HomeMy WebLinkAboutCORRESPONDENCE - BID - 5858 MISC. STREET IMPROVEMENTS (2)Administrative Services
Purchasing Division
City of ForHCollins
June 1, 2007
Connell Resources, Inc
Attn William T Welch, Vice President
4305 East Harmony Road
Fort Collins, CO 80528
RECEIVED JUN0 5
Nail (yvi te�J
RE Renewal, 5858 Miscellaneous Street Improvements
Dear Mr Welch
The City of Fort Collins wishes to extend the agreement term for the above captioned proposal
per the existing terms and conditions and the following
Prohibition Against Employing Illegal Aliens This paragraph shall apply to all Contractors
whose performance of work under this Agreement does not involve the delivery of a specific end
product other than reports that are merely incidental to the performance of said work Pursuant
to Section 8-17 5-101, C R S , et seq , Contractor represents and agrees that
A As of the date of this Agreement
1 Contractor does not knowingly employ or contract with an illegal alien, and
2 Contractor has participated or attempted to participate in the basic pilot employment
verification program created in Public Law 208, 104th Congress, as amended, and
expanded in Public Law 156, 108th Congress, as amended, administered by the
United States Department of Homeland Security (the "Basic Pilot Program") in order
to verify that Contractor does not employ any illegal aliens
B Contractor shall not knowingly employ or contract with an illegal alien to perform works
under this Agreement or enter into a contract with a subcontractor mac falls to cenry to
Contractor that the subcontractor shall not knowingly employ or contract with an illegal
alien to perform work under this Agreement
C Contractor shall continue to apply to participate in the Basic Pilot Program and shall in
'writing verify same every three (3) calendar months thereafter, until Contractor is
accepted or the public contract for services has been completed, whichever is earlier
The requirements of this section shall not be required or effective if the Basic Pilot
Program is discontinued
D Contractor is prohibited from using Basic Pilot Program procedures to undertake pre-
employment screening of lob applicants while this Agreement is being performed
E If Contractor obtains actual knowledge that a subcontractor performing work under this
Agreement knowingly employs or contracts with an illegal alien, Contractor shall
215 North Mawn Street • 2nd Floor • I'O Box 580 • Fort Collins, CO 80922-0580 • (970) 221-677S • FAx (970) 221-o707
CONNELL RESOURCES, INC
CONTRACTORS TIME AND MATERIAL
LABOR AND EQUIPMENT RATES
Effective March 1. 2007
All Rates are per hour except as noted
MISCELLANEOUS
Broom
Asphalt Saw
Compressor & Tools
Ptckup Truck & Tools
Fuel Truck
$35 00
$65 00
$280 00 Day
$14 00
$70 00
c \sherAc p\labor,egwp rates 2007
Notify such subcontractor and the City within three days that Contractor has actual
knowledge that the subcontractor is employing or contracting with an illegal alien, and
Terminate the subcontract with the subcontractor if within three days of receiving the
