subcontractors, attending all pre -bid meetings on behalf of the organization, getting subcontractors under contract, and managing project in the construction phase. References • City of Greeley, Mike Bedell, Project Engineer (970) 336-4125 • Town of Parker, Tom Williams, Storm Water Engineer (303) 840-9546 • City of Evans, Dawn Anderson, Engineer (970) 475-1160 Christine Warner 1863"' Avenue Greeley, CO 80631 Office: (970) 356 - 7909 Education Traffic Control Supervisor Training, Erosion Control Supervisor Training, Project Management Certification through Grow Colorado, Payroll — Labor Compliance through Colorado Department of Transportation. Professional Profile and Proiect Experience Naranjo Civil Constructors, Inc. — Project Manager, Traffic Control Supervisor, Erosion Control Supervisor, Certified Payroll. May 2002 — Present Currently responsible for all phases of project management, traffic control supervisor, accounting, payroll, subcontractor management. Experience summaries of major responsibilities are as follows - Project Management. Currently responsible for construction projects totaling nearly 5.0 million per year in revenue Project management tasks include but are not limited to pre - construction meetings, submittals, materials purchasing, utility locates and potholing services, subcontractor management, and progress billing. Tasked with promoting quality construction, safe working environments and ultimately project profitability. Traffic Control Supervisor. Responsible for drawing traffic control management plans, organizing traffic control equipment and maintaining a clean and safe worksite for all working personnel on our projects Accounting. Responsible for tracking all accounting functions including but not limited to A/R, A/P, project cost tracking, payroll, and all federal, state and local taxation issues. Also responsible for monthly, quarterly, and annual financial statements to be submitted to bonding and banking authorities Payroll. Responsible for all aspects of payroll Collecting time data from each project and properly allocating time to those projects Documenting and tracking proper employee codes for certified payroll • Subcontractor Management. Responsible for notifying and properly organizing subcontractors. Ordering materials for the project in a timely manner. Also acts as main point of contact for all suppliers and subcontractors on all projects Northern Colorado Traffic Control, Greeley, Colorado Traffic Control Supervisor —Scheduling Manager 1994 - 2002 Ms Warner managed several projects with as many as 20 employees on any one sight. Has a vast knowledge of traffic control, project management, safety, and organizational skills. SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. FG-479 ?VAV k NCy � P, -,Jo�q� VAP--'? VuA,NSTV-�Ct 7/96 Section 00430 Page 1 COLORADO DEPARTMENT OF TRANSPORTATION Project No - UNDERUTILIZED DBE (UDBE) BID AQC M455-070 CONDITIONS ASSURANCE LEMAY AVE AND SH14, FORT COLLINS, CO, LARIMER Instructions, Contractor — Complete and submit this form with your bid Report only Underutilized DBE (UDBE) participation percentages which qualify under the contract goal specification for this project It is important to review CDOT Form #715 instructions before completing this forth POLICY It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have equal opportunity to participate in the performance of contracts financed with federal, state or local entity funds UNDERUTILIZED DBE PARTICIPATION COMMITMENT 1) Will your company's Underublized DBE (UDBE) participation commitment meet contract goals'® Yes ❑ No 2) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below 30.0% 3 List the UDBE firms, committed work items, and eli ibis UDBE percent of your bid that ou are committinq to each UDBE FIRM NAME CERTIFICATION COMMITTED SUBCONTRACT ELIGIBLE UDBE % * EXP. DATE WORK ITEM(S) CATEGORY See Fwm #715 O Trucker 1 NARANJO CIVIL 09 / 30 / 08 �ane^t Ctv'P�cae. 0 Subcontractor 30.0 % CONSTRUCTORS, INC 0 Supplier ❑ Broker ❑ Trucker 2 I 1 ❑ Subcontractor % O Supplier ❑ Broker 0 Trucker 3 / / ❑ Subcontractor % ❑ Suppler ❑ Broker ❑ Trucker 4 / / ❑ Subcontractor % ❑ Supplier ❑ Broker Trucker 5 / / ❑ Subcontractor % ❑ Supplier 0 Broker BOX A- TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT 30.0 Round percentage amounts to the nearest hundredth) Additional instructions on how to calculate the actual eligible amounts and percentages for the trucker, subcontractor, supplier, and broker categories are available on the CDOT Form #715 and in the 'Counf rig DBE Participation Toward Contract Goals and CDOT's annual DBE goer section of the 'DBE — Definitions and Requirements' In the Standard Special Pmvisrons I understand that, if my company is determined to be the low bidder for the contract on this project, I must submit a completed CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed on this form to the Transportation Department by 4.00 pm on the third work day after the day bids are opened The actual amounts submitted on each CDOT Fomi #715 must equal or exceed the percentage commitments documented on this form. In addition, if my company does not meet the DBEIUDBE goat for this project, I must submit a completed CDOT Form #718 DBE GOOD FAITH EFFORT DOCUMENTATION before 4,00 pm on the day after bids are opened. CDOT Form 9715s submitted for firms not included on this form, OR for amounts exceeding those listed on this form, will be accepted but NOT counted as Good Faith Efforts. Only the efforts the contractor made prior to the bid opening will count as Good Faith Efforts. i understand my obligation to abide by the policy stated above. I shall not discriminate on the basis of race, color, age, sex, national origin, or handicap in the bidding process or the performance of contracts I DECLARE UNDER PENALITY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. Company Name' Date: H&L CONCRETE INC, D13A NA R CIVIL CONSTRUCTORS, INC 9 / 13 / 07 Company Officer . afire' Title: VP Previous edition: may not be used CDOT Form 714 1106 COLORADO DEPARTMENT OF TRANSPORTATION PROJEM N c t^ s5- o 0 ANTI -COLLUSION AFFIDAVIT LocanoN l.ICA,^_a A,,e FO'2T Crn-taN5 CQ l�.l i`�lT}2- CO ---74, I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on his or her behalf and on behalf of my firm I further attest that 1 The prices) and amount of this bid have been arrived at independently, without consultation, communication or agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder or potential prime bidder 2A Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or potential prime bidder on this project, and will not be so disclosed prior to bid opening 2B Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on this project have been disclosed to me or my firm 3A No attempt has been made to solicit, cause or induce any firm m or person who is a bidder or potential prime bidder to refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non- competitive bid or other form of complementary bid 3B No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project 4 The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom- petitive or other form of complementary bid 5 My fiirn has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or services from any firm or person, or offered, promised or paid cash or anything of value to any fine or person, whether in connection with this or any other project, in consideration for an agreement or promise by any firm or person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid or agreeing or promising to do so on this project 6 My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person, whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high, noncompetitive or other forth of complementary bid, or agreeing or promising to do so, on this project 7 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities relating to the preparation, approval or submission of my firm's bid on this project and have been advised by each of them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or other conduct inconsistent with any of the statements and representations made in this affidavit 8 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this contract I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE Connector's lion or orarparry name li * L Cot�c-� ---r= ltacTi By / D 'D7->h NA.cw�o Gv(L° Co�S�vv S,1Nc "e �P 