Loading...
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - EQUIPMENT MAINTENANCE PRACTICESEQUIPMENT MAINTENANCE PRACTICES All equipment maintenance is done by the C.P.N. golf course maintenance staff. The equipment is serviced based on an hours operated schedule supplied by the manufacturer. An inventory of frequently used parts is maintained in the maintenance shop and used for repairs. Repair parts can also be obtained from manufacturers within 24 to 48 hours. All equipment is fueled at the Parks Dept. Maintenance Shop which is adjacent to the golf course. Unleaded and diesel fuel is available from above ground tanks. An inventory of motor oils and greases is kept in the shop for use as needed. Any hazardous waste generated at the golf course is disposed of in compliance with E.P.A. (Environmental Protection Agency) regulations. Used oil products are recycled through the City Equipment Division Eacility. Pesticide residues and rinseates are either reapplied to the course or disposed of according to label directions. The use of contractors or outside personnel is limited to'major renovations such as building construction or parking lot and cart path renovation.