notice required pursuant to this section the subcontractor does not cease employing
or contracting with the illegal alien, except that Contractor shall not terminate the
contract with the subcontractor if during such three days the subcontractor provides
information to establish that the subcontractor has not knowingly employed or
contracted with an illegal alien
F' Contractor shall comply with any reasonable request by the Colorado Department of
Labor and Employment (the "Department") made in the course of an investigation that the
Department undertakes or is undertaking pursuant to the authority established in
Subsection 8-17 5-102 (5), C R S
G If Contractor violates any provision of this Agreement pertaining to the duties imposed by
Subsection 8-17 5-102, C R S the City may terminate this Agreement If this Agreement
is so terminated, Contractor shall be liable for actual and consequential damages to the
City arising out of Contractor's violation of Subsection 8-17 5-102, C R S
H The City will notify the Office of the Secretary of State if Contractor violates this provision
' of this Agreement and the City terminates the Agreement for such breach
The term will be extended for one (1) additional year, July 1, 2007 through July 1, 2008
If the renewal is acceptable to your firm, please sign this letter in the space provided and return
it to the City of Fort Collins, Purchasing Division, P O Box 580, Fort Collins, CO 85022, within
the next fifteen days
If this extension is not agreeable with your firm, we ask that you send us a written notice stating
that you do not wish to renew the contract and state the reason for non -renewal
Please contact John D Stephen, CPPO, CPPB, Senior Buyer at (970) 221-6777 if you have
any questions regarding this matter
Sincerely,
Ja e B O'Neill II, CPPO, FNIGP
Dir or of Purchasing and Risk Management
SignaturE DT ate
(Please indicate your desire to renew 5858 by signing this letter and returning it to Purchasing
Division within the next fifteen days )
JBO mar
5858 Miscellaneous Street Improvements Renewal 2007-2008
Connell Resources 2007-08
202-01
Remove pipe ADS-CMP-RCP-PVC-CLAY TILE
30
LF
$5 94
$178 20
202-03
Remove Vertical Curb
137
LF
$4 09
$560 33
202-04
Remove Roll Over Curb And Sidewalk
100
LF
$5 63
$563 00
202-05
Remove Crosspan/Drivewa /Apron
150
SF
$2 36
$354 00
202-06
Remove Concrete Paving 8" Avg Depth
400
SF
$2 46
$984 00
202-07
Remove Asphalt 8"
50
SY
$5 66
$283 00
202-08
Roto Mill Y-4" Asphalt
100
SY
$4 38
$438 00
202-02
Plug Existing Pipe 12"-36"
1
JEACHI
$186 07
$186 07
202-09
Profile Mill 0-3"
600
SY
$1 72
$1,032 00
202-10
Remove Sidewalk 4"-6"
403
SF
$1 81
$729 43
202-12
Remove RipRap
20
SY
$1 81
$36 20
202-13
Remove Fence Various Types
100
LF
$2 41
$241 00
202-14
Saw Cutting Existing Asphalt
100
LF
$1 89
$189 00
203-01
Unclassified Excavation
115
CY
$4 92
$565 80
203-02
Embankment ( CIP)
75
CY
$3 40
$255 00
203-03
Borrow Suitable Fill Material
50
CY
$14 00
$700 00
203-04
Haul Dispose
65
CY
$6 61
$429 65
203-05
Topsoil (Stripping, Stockpiling, Placing)
75
CY
$11 59
$869 25
203-06
Muck Excavation CIP)
50
CY
$27 55
$1,377 50
203-07