2rM 000troc s fine or conwany name (H joint wntum ) By Dare Title � ....POE...... ¢'�� Sworn to before me this�;."day of, C�� 20 U I NMW PuMk Z I "Lna MY cpmnisslon copffe. = / ','�. NOTE: This document mus6fW,,s3f ned`• �-r I'll CDOT Form #M8 1102 COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTORS PERFORMANCE CAPABILITY STATEMENT Project# lkWr- t-A4ss- ono 1 List names of partnerships or joint ventures )( none 2 List decreases in the contractors fiscal or workmanship qualifications compared to the last prequalification statement submitted to CDOT (Attach additional sheets if necessary ) a Key personnel changes N none b Key equipment changes 14 none c Fiscal capability changes (legal actions, etc) none d Other changes that may effect the contractors ability to perform work none I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE Contractors firm or company name Rt L Corscvz�--t; lwc. By Date 9/ai lo-7 T 2nd Contractor's firm or company name (if joint venture) By Date Title CDOT Form #605 1192 COLORADO DEPARTMENT OF TRANSPORTATION PROJECT NO ASSIGNMENT OF ANTITRUST CLAIMS Contractor and Colorado Department of Transportation (CDOT) recognize that in actual economic practice antitrust violations ultimately impact on CDOT Therefore, for good cause and as consideration for executing this contract and for receiving payments hereunder 1 Contractor hereby irrevocably assigns to CDOT any and all claims it may now have or which may hereafter accrue to It under federal or state antitrust laws in connection with the particular project, goods or services purchased or acquired by CDOT pursuant to this contract 2 Contractor hereby expressly agrees a That, upon becoming aware that a third party has commenced a civil action asserting on Contractor's behalf an antitrust claim which has been assigned to CDOT hereunder, Contractor shall immediately advise In writing (1) Such third party that the antitrust claim has been assigned to CDOT, and (2) CDOT that such civil action Is pending and of the date on which, In accordance with subparagraph a (1) above, Contractor notified such third party that the antitrust claim had been assigned to CDOT, b To take no action which will in any way diminish the value of the claims or rights assigned or dedicated to CDOT hereunder, and c Promptly to pay over to CDOT its proper share of any payment under an antitrust claim brought on Contractor's behalf by any third party and which claim has been assigned to CDOT hereunder 3 Further, Contractor agrees that In the event It hires one or more subcontractors to perform any of Its duties under the contract, Contractor shall require that each such subcontractor a Irrevocably assign to CDOT (as a third party beneficiary) any and all claims that such subcontractor may have or which may thereafter accrue to the subcontractor under federal or state antitrust laws In connec- tion with any goods or services provided by the subcontractor in carrying out the subcontractor's obliga- tions to Contractor, b Upon becoming aware that a third party has commenced a civil action on the subcontractor's behalf asserting an antitrust claim which has been assigned to CDOT hereunder, shall immediately advise In writing (1) Such third party that the antitrust claim has been assigned to CDOT, and (2) Contractor and CDOT that such civil action Is pending and of the date on which, In accordance with subparagraph b (1) above, the subcontractor notified such third party that the antitrust claim had been assigned to CDOT, c Take no action which will In any way diminish the value of the claims or rights assigned or dedicated to CDOT hereunder, and d Promptly pay over to CDOT its proper share of any payment under an antitrust claim brought on the subcontractor's behalf by any third party and which claim has been assigned or dedicated to CDOT pursuant hereto I, acting in my capacity as officer of a bidder (bidders if a joint venture) do agree to the above assignment of antitrust claims Contractors firm or company name By Date Title 2nd contractors firm or company name (It lemt venture) By Defe Title C DOT Form #621 1 V91 FZC OJECT NO My55.070 COLORADO DEPARTMENT OF TRANSPORTATION ASSIGNMENT OF