Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5858 MISC. STREET IMPROVEMENTS (2)Administrative Services Purchasing Division City of ForHCollins June 1, 2007 Connell Resources, Inc Attn William T Welch, Vice President 4305 East Harmony Road Fort Collins, CO 80528 RECEIVED JUN0 5 Nail (yvi te�J RE Renewal, 5858 Miscellaneous Street Improvements Dear Mr Welch The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per the existing terms and conditions and the following Prohibition Against Employing Illegal Aliens This paragraph shall apply to all Contractors whose performance of work under this Agreement does not involve the delivery of a specific end product other than reports that are merely incidental to the performance of said work Pursuant to Section 8-17 5-101, C R S , et seq , Contractor represents and agrees that A As of the date of this Agreement 1 Contractor does not knowingly employ or contract with an illegal alien, and 2 Contractor has participated or attempted to participate in the basic pilot employment verification program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the "Basic Pilot Program") in order to verify that Contractor does not employ any illegal aliens B Contractor shall not knowingly employ or contract with an illegal alien to perform works under this Agreement or enter into a contract with a subcontractor mac falls to cenry to Contractor that the subcontractor shall not knowingly employ or contract with an illegal alien to perform work under this Agreement C Contractor shall continue to apply to participate in the Basic Pilot Program and shall in 'writing verify same every three (3) calendar months thereafter, until Contractor is accepted or the public contract for services has been completed, whichever is earlier The requirements of this section shall not be required or effective if the Basic Pilot Program is discontinued D Contractor is prohibited from using Basic Pilot Program procedures to undertake pre- employment screening of lob applicants while this Agreement is being performed E If Contractor obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Contractor shall 215 North Mawn Street • 2nd Floor • I'O Box 580 • Fort Collins, CO 80922-0580 • (970) 221-677S • FAx (970) 221-o707 CONNELL RESOURCES, INC CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective March 1. 2007 All Rates are per hour except as noted MISCELLANEOUS Broom Asphalt Saw Compressor & Tools Ptckup Truck & Tools Fuel Truck $35 00 $65 00 $280 00 Day $14 00 $70 00 c \sherAc p\labor,egwp rates 2007 Notify such subcontractor and the City within three days that Contractor has actual knowledge that the subcontractor is employing or contracting with an illegal alien, and Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien, except that Contractor shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien F' Contractor shall comply with any reasonable request by the Colorado Department of Labor and Employment (the "Department") made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17 5-102 (5), C R S G If Contractor violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17 5-102, C R S the City may terminate this Agreement If this Agreement is so terminated, Contractor shall be liable for actual and consequential damages to the City arising out of Contractor's violation of Subsection 8-17 5-102, C R S H The City will notify the Office of the Secretary of State if Contractor violates this provision ' of this Agreement and the City terminates the Agreement for such breach The term will be extended for one (1) additional year, July 1, 2007 through July 1, 2008 If the renewal is acceptable to your firm, please sign this letter in the space provided and return it to the City of Fort Collins, Purchasing Division, P O Box 580, Fort Collins, CO 85022, within the next fifteen days If this extension is not agreeable with your firm, we ask that you send us a written notice stating that you do not wish to renew the contract and state the reason for non -renewal Please contact John D Stephen, CPPO, CPPB, Senior Buyer at (970) 221-6777 if you have any questions regarding this matter Sincerely, Ja e B O'Neill II, CPPO, FNIGP Dir or of Purchasing and Risk Management SignaturE DT ate (Please indicate your desire to renew 5858 by signing this letter and returning it to Purchasing Division within the next fifteen days ) JBO mar 5858 Miscellaneous Street Improvements Renewal 2007-2008 Connell Resources 2007-08 202-01 Remove pipe ADS-CMP-RCP-PVC-CLAY TILE 30 LF $5 94 $178 20 202-03 Remove Vertical Curb 137 LF $4 09 $560 33 202-04 Remove Roll Over Curb And Sidewalk 100 LF $5 63 $563 00 202-05 Remove Crosspan/Drivewa /Apron 150 SF $2 36 $354 00 202-06 Remove Concrete Paving 8" Avg Depth 400 SF $2 46 $984 00 202-07 Remove Asphalt 8" 50 SY $5 66 $283 00 202-08 Roto Mill Y-4" Asphalt 100 SY $4 38 $438 00 202-02 Plug Existing Pipe 12"-36" 1 JEACHI $186 07 $186 07 202-09 Profile Mill 0-3" 600 SY $1 72 $1,032 00 202-10 Remove Sidewalk 4"-6" 403 SF $1 81 $729 43 202-12 Remove RipRap 20 SY $1 81 $36 20 202-13 Remove Fence Various Types 100 LF $2 41 $241 00 202-14 Saw Cutting Existing Asphalt 100 LF $1 89 $189 00 203-01 Unclassified Excavation 115 CY $4 92 $565 80 203-02 Embankment ( CIP) 75 CY $3 40 $255 00 203-03 Borrow Suitable Fill Material 50 CY $14 00 $700 00 203-04 Haul Dispose 65 CY $6 61 $429 65 203-05 Topsoil (Stripping, Stockpiling, Placing) 75 CY $11 59 $869 25 203-06 Muck Excavation CIP) 50 CY $27 55 $1,377 50 203-07 Borrow ABC Class 5 or 6 (CIP) 50 Ton $15 55 $777 50 203-08 Borrow Fill R-25 50 CY $21 65 $1,082 50 203-09 Median Splash Block Shaping 500 SF $2 56 $1,280 00 203-10 Import Topsoil Screened 50 CY $47 19 $2,359 50 203-11 Potholing 10 EA $264 29 $2,642 90 1 206-01 Structure Excavation 50 CY $6 08 $304 00 206-02 Structure Backfill On Site Fill 50 CY $6 83 $341 50 206-03 Haul And Leveling 50 CY $15 97 $798 50 206-04 Structure Backfill Flow Fill 50 CY $75 25 $3,762 50 206-05 Filter material 1" 1/2 " washed rock 50 Ton $27 82 $1,391 00 206-06 Dewatering 15 Day $820 39 $12,305 85 i 208-02 Silt Fence Furnished And Installed (Minimum of $1500 per t 320 