Borrow ABC Class 5 or 6 (CIP)
50
Ton
$15 55
$777 50
203-08
Borrow Fill R-25
50
CY
$21 65
$1,082 50
203-09
Median Splash Block Shaping
500
SF
$2 56
$1,280 00
203-10
Import Topsoil Screened
50
CY
$47 19
$2,359 50
203-11
Potholing
10
EA
$264 29
$2,642 90
1
206-01
Structure Excavation
50
CY
$6 08
$304 00
206-02
Structure Backfill On Site Fill
50
CY
$6 83
$341 50
206-03
Haul And Leveling
50
CY
$15 97
$798 50
206-04
Structure Backfill Flow Fill
50
CY
$75 25
$3,762 50
206-05
Filter material 1" 1/2 " washed rock
50
Ton
$27 82
$1,391 00
206-06
Dewatering
15
Day
$820 39
$12,305 85
i
208-02
Silt Fence Furnished And Installed (Minimum of $1500 per t
320
LF
$2 25
$720 00
208-03
Straw Bales Furnished And Installed
10
LF
$60 99
$609 90
208-04
Soil Retention Blanket
150
SY
$4 59
$688 50
1
210-01
Adjust Valve Box
3
EA
$240 27
$720 81
210-02
Adjust Manhole Ring/Cover
2
EA
$428 30
$856 60
210-03
Modify Manhole
2
EA
$1,035 69
$2,071 38
210-04
1 Relocate Fire Hydrant
1
EA
$1,191 50
$1,191 50
210-05
Relocate Water Meter
1
EA
$969 20
$969 20
210-06
Relocate C P Test Station
1
EA
$815 68
$815 68
210-07
Irrigation Service (3/4"-1")
2
EA
$1,871 00
$3,742 00
210-08
Relocate Fence Various Types
100
LF
$5 46
$546 00
210-09
Relocate Mailbox (provide temporary service)
2
1 EA
$366 00
$732 00
304-01
Aggregate Base CL 5-6 CIP 6")
50
Ton
$17 36
$868 00
304-02
Shouldering Base Class 5-6- (41n) CIP
50
Ton
$19 84
$992 00
304-03
Patch Placement Base CL-5-6 (6") CIP
50
Ton
$34 86
$1,743 00
306-01
Reconditioning (8")
50
SY
$3 08
$154 00
5858 Miscellaneous Street Improvements Renewal 2007=2008
Connell Resources 2007-08
Item Number
Description
Quantity
Unit
Unit Cost
Total Cost
1
403-01
Asphalt Patching Grading S (Y Depth)
3
Ton
$140 74
$422 22
403-02
Asphalt Patchinq Grading SG 6"-10" Depth
6
Ton
$134 97
$809 82
403-03
Hot Bituminous Pavement - Grading S (W Depth)
50
Ton
$72 01
$3,600 50
403-04
Hot Bituminous Pavement - Grading SG 4" Depth)
50
Ton
$66 23
$3,311 50
403-05
Asphalt Paver Leveling Course SG
25
Ton
$66 23
$1,655 75
403-06
jAsphalt Paver Patch Grading S Y depth
25
Ton
$72 01
$1,800 25
412-01
Concrete Pavement 10"
75
SY
$85 00
$6,375 00
412-02
Concrete Pavement 8"
175
SY
$75 00
$13,125 00
420-01
Geotextile Stabilization Fabric
50
SY
$5 98
$299 00
420-02
Geo-Grid Reinforcement
50
SY
$10 01
$500 50
420-03
Geotextile Paving Fabric Up to 1000 SY
1
SY
$3,640 00
$3,640 00
506-01
Rip Rap with Type II Bedding, Topsoil
10
SY
$68 36
$683 60
1
603-01
12 CMP
27
Lf
$38 44
$1,037 88
603-02
12" CMP FES
2
Ea
$172 50
$345 00
603-03
24" CMP
30
EA
$51 80
$1,554 00
603-04
24" CMP FES
2
LF
$273 39
$546 78
603-05
12" Class III RCP
30
LF
$35 67
$1,070 10
603-06
15 Class III RCP
30
LF
$39 88
$1,196 40
603-07
18" Class III RCP
30
LF
$45 42
$1,362 60
603-08
21" Class III RCP
30
LF
$54 45
$1,633 50
603-09
24" Class III RCP
80
LF
$62 68
$5,014 40
603-10
27" Class III RCP
30
LF
$76 59
$2,297 70
603-11 •
30" Class III RCP
30
LF
$83 73
$2,511 90
603-12
36" Class III RCP
30
LF
$103 20
$3,096 00
603-13
42"Class III RCP
30
LF
$126 26
$3,787 80
603-14
12 RCP Class III FES
2
EA
$500 00
$1,000 00
603-15