ANTITRUST CLAIMS Contractor and Colorado Department of Transportation (COOT) recognize that in actual economic practice antitrust violations ultimately impact on COOT Therefore, for good cause and as consideration for executing this contract and for receiving payments hereunder 1 Contractor hereby irrevocably assigns to COOT any and all claims it may now have or which may hereafter accrue to it under federal or state antitrust laws in connection with the particular project, goods or services purchased or acquired by COOT pursuant to this contract 2 Contractor hereby expressly agrees That, upon becoming aware that a third party has commenced a civil action asserting on Contractor's behalf an antitrust claim which has been assigned to COOT hereunder, Contractor shall immediately advise in writing (1) Such third party that the antitrust claim has been assigned to COOT, and (2) CDOT that such civil action is pending and of the date on which, in accordance with subparagraph a (1) above, Contractor notified such third party that the antitrust claim had been assigned to COOT, To take no action which will in any way diminish the value of the claims or rights assigned or dedicated to COOT hereunder, and Promptly to pay over to COOT its proper share of any payment under an antitrust claim brought on Contractor's behalf by any third parry and which claim has been assigned to COOT hereunder Further, Contractor agrees that in the event it hires one or more subcontractors to perform any of its duties under the contract, Contractor shall require that each such subcontractor a Irrevocably assign to COOT (as a third party beneficiary) any and all claims that such subcontractor may have or which may thereafter accrue to the subcontractor under federal or state antitrust laws in connec- tion with any goods or services provided by the subcontractor in carrying out the subcontractor's obliga- tions to Contractor, b Upon becoming aware that a third party has commenced a civil action on the subcontractor's behalf asserting an antitrust claim which has been assigned to COOT hereunder, shall immediately advise in writing (1) Such third party that the antitrust claim has been assigned to COOT, and (2) Contractor and COOT that such civil action is pending and of the date on which, in accordance with subparagraph b (1) above, the subcontractor notified such third party that the antitrust claim had been assigned to COOT, c Take no action which will in any way diminish the value of the claims or rights assigned or dedicated to COOT hereunder, and d Promptly pay over to COOT its proper share of any payment under an antitrust claim brought on the subcontractor's behalf by any third party and which claim has been assigned or dedicated to COOT pursuant hereto I, acting in my capacity as officer of a bidder (bidders if a joint venture) do agree to the above assignment of antitrust claims Contratlols nrtn or company name gy Dam H 4 L Con�r t�-E I ri c ��� ^ 912110 Title T" CWTF..#M IMI COLIORADO DEPARTMENT OF TRANSPORTATION CERTIFICATE OF PROPOSED project No.: AQC M 455 - 0-7 o UNDERUTILIZED DBE (UDBE) PARTICIPATION Project Code (SA#) IS153 LEMAv AvE Y SH Location. 1, CaLlbitJCo, ( FaLA .cote Form #. I of Prime Contractor- Send completed/signed form to the Business Programs Office (instructions on second page) The "Eligible UDBE Amounts" submitted on this form must equal or exceed the commdment(s) documented on the CDOT Form 714 you submitted with your bid For the complete list of certified DBE/UDBE firms and their DBE work codes go to http:/fwww.d0Ls1ate.co.us1app_u uc NOTE: See 49 CFR pad 26 55, and the "DBE - Definitions and RequiremenW in the Standard Special Provisions, for further information concerning counting DBE participation of truckers, subcontractors, suppliers and service providers toward the protect's UDBE goal PART 1a — TRUCKING CONTRACT If the UDBE is being used as a trucker for one or more "trucking" DBE work codes (25500, 25505 etc) then ACTUAL UDBE AMOUNT - Actual contract amount for the transportation services provided by the UDBE firm and any UDBE lessees. EUG/BLE UDBE TRUCKING AMOUNT= I (ACTUAL UDBE AMOUNT) - (Any non-UDBE lessee amounts In this contract)" I ' For work done on this UDBE contract with non-UDBE lessees, credit toward the project UDBE goal is given only for the broker fees or commissions the UDBE trucker receives for arranging the transportabons services, because the services themselves are being performed by non-UDBEs NAME OF UDBE FIRM CERTIFICATION # EXPIRATION DATE ELIGIBLE UDBE TRUCKING AMOUNT $ DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR: Complete list of work codes is at httpJAvww dot state cc us/app ucp/ PART 1 b —SUBCONTRACT ELIGIBLE UDBE SUBCONTRACT AMOUNT = I (Actual UDBE contract amount) - (Aril} rion=UDBE Wvvei tier amounts in this contract)' " Work that a UDBE subcontracts to a lower tier non-UDBE firm does not count toward the project UDBE goal,, NAME OF UDBE FIRM CERTIFICATION # EXPIRATION DATE „ `ELIGIBLE UDBE SUBCONTRACTAMOUNT NARAiJ�a Cava C0-3-R4wr n-S L I Pic l ouor �, u�q i 3a/��oo� $ I q oa l010, S t �a �wt- DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR Complete list of work codes is at httpLlvww dot state co ss/app�, ucpl✓ Zpsscior 2.O (yoci PART 1c — SUPPLY CONTRACT'S' If the supplier is a UDBE with'a ",Type" field of ','Manufacturer" for the item(s) ELIGIBLE UDBE SUPPLY AMOUNT,=,[ (Actual UDBE contract amount) X 100% If the supplier is a UD6E with a `Type" field of "Regular Deals ' for the item(s) ELIGIBLE UDBE SUPPLT AMOUNT = I (Actual UDBE contract amount) X 60% I NOTE If the supplier is a UDBE with a "Type" field of `Broker for the item(s) use PART Id- BROKER / SERVICE CONTRACT NAME OF UDBE FIRM CERTIFICATION # EXPIRATION DATE ELIGIBLE UDBE SUPPLY AMOUNT / I is DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR Complete fist of work codes is at http Gwww dot state co us/app ucp1 PART I — BROKER / SERVICE CONTRACT If purchasing materials or supplies through a UDBE with a "Type" field of "Broker, count only the amount of brokerage commission and/or delivery service fees included in the contract Other examples of services to include in this section are bonding, brokering, consulting, security guards, and Insurance etc ELIGIBLE UDBE SERVICE FEE AMOUNT= Actual compensation retained by the UDBE broker/agent for services rendered' ' The amounts that count toward UDBE goals are limited to the compensation retained by the UDBE broker/agent for services rendered, provided the fee/commission is determined by CDOT to be reasonable and not excessive as compared with fees customarily charged for similar services NAME OF UDBE FIRM CERTIFICATION # EXPIRATION DATE ELIGIBLE UDBE SERVICE FEE AMOUNT $ DBE WORK CODE NUMBER(S) THIS UDBE IS BEING USED FOR Complete list of work codes is at httpjA� dot state co uslapp_uclY Original - Business Programs Office Previous editions may not be used CDOT Form 715 - Page 1 of 2 1106 STATE OF COLORADO DEPARTMENT OF TRA114SPORTATION � OT Contracts and Market Analysts Branch AOC M455-070 4201 East Arkansas Avenue Lemay Ave @ Mulberry Street Denver, Colorado 80222 Project Code 15153 Telephone (303) 757-9736 Facsimile (303) 757-9868 RECEIVE=. September 24, 2007 Mr Jin Wang City of Fort Collins Engineering Dept P O Box 580 Fort C011111a, CO 80522-0580 Dear Mr Wang Based on my review of the financial statement dated Sept 21, 2007 and receipt of -CDOT Form 605, Contractors Performance Capability Statement -CDOT Form 606, Anti -Collusion Affidavit -CDOT Form 621, Assignment of Anti -Trust Claims and -Documentation of conformance with CDOT UDBE Contract Goal Policy, the City's award of Protect AQC M455-070 to Naranjo Civil Constructors is approved. Please include a copy of FHWA Form 1213 as part of your contract with Naranjo Civil Constructors Your cooperation in this matter is appreciated Sincerely, Richard CDOT Award Officer SECTION 00300 BID FORM SECTION 00300 BID FORM PROJECT:6062 Lemay Right Turn Lane at Mulberry Place Date cj/i3/0-7 A 1. In compliance with your Invitation to Bid dated ALY uiv ;1-JL, 200-7 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Baal Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of Fky£ P6CcL-4-1: OF A-1-4W;.ir $S.p ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: We5ss L-i.P b-oos fNmc'/� W-j 2:2.0 C.J �3ut1) 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespect.Lve of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through _ I . 