LF $2 25 $720 00 208-03 Straw Bales Furnished And Installed 10 LF $60 99 $609 90 208-04 Soil Retention Blanket 150 SY $4 59 $688 50 1 210-01 Adjust Valve Box 3 EA $240 27 $720 81 210-02 Adjust Manhole Ring/Cover 2 EA $428 30 $856 60 210-03 Modify Manhole 2 EA $1,035 69 $2,071 38 210-04 1 Relocate Fire Hydrant 1 EA $1,191 50 $1,191 50 210-05 Relocate Water Meter 1 EA $969 20 $969 20 210-06 Relocate C P Test Station 1 EA $815 68 $815 68 210-07 Irrigation Service (3/4"-1") 2 EA $1,871 00 $3,742 00 210-08 Relocate Fence Various Types 100 LF $5 46 $546 00 210-09 Relocate Mailbox (provide temporary service) 2 1 EA $366 00 $732 00 304-01 Aggregate Base CL 5-6 CIP 6") 50 Ton $17 36 $868 00 304-02 Shouldering Base Class 5-6- (41n) CIP 50 Ton $19 84 $992 00 304-03 Patch Placement Base CL-5-6 (6") CIP 50 Ton $34 86 $1,743 00 306-01 Reconditioning (8") 50 SY $3 08 $154 00 5858 Miscellaneous Street Improvements Renewal 2007=2008 Connell Resources 2007-08 Item Number Description Quantity Unit Unit Cost Total Cost 1 403-01 Asphalt Patching Grading S (Y Depth) 3 Ton $140 74 $422 22 403-02 Asphalt Patchinq Grading SG 6"-10" Depth 6 Ton $134 97 $809 82 403-03 Hot Bituminous Pavement - Grading S (W Depth) 50 Ton $72 01 $3,600 50 403-04 Hot Bituminous Pavement - Grading SG 4" Depth) 50 Ton $66 23 $3,311 50 403-05 Asphalt Paver Leveling Course SG 25 Ton $66 23 $1,655 75 403-06 jAsphalt Paver Patch Grading S Y depth 25 Ton $72 01 $1,800 25 412-01 Concrete Pavement 10" 75 SY $85 00 $6,375 00 412-02 Concrete Pavement 8" 175 SY $75 00 $13,125 00 420-01 Geotextile Stabilization Fabric 50 SY $5 98 $299 00 420-02 Geo-Grid Reinforcement 50 SY $10 01 $500 50 420-03 Geotextile Paving Fabric Up to 1000 SY 1 SY $3,640 00 $3,640 00 506-01 Rip Rap with Type II Bedding, Topsoil 10 SY $68 36 $683 60 1 603-01 12 CMP 27 Lf $38 44 $1,037 88 603-02 12" CMP FES 2 Ea $172 50 $345 00 603-03 24" CMP 30 EA $51 80 $1,554 00 603-04 24" CMP FES 2 LF $273 39 $546 78 603-05 12" Class III RCP 30 LF $35 67 $1,070 10 603-06 15 Class III RCP 30 LF $39 88 $1,196 40 603-07 18" Class III RCP 30 LF $45 42 $1,362 60 603-08 21" Class III RCP 30 LF $54 45 $1,633 50 603-09 24" Class III RCP 80 LF $62 68 $5,014 40 603-10 27" Class III RCP 30 LF $76 59 $2,297 70 603-11 • 30" Class III RCP 30 LF $83 73 $2,511 90 603-12 36" Class III RCP 30 LF $103 20 $3,096 00 603-13 42"Class III RCP 30 LF $126 26 $3,787 80 603-14 12 RCP Class III FES 2 EA $500 00 $1,000 00 603-15 15 RCP Class III FES 2 EA $500 00 $1,000 00 603-16 18" RCP Class III FES 2 EA $550 00 $1,100 00 603-17 21" RCP Class III FES 2 EA $650 00 $1,300 00 603-18 24" RCP Class III FES 2 EA $650 00 $1,300 00 603-19 27" RCP Class III FES 2 EA $780 00 $1,560 00 603-20 30" RCP Class III FES 2 EA $780 00 $1,560 00 603-21 36" RCP Class III FES 2 EA $1,247 98 $2,495 96 603-22 42" RCP Class III FES 2 EA $1,342 11 $2,684 22 603-23 24"x 38" RCP 30 LF $105 42 $3,162 60 603-24 24"x 38" RCP- FES 2 EA $788 58 $1,577 16 603-25 14" x2Y RCP 30 LF $76 53 $2,295 90 603-26 14"x 23" RCP FES 2 EA $592 09 $1,184 18 603-27 Trash Rack 2 EA $777 42 $1,554 84 603-28 