15 RCP Class III FES
2
EA
$500 00
$1,000 00
603-16
18" RCP Class III FES
2
EA
$550 00
$1,100 00
603-17
21" RCP Class III FES
2
EA
$650 00
$1,300 00
603-18
24" RCP Class III FES
2
EA
$650 00
$1,300 00
603-19
27" RCP Class III FES
2
EA
$780 00
$1,560 00
603-20
30" RCP Class III FES
2
EA
$780 00
$1,560 00
603-21
36" RCP Class III FES
2
EA
$1,247 98
$2,495 96
603-22
42" RCP Class III FES
2
EA
$1,342 11
$2,684 22
603-23
24"x 38" RCP
30
LF
$105 42
$3,162 60
603-24
24"x 38" RCP- FES
2
EA
$788 58
$1,577 16
603-25
14" x2Y RCP
30
LF
$76 53
$2,295 90
603-26
14"x 23" RCP FES
2
EA
$592 09
$1,184 18
603-27
Trash Rack
2
EA
$777 42
$1,554 84
603-28
15" ADS N-12
30
LF
$33 26
$997 80
603-29
155 ADS FES
2
EA
$279 43
$558 86
603-30
18" ADS Pipe N-12
30
LF
$36 24
$1,087 20
603-31
118" ADS FES
2
EA
$279 43
$558 86
603-32
24" ADS PipeN-12
30
LF
$45 80
$1,374 00
606-33
24" ADS FES
2
EA
$301 10
$602 20
603-34
36" ADS Pipe N-12
30
LF
$72 09
$2,162 70
603-35
36" ADS FES
2
EA
$509 46
$1,018 92
603-37
4" Sanitary Sewer Service (SDR-35)
30
LF
$26 66
$799 80
5858 Miscellaneous Street Improvements Renewal 2607-2008
Connell Resources 2007-08
Item Number
Description
Quantity
Unit
Unit Cost
Total Cost
603-38
6" Pvc Sanitary Sewer
30
LF
$26 91
$807 30
603-39
8" Pvc Sanitary Sewer SDR-35)
30
LF
$33 44
$1,003 20
603-40
Concrete Encasement
20
LF
$90 42
$1,808 40
603-41
Concrete Cut Off Walls ditch crossing)
2
EA
$4,500 00
$9,000 00
603-42
Pipe Headwall
2
EA
$3,400 00
$6,800 00
603-43
4" Median Underdrain Pipe Perforated
30
LF
$20 78
$623 40
603-44
4" Median Underdram Pipe Solid
30
1 LF
1 $20 77
$623 10
603-45
4" Clean Out
2
EA
$380 87
$761 74
604-01
Type 3 Single Inlet
2
EA
$2,597 54
$5,195 08
604-02
Type 3 Double Inlet
2
EA
$3,851 19
$7,702 38
640-03
5' T pe R Inlet
2
EA
$2,875 03
$5,750 06
604-04
10' T pe R Inlet
2
EA
$4,621 65
$9,243 30
604-05
15' Type R Inlet
2
EA
$5,846 98
$11,693 96
604-06
Combination Type 13 Inlet
2
1 EA
1$2,79438
$5,588 76
604-07
COFC Single Inlet Area Inlet
2
EA
$2,511 97
$5,023 94
604-08
4' Diameter Manhole
2
EA
$1,776 00
$3,552 00
604-09
5' Diameter Manhole
2
EA
$2,628 55
$5,257 10
604-10
5' Diameter Manhole Drop
2
EA
$3,128 90
$6,257 80
604-11
6' Diameter Manhole
2
EA
$3,266 10
$6,532 20
607-01
Temporary Fence- Corral Fence
100
LF
$20 87
$2,087 00
607-02
Temp Fence- Corral Panel + screen
100
LF
1 $26 24
$2,624 00
607-03
Privacy Fence 8' Cedar
100
LF
$28 50
$2,850 00
607-04
Privacy Fence 6' Cedar
100
LF
$23 70
$2,370 00
607-05
2 Rail Split
100
LF
$14 87
$1,487 00
607-06
3 Railed Dowel Fence
100
LF
$17 56
$1,756 00
607-07
4 Strand Barb Wire
100
LF
$6 50
$650 00
607-08
Orange Safety Fence
100
LF
$3 53
$353 00
1
608-01
Concrete Sidewalk (4")
500
SF
$3 30
$1,650 00
608-02
Concrete Sidewalk (6")
935
SF
$5 28
$4,936 80
608-03
Concrete Access Ramps with Colored Landings ( 6")
36
SF
$9 85
$354 60
608-04
Concrete Drive A proach 6"
250
SF
$6 77
$1,692 50
608-05
Drive Over Curb+Sidewalk 6")
200
SF
$7 50
$1,500 00
608-06
Concrete Cross pans+Aprons (10")
390
SF
$11 07
$4,317 30
608-07
Concrete Trickle Pan ( 4ft Wide 6" Thick)
760
SF
$5 52
$4,195 20
608-08