7/96 Section 00300 Page 1 S BASE BID REVISED BID SCHEDULE ADDENDUMI 6062 Lemay Right Turn Lane at Mulberry Item # Item Unit Quantity Unit Cost Total 202-00000 Removal of Structures and Obstructions LS 1 ISAO i51ao'- 202-OW35 Removal of Concrete Pipe LF 99 I 5U j 1y33 4z 202-00200 Removal of Sidewalk SY 135 11 '-' I S 1 a.'" 202-00201 Removal of Curb LF 142 <4 ti�?- I;LA -0 202-00210 Removal of Conacte Pavement SY 164 25 -' L[ X ILI ti 202-00220 Removal ofAsphaft Mat SY 98 11SO 11;nj 202-00250 Removal of Pavement Marking SF 381 Aj %:!- -11 ' 202-0I000 Removal of Fence LF 23 I 'p DLC Z 203-01500 Binding HR 8 s049 1 DOO'- 208-00045 Concrete Washout Structure EACH 1 11pp4~ ''= 208-00050 Storm Dram Inlet Protection EACH 5 3(m jo5oo 208-00070 Stabilized Construction Entrance EACH 1 1 �= [ ' 1 `'- 210-01000 Reset Fence LF 236 [25, 210 1001 Modify Fence LF 3 = I 210-01700 Reset Sprinkler Hcad EACH 3 ) 2 `= t 210-017I0 Reset Valve EACH 2 3.36' Lo-7Lp 210-04010 Adjust Manhole EACH 1 1p 1 S_ I S 212-00006 Seeding (Native) ACRE 02 ;1.550- SJO's 212-00032 Soil Conditioning ACRE 02 -7&SC [rJ30'= 213.MM Mulching Weed Free) ACRE 02 S d St0 213-00061 Mulch Twktfier LB 40 304-06000 Aggregate Base Course Class 6 TON 254 3' = A DL55 403-32821 Hot Mix Asphalt (Grading SG) (1 W) (PO 58-28) TON 38 qis -3[y113 403-33851 Hot Mix Asphalt (Grading S) (100) (PG 64-28) TON 38 412-01020 Concrete Pavement (10 Inch) (Fast Track) SY 261 '=' - 412-01001 Concrete Pavement(10 Inch) (Colored) SY 18 603-01I50 15 Inch Reinforced Concrete Pipe LF 55 Jr- 4D 13 1"i 603-05015 15 Inch Reinforced Concrete End Section EACH 6 ci 20,13 608-00006 Concrete Sidewalk (61nch) SY 94 608-OW tO Concrete Curb Ramp SY 29 1 c; 609-21010 Curb and Gutter Type lI Section I-B) LF 111 609-21020 jCurb and Gutter T II(Section II-B) LF 482 -v I 'Ll 609-24002 Gutter Type II (2 Foot) LF 176 3= p `L° 610-00030 Medum Cover Material Concrete SF 1,354 '�-C14 'j -- 626-00000 Mobilization LS I j y 630-IWOS Traffic Control LS I 153Ctj 53CYJ"' 700-700I0 F/A Minor Contract Revisums FA 1 S10,00000 $10,00000 Total Bid Cost 155;A Total Bid Cost in Words: � Mai-C2w EiCrt q.rE T�,C.�O ;,j INFs"x MtsL-E-�7,1aUollars (For Performance and Payment Bonds) Force Account Total Bid Cost I SSc) r 700-700l6 F/A Fuel Cost Adjustment FA 1 51,500 00 $1,500 00 700-7W21 F/A On -The -Job Traince HOUR 0 $000 $000 700-70022 F/A O1T Colorado Tminm09111113FA 1 $150 00 $150 00 700-70380 F/A Erosion Control I FA 1 $I,OW 00 $1,000 W Total Contract Cost [ y Total Cost in Words: IIKW.M PRINTED NAME M*4-t s s-:&A - DATE NArcAN w Cpvti Cs�s' �.u'�i t I,.rc TITLE �\ Base Bid Item # Item Unit Quantity Umt Cost Total 202-00000 Removal of Structures and Obstructions LS 1 202-00035 Removal of Concrete Pipe LF 99 202-00200 Removal of Sidewalk SY 135 202-00201 Removal of Curb LF 142 202-00210 Removal of Concrete Pavement SY 164 202-00220 Removal of Asphalt Mat SY 98 202-00250 Removal of Pavement Marking SF 381 202-01000 Removal of Fence LF 23 203-01500 Blading HR 8 208-00045 Concrete Washout Structure EACH 208-00050 Storm Drain Inlet Protection EACH 5 209-00070 Stabd¢ed Construction Entrance EAC 1 210-01000 Reset Fence 236 210-01001 Modify Fence LF 3 210-01700 Reset Sprinkler HeadnLCB 3 210-01710 Reset Valve 2 210-04010 Adjust Manhole 1 212-00006 SeedingNative 02 212-00032 Soil Conditioning 02 213-00003 Mulching (Weed Free) 02 213-00061 Mulch Tackifier 40 304-06000 Aggregate Base Course lass 6) TON 254 403-32821 Hot Mix As haft G n SG 100 PG 58-28 TON 38 403-33851 Hot Mix Asphalt radio S 100 PG 64-28 TON 38 412-01020 Concrete Pav ent (10 Inch) (Fast Track) SY 261 412-01001 Concrete P ement (10 Inch) (Colored) SY 18 603-01150 15 Inch einforced Concrete Pipe LF 55 603-05015 151 w Reinforced Concrete End Section EACH 6 608-00006 2�ncr Is Sidewalk 6 Inch SY 94 608-00010 Concrete Curb Ramp SY 29 609-2101 Curb and Gutter Type It (Section I-B) LF 111 609-21 20 Curb and Gutter Type 11 (Section II-B) LF 482 609-24002 Gutter Type It (2 Foot) LF 176 610-00030 Median Cover Material (Concrete) SF 1,354 626-00000 Mobilization LS 1 630-10005 Traffic Control LS 1 7/96 Section 00300 Page 2