Loading...
HomeMy WebLinkAboutCHANGE ORDER - CONTRACT - FORT COLLINS LOVELAND AIRPORT REHABILIATE RECONSTRUCT TAXIWAY A CHANGE ORDER 5Change Order Number 5 March 8, 2007 PROJECT TITLE AND NUMBER: Rehabilitate and Reconstruct Taxiway A PURCHASE ORDER NUMBER: 1 Reason for Change — Runway 6-24 pavement is cracked and deteriorated badly and is in need of rehabilitation 2. Description of Change — Change order # 5 will add Schedule V Q to the project for rehabilitation of Runway 6-24 Rehabilitation will involve crack repair by crack filling on smaller cracks and full depth repair for larger cracks After crack repair, the runway will be paved with a 1 inch asphalt leveling course to provide abase for the stress absorbing fabric After construction of the leveling course, the runway will be covered with a stress absorbing fabric and over laid with a 2 5 inch asphalt concrete surface course Change order #5 will add quantities to the project for crack repair, asphalt cold planning to match existing asphalt, stress absorbing tabnc, asphalt, marking, and shoulder grading Change in Contract Cost—$301,976 00 (see attached table for breakdown of change order costs) Unit process used to determine the cost of the work are from the existing contract prices from the subject project 4 Change in Contract Time /Calendar Days 10 �J.t .0 Original Contract Cost: $4,908, t 17 50 Total Approved Change Orders: $ (92,192 45) Total Pending Change Orders: $ 000 Total This Change Order: $ 301,976 00 Adjusted Contract Cost: $ 5,117,901 05 (assuming all changed orders are approved) Submitted by Date Project Man a ger Reviewed/Approved by e // L� Date (21/i ZA 7 D ector V Approved by City Manager (if applicable) Date Change Order Number 5 March 8, 2007 This change order is accepted and the contract is amended to conform thereto, thi.%day 200 CITY OF LOVELAIID l�l by a 2 i� 0 JZ)/(l / . Type or print name CITCOL INS I by �-ji^°1P�^-Nc�tt,as�na TT pe or print name' ApprovW aw Yo i ur+nr: A-Wsitartt C4ty Attcww, COULSON EXCAVATION by Type or print name (�/GE PREs/d�n/T AppgOVED AS TO FORM BY ASSI.,. `.T CIT ;ITTC INFY Change Order #5 V H- Rnhand,tuh. Rnnwav 6.7d (Nnn_FMl roll ITEM NO DESCRIPTION UNIT Unit Price Quantity Amount P-101-5 4 Asphalt Cold Planing (Variable Depth) SY $5 00 715 $ 3,57500 P-101-5 11 Type 1 Asphalt Crack Repair LF $1 50 2,500 $ 3,75000 P-101-5 12 Type 2 Asphalt Crack Repair LF $12 41 2,100 $ 28,541 00 P-152-42 Borrow Excavation CY $600 275 $ 1,65000 P-152-4 3 Shouldering with Topsoil CY $5 00 740 $ 3,70000 P-310-51 Stress Absorbing Fabric SY $300 17,500 $ 52,50000 P-401-8 1 Btummous Paveinan TON $35 00 3,480 $ 121,800 00 P-401-8 2 Bituminous Material CON $362 00 210 $ 76,020 00 P-603-5 I Bituminous Tack Coal CAL $2 00 3,500 $ 7,00000 P-620-5 1 Permanent Pavement Marking SF $0 55 1,770 $ 97350 P-620-5 2 Temporary Pavement Marking SF $0 55 1,770 $ 973 50 T-901-5 1 Seeding with Hydromuleh AC $1,065 00 1 $ 1,49100 Total Schedule Vll $ 301,976.00