Colored Concrete Bike Path 5" Fibermesh And Colored Yos(
1000
SF
$6 90
$6,900 00
608-09
Bus Stop Pad 6" Flat Work
500
SF
$6 25
$3,125 00
608-10
Pedestrian Refu a Islands
100
SF
$9 75
$975 00
608-11
Hi -Early Concrete 24hr)
25
Cy
$42 19
$1,054 75
608-12
Flow Fill
50
Cy
$76 58
$3,829 00
609-01
Remove and Replace Concrete Curb and Gutter match exis
100
LF
$36 10
$3,610 00
609-02
Vertical Curb+Gutter 30"
66
LF
$22 60
$1,491 60
609-03
Outfall Curb+Gutter 18"
50
LF
$21 08
$1,054 00
609-04
Rollover Curb+ Gutter
50
LF
$22 49
$1,124 50
609-05
Driveway Curb Cuts
4
EA
$218 14
$872 56
609-06
Asphalt Curb
150
LF
$9191
$1,378 50
610-01
Exposed Aggregate Concrete Hardscape Medians 4"
250
SF
$8 70
$2,175 00
610-02
1 Patterned Concrete (Stamped)
250
SF
$13 44
$3,360 00
610-03
Interlocking Sidewalk Pavers -Type 1
250
SF
$12 20
$3,050 00
I
5858 Miscellaneous
Street Improvements Renewal 2007-2008
Connell Resources 2007-08
Item Number
Description
Quantity
Unit
Unit Cost
Total Cost
619-01
6" DIP Class 52 And Poly Wrap
30
LF
$37 98
$1,139 40
619-02
6"A" Tee
1
EA
$340 23
$340 23
619-03
6"x6" Cross
1
EA
$401 76
$401 76
619-04
6" 45` Bend
1
EA
$286 30
$286 30
619-05
6" Gate Valve And Box
1
EA
$864 61
$864 61
619-06
6" Mega Lugs Restraints
2
EA
1 $130 11
$260 22
619-07
6"x2" Blow Off
1
EA
$1,028 07
$1,028 07
619-08
8" DIP Class 52 And Ploy Wrap
30
LF
$43 49
$1,304 70
619-09
8"x6" Tee
1
EA
$421 85
$421 85
619-10
8"x8" Cross
1
EA
$437 93
$437 93
619-11
8" 45' Bend
1
EA
$328 28
$328 28
619-12
8x2" Blow Off
1
EA
$1,433 42
$1,433 42
619-13
8" PVC C-900
30
LF
$30 00
$900 00
619-14
8" Gate Valve And Box
1
EA
$1,245 93
$1,245 93
619-15
8" Mega Lugs Restraints
2
EA
$153 19
$306 38
619-16
8" x2" Blow Off
1
EA
$1,505 00
$1,505 00
619-17
Fire Hydrant
1
EA
$2,525 19
$2,5- 19
619-18
6" Fire Hydrant Extension
1
EA
1 $539 20
$539 20
619-19
12" Fire Hydrant Extension
1
EA
$667 00
$667 00
619-20
3/4" Copper Pipe
30
LF
$26 90
$807 00
619-21
3/4" Corp Stop
1
EA
$197 14
$197 14
619-22
3/4" Curb Stop
1
EA
$237 11
$237 11
619-23
3/4" Meter Pit with 3/4" Yoke
1
EA
$724 00
$724 00
619-24
1" Copper Pipe
30
LF
$34 97
$1,049 10
619-25
1" Corp Stop
1
EA
$207 35
$207 35
619-26
1" Curb Stop
1
I EA
1 $269 25
$269 25
619-27
1" Meter Pit with 3/4" Yoke
1
EA
$608 45
$608 45
619-28
1" Air Vac Assembly
1
EA
$3,823 00
$3,823 00
4000
Estimating
1
HR
$55 62
$55 62
4002
Protect Management
1
HR
$55 62
$55 62
4004
GPS Survey
1
HR
$7,7 25
$77 25
5000
Mobilization (0-5 miles)
1
EA
$1,564 55
$1,564 55
5002
Mobilization (6-10 miles)
1
EA
$1,396 00
$1,396 00
5004
Mobilization (11-15 miles)
1 1
EA
$2,346 85
$2,346 85
5006
Mobilization (15+ miles)
1
EA
$3,520 63
$3,520 63
I
I
$0 00
$0 00
$0 00
$341,971 57
$0 00
$0 00
$341,961 57
Notes Protect management fees will be determined when scoping the miscellaneous protect with Connell
Resources, Inc
Mobilization will be charged for each protect Multiple mobilization charges may apply and should be
determined when scoping the protect with Connell Resources, Inc
See also Connell Resources, Inc's "Contractor Time and Material Labor and Equipment Rates for 2007"
CONNELL RESOURCES, INC.