15" ADS N-12 30 LF $33 26 $997 80 603-29 155 ADS FES 2 EA $279 43 $558 86 603-30 18" ADS Pipe N-12 30 LF $36 24 $1,087 20 603-31 118" ADS FES 2 EA $279 43 $558 86 603-32 24" ADS PipeN-12 30 LF $45 80 $1,374 00 606-33 24" ADS FES 2 EA $301 10 $602 20 603-34 36" ADS Pipe N-12 30 LF $72 09 $2,162 70 603-35 36" ADS FES 2 EA $509 46 $1,018 92 603-37 4" Sanitary Sewer Service (SDR-35) 30 LF $26 66 $799 80 5858 Miscellaneous Street Improvements Renewal 2607-2008 Connell Resources 2007-08 Item Number Description Quantity Unit Unit Cost Total Cost 603-38 6" Pvc Sanitary Sewer 30 LF $26 91 $807 30 603-39 8" Pvc Sanitary Sewer SDR-35) 30 LF $33 44 $1,003 20 603-40 Concrete Encasement 20 LF $90 42 $1,808 40 603-41 Concrete Cut Off Walls ditch crossing) 2 EA $4,500 00 $9,000 00 603-42 Pipe Headwall 2 EA $3,400 00 $6,800 00 603-43 4" Median Underdrain Pipe Perforated 30 LF $20 78 $623 40 603-44 4" Median Underdram Pipe Solid 30 1 LF 1 $20 77 $623 10 603-45 4" Clean Out 2 EA $380 87 $761 74 604-01 Type 3 Single Inlet 2 EA $2,597 54 $5,195 08 604-02 Type 3 Double Inlet 2 EA $3,851 19 $7,702 38 640-03 5' T pe R Inlet 2 EA $2,875 03 $5,750 06 604-04 10' T pe R Inlet 2 EA $4,621 65 $9,243 30 604-05 15' Type R Inlet 2 EA $5,846 98 $11,693 96 604-06 Combination Type 13 Inlet 2 1 EA 1$2,79438 $5,588 76 604-07 COFC Single Inlet Area Inlet 2 EA $2,511 97 $5,023 94 604-08 4' Diameter Manhole 2 EA $1,776 00 $3,552 00 604-09 5' Diameter Manhole 2 EA $2,628 55 $5,257 10 604-10 5' Diameter Manhole Drop 2 EA $3,128 90 $6,257 80 604-11 6' Diameter Manhole 2 EA $3,266 10 $6,532 20 607-01 Temporary Fence- Corral Fence 100 LF $20 87 $2,087 00 607-02 Temp Fence- Corral Panel + screen 100 LF 1 $26 24 $2,624 00 607-03 Privacy Fence 8' Cedar 100 LF $28 50 $2,850 00 607-04 Privacy Fence 6' Cedar 100 LF $23 70 $2,370 00 607-05 2 Rail Split 100 LF $14 87 $1,487 00 607-06 3 Railed Dowel Fence 100 LF $17 56 $1,756 00 607-07 4 Strand Barb Wire 100 LF $6 50 $650 00 607-08 Orange Safety Fence 100 LF $3 53 $353 00 1 608-01 Concrete Sidewalk (4") 500 SF $3 30 $1,650 00 608-02 Concrete Sidewalk (6") 935 SF $5 28 $4,936 80 608-03 Concrete Access Ramps with Colored Landings ( 6") 36 SF $9 85 $354 60 608-04 Concrete Drive A proach 6" 250 SF $6 77 $1,692 50 608-05 Drive Over Curb+Sidewalk 6") 200 SF $7 50 $1,500 00 608-06 Concrete Cross pans+Aprons (10") 390 SF $11 07 $4,317 30 608-07 Concrete Trickle Pan ( 4ft Wide 6" Thick) 760 SF $5 52 $4,195 20 608-08 Colored Concrete Bike Path 5" Fibermesh And Colored Yos( 1000 SF $6 90 $6,900 00 608-09 Bus Stop Pad 6" Flat Work 500 SF $6 25 $3,125 00 608-10 Pedestrian Refu a Islands 100 SF $9 75 $975 00 608-11 Hi -Early Concrete 24hr) 25 Cy $42 19 $1,054 75 608-12 Flow Fill 50 Cy $76 58 $3,829 00 609-01 Remove and Replace Concrete Curb and Gutter match exis 100 LF $36 10 $3,610 00 609-02 Vertical Curb+Gutter 30" 66 LF $22 60 $1,491 60 609-03 Outfall Curb+Gutter 18" 50 LF $21 08 $1,054 00 609-04 Rollover Curb+ Gutter 50 LF $22 49 $1,124 50 609-05 Driveway Curb Cuts 4 EA $218 14 $872 56 609-06 Asphalt Curb 150 LF $9191 $1,378 50 610-01 Exposed