CONTRACTORS TIME AND MATERIAL
LABOR AND EQUIPMENT RATES
Effective March 1, 2007
All Rates are per hour except as noted
weyTi7C7
Project Site Manager with Pickup
Supervisor with Pickup
Foreman - Pickup Truck with Tools
Operator - Blade
Operator- Lg Scraper,Loader, Dozer,Hoe
Operator - Sm Scraper,Loader, Dozer,Hoe
Operator - 815, Rex Compactors
Operator - Disk, Skid Steer
Operator - Paver, Screedman
Operator - Paving Rollers, Sweeper
Laborer - Asphalt
Grade Checker
Pipe Layer
Laborer
Field Mechanic
Oder
Straight Time
$85 00
$70 00
$60 00
$43 00
$40 00
$37 00
$37 00
$32 00
$43 00
$40 00
$35 00
$38 00
$32 00
$29 00
$43 00
$40 0a
Overtime
$105 00
$90 00
$80 00
$58 00
$55 00
$52 00
$52 00
$47 00
$58 00
$55 00
$40 00
$53 00
$47 00
$44 00
$58 00
$55 00
Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours I
during the week All units listed above will be an additional $15 00 per hour for overtime
TRUCKS - Fueled, Operated & Maintained
Tractor w/Low Boy
$110 00
Tractor w/Rock Trailer
$75 00
Tractor w/Flow Boy
$75 00
Tractor w/Belly Dump
$75 00
Tractor w/End Dump
$75 00
Truck and Pup
$75 00
Tandem Dump
$65 00
Cat D350 Rock Truck
$150 00
Cat 621 Water Wagon
$150 00
Cat D25 Water Tanker
$100 00
International Water Truck
$85 00
GMC Water Truck
$85 00
Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours I
during the week All units listed above will be an additional $15 00 per hour for overtime
c \shen\zip\labor equip rates 2037
CONNELL RESOURCES, INC
CONTRACTORS TIME AND MATERIAL
LABOR AND EQUIPMENT RATES
Effective March 1, 2007
All Rates are per hour except as noted
GRADING EQUIPMENT - Fueled & Maintained
Scraper 631 E
$180 00
Scraper 627E
$180 00
Scraper623F
$160 00
Scraper 615C
$110 00
Scraper 613B
$100 00
Scraper 613C
$100 00
Blade 140G
$85 00
Blade 140H
$85 00
Blade 14H
$110 00
Road Reclaimer -Dirt
$130 00
Road Reclaimer - Asphalt
$180 00
980 Loader
$125
00
972 Loader
$110
00
970 Loader
$110
00
966 Loader
$110
00
950 Loader
$90
00
938 Loader
$90
00
936 Loader
$90
00
IT 28 Loader
$90
00
John Deere 8650 with Disk
$80
00
John Deere Landscape Loader
$60
00
Skid Steer
$37
00
D-9 Cat Dozer
$170 00
D-8 Cat Dozer w/rippers
$145 00
D-6 Cat Dozer
$90 00
D-5 Cat Dozer
$80 00
D-4 Cat Dozer
$70 00
D-3 Cat Dozer
$60 00
Bobcat 250 Track Skid Steer
$50 00
EXCAVATION EQUIPMENT - Fueled & Maintained
Komatsu PC600
$155 00
Komatsu PC400
$135 00
Komatsu PC300
$115 00
Komatsu PC220
$90 00
Komatsu PC200
$85 00
Komatsu PC150
$75 00
Komatsu PC200 W/Hammer
$115 00
Cat 350 Excavator
$135 00
c lshen\apUabor,egwp rates 2007
Rock
$210 CO
$185 00
CONNELL RESOURCES, INC
CONTRACTORS TIME AND MATERIAL
LABOR AND EQUIPMENT RATES
Effective March 1, 2007
All Rates are per hour except as noted
Cat 330
Excavator
$115 00
Cat 325
Excavator
$1D5 00
Cat 320
Excavator
$95 00
Cat M318
Wheel Excavator
$85 00
Cat 436
Backhoe
$70 00
Cat426
Backhoe
$65 00
Cat416
Backhoe
$65 00
PUMPS
Y
$30 00
4"
$35 00
5"
$40 00
101,
$55 00
PAVING EQUIPMENT - Fueled & Maintained
Paving Machine Cat AP1055B
$140 00
Paving Machine LeeBoy 8500
$75 00
Paving Machine Blaw Knox 4410
$115 00
Gilcrest 813 Pro Paver
$65 00
Roadtec RX700 Profiler
$500 00
Power Curber 150
$80 00
Johnson Street Sweeper
$90 00
Crew Truck & Tools
$200 00 Day
Tack
$3 00 Gal
Distributor Truck
$60 00
ROLLER EQUIPMENT - Fueled & Maintained
815B Sheepsfoot Compactor
$115 00
Ing Rand 122FB Compactor
$90 00
Rex 3-35 Compactor
$85 00
Dynapac CA151 Vibratory Roller
$65 00
Dynapac CA151 Compactor
$65 00
Cat CP323 Compactor
$50 00
Cat CP434 Smooth Drum
$65 00
Cat CB 334E
$45 00
Cat CB 224C
$38 00
Cat CB 225E
$30 00
Hypac 530A Rubber Roller
$45 00
Hyster 0766 Roller
$70 00
Dynapac Roller,CC21,CC101,CC122
$37 00
Ing Rand DD32 Asphalt Roller
$37 00
c %shen\apRabor,egwp rates 2007