Aggregate Concrete Hardscape Medians 4" 250 SF $8 70 $2,175 00 610-02 1 Patterned Concrete (Stamped) 250 SF $13 44 $3,360 00 610-03 Interlocking Sidewalk Pavers -Type 1 250 SF $12 20 $3,050 00 I 5858 Miscellaneous Street Improvements Renewal 2007-2008 Connell Resources 2007-08 Item Number Description Quantity Unit Unit Cost Total Cost 619-01 6" DIP Class 52 And Poly Wrap 30 LF $37 98 $1,139 40 619-02 6"A" Tee 1 EA $340 23 $340 23 619-03 6"x6" Cross 1 EA $401 76 $401 76 619-04 6" 45` Bend 1 EA $286 30 $286 30 619-05 6" Gate Valve And Box 1 EA $864 61 $864 61 619-06 6" Mega Lugs Restraints 2 EA 1 $130 11 $260 22 619-07 6"x2" Blow Off 1 EA $1,028 07 $1,028 07 619-08 8" DIP Class 52 And Ploy Wrap 30 LF $43 49 $1,304 70 619-09 8"x6" Tee 1 EA $421 85 $421 85 619-10 8"x8" Cross 1 EA $437 93 $437 93 619-11 8" 45' Bend 1 EA $328 28 $328 28 619-12 8x2" Blow Off 1 EA $1,433 42 $1,433 42 619-13 8" PVC C-900 30 LF $30 00 $900 00 619-14 8" Gate Valve And Box 1 EA $1,245 93 $1,245 93 619-15 8" Mega Lugs Restraints 2 EA $153 19 $306 38 619-16 8" x2" Blow Off 1 EA $1,505 00 $1,505 00 619-17 Fire Hydrant 1 EA $2,525 19 $2,5- 19 619-18 6" Fire Hydrant Extension 1 EA 1 $539 20 $539 20 619-19 12" Fire Hydrant Extension 1 EA $667 00 $667 00 619-20 3/4" Copper Pipe 30 LF $26 90 $807 00 619-21 3/4" Corp Stop 1 EA $197 14 $197 14 619-22 3/4" Curb Stop 1 EA $237 11 $237 11 619-23 3/4" Meter Pit with 3/4" Yoke 1 EA $724 00 $724 00 619-24 1" Copper Pipe 30 LF $34 97 $1,049 10 619-25 1" Corp Stop 1 EA $207 35 $207 35 619-26 1" Curb Stop 1 I EA 1 $269 25 $269 25 619-27 1" Meter Pit with 3/4" Yoke 1 EA $608 45 $608 45 619-28 1" Air Vac Assembly 1 EA $3,823 00 $3,823 00 4000 Estimating 1 HR $55 62 $55 62 4002 Protect Management 1 HR $55 62 $55 62 4004 GPS Survey 1 HR $7,7 25 $77 25 5000 Mobilization (0-5 miles) 1 EA $1,564 55 $1,564 55 5002 Mobilization (6-10 miles) 1 EA $1,396 00 $1,396 00 5004 Mobilization (11-15 miles) 1 1 EA $2,346 85 $2,346 85 5006 Mobilization (15+ miles) 1 EA $3,520 63 $3,520 63 I I $0 00 $0 00 $0 00 $341,971 57 $0 00 $0 00 $341,961 57 Notes Protect management fees will be determined when scoping the miscellaneous protect with Connell Resources, Inc Mobilization will be charged for each protect Multiple mobilization charges may apply and should be determined when scoping the protect with Connell Resources, Inc See also Connell Resources, Inc's "Contractor Time and Material Labor and Equipment Rates for 2007" CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective March 1, 2007 All Rates are per hour except as noted weyTi7C7 Project Site Manager with Pickup Supervisor with Pickup Foreman - Pickup Truck with Tools Operator - Blade Operator- Lg Scraper,Loader, Dozer,Hoe Operator - Sm Scraper,Loader, Dozer,Hoe Operator - 815, Rex Compactors Operator - Disk, Skid Steer Operator - Paver, Screedman Operator - Paving Rollers, Sweeper Laborer - Asphalt Grade Checker Pipe Layer Laborer Field Mechanic Oder Straight Time $85 00 $70 00 $60 00 $43 00 $40 00 $37 00 $37 00 $32 00 $43 00 $40 00 $35 00 $38 00 $32 00 $29 00 $43 00 $40 0a Overtime $105 00 $90 00 $80 00 $58 00 $55 00 $52 00 $52 00 $47 00 $58 00 $55 00 $40 00 $53 00 $47 00 $44 00 $58 00 $55 00 Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours I during the week All units listed above will be an additional $15 00 per hour for overtime TRUCKS - Fueled, Operated & Maintained Tractor w/Low Boy $110 00 Tractor w/Rock Trailer $75 00 Tractor w/Flow Boy $75 00 Tractor w/Belly Dump $75 00 Tractor w/End Dump $75 00 Truck and Pup $75 00 Tandem Dump $65 00 Cat D350 Rock Truck $150 00 Cat 621 Water Wagon $150 00 Cat D25 Water Tanker $100 00 International Water Truck $85 00 GMC Water Truck $85 00 Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours I during the week All units listed above will be an additional $15 00 per hour for overtime c \shen\zip\labor equip rates 2037 CONNELL RESOURCES, INC CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective March 1, 2007 All Rates are per hour except as noted GRADING EQUIPMENT - Fueled & Maintained Scraper 631 E $180 00 Scraper 627E $180 00 Scraper623F $160 00 Scraper 615C $110 00 Scraper 613B $100 00 Scraper 613C $100 00 Blade 140G $85 00 Blade 140H $85 00 Blade 14H $110 00 Road Reclaimer -Dirt $130 00 Road Reclaimer - Asphalt $180 00 980 Loader $125 00 972 Loader $110 00 970 Loader $110 00 966 Loader $110 00 950 Loader $90 00 938 Loader $90 00 936 Loader $90 00 IT 28 Loader $90 00 John Deere 8650 with Disk $80 00 John Deere Landscape Loader $60 00 Skid Steer $37 00 D-9 Cat Dozer $170 00 D-8 Cat Dozer w/rippers $145 00 D-6 Cat Dozer $90 00 D-5 Cat Dozer $80 00 D-4 Cat Dozer $70 00 D-3 Cat Dozer $60 00 Bobcat 250 Track Skid Steer $50 00 EXCAVATION EQUIPMENT - Fueled & Maintained Komatsu PC600 $155 00 Komatsu PC400 $135 00 Komatsu PC300 $115 00 Komatsu PC220 $90 00 Komatsu PC200 $85 00 Komatsu PC150 $75 00 Komatsu PC200 W/Hammer $115 00 Cat 350 Excavator $135 00 c lshen\apUabor,egwp rates 2007 Rock $210 CO $185 00 CONNELL RESOURCES, INC CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective March 1, 2007 All Rates are per hour except as noted Cat 330 Excavator $115 00 Cat 325 Excavator $1D5 00 Cat 320 Excavator $95 00 Cat M318 Wheel Excavator $85 00 Cat 436 Backhoe $70 00 Cat426 Backhoe $65 00 Cat416 Backhoe $65 00 PUMPS Y $30 00 4" $35 00 5" $40 00 101, $55 00 PAVING EQUIPMENT - Fueled & Maintained Paving Machine Cat AP1055B $140 00 Paving Machine LeeBoy 8500 $75 00 Paving Machine Blaw Knox 4410 $115 00 Gilcrest 813 Pro Paver $65 00 Roadtec RX700 Profiler $500 00 Power Curber 150 $80 00 Johnson Street Sweeper $90 00 Crew Truck & Tools $200 00 Day Tack $3 00 Gal Distributor Truck $60 00 ROLLER EQUIPMENT - Fueled & Maintained 815B Sheepsfoot Compactor $115 00 Ing Rand 122FB Compactor $90 00 Rex 3-35 Compactor $85 00 Dynapac CA151 Vibratory Roller $65 00 Dynapac CA151 Compactor $65 00 Cat CP323 Compactor $50 00 Cat CP434 Smooth Drum $65 00 Cat CB 334E $45 00 Cat CB 224C $38 00 Cat CB 225E $30 00 Hypac 530A Rubber Roller $45 00 Hyster 0766 Roller $70 00 Dynapac Roller,CC21,CC101,CC122 $37 00 Ing Rand DD32 Asphalt Roller $37 00 c %shen\apRabor,egwp rates 2007