HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 30554CHANGE ORDER NO.5 (Revised #2)
PROJECT TITLE: Northside Aztlan Center (PO. No. 5505679)
CONTRACTOR: Pinkard Construction Co.
DESCRIPTION:
1. Reason for change
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
AMENDED ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
ACCEPTED BY
ACCEPTED BY:
Delay in construction progress.
Per Attached COR#15R2
$ 28,095.00
19 additional calendar days
$ 8,292,616.00
$ 332,932.00
$ 28,095.00
0.33%
0.34%
$ 8,653,643.00
ACCEPTED BY: DATE: _
Purchasing Agent over $30,000
cc: City Clerk
Project File
Engineer
Contractor
Architect
Purchasing
•
Pinkard Construction
RAISING T N E STANDARD.
CHANGE ORDER REQUEST
Date: June 25, 2007 No. 015R2
To: Steve Seefeld cc:
City of Fort Collins
117 North Mason
Fort Collins, CO 80522-0580
Project: Northside Aztlan Center
Description:
Costs and additional time associated with Owner filing an Asbestos -Contaminated Soils Work Plan
causing a delay in working in soils from February 10, 2007 through February 28, 2007 inclusive, until
the plan was approved by the state.
These represent additional costs as a result of the credit to the Owner for the hazardous material
allowance in Change Order 93 relieving Pinkard of responsibility to remove, dispose of and
management hazardous materials, as well as pursuant to the memo dated March 2, 2007 indicating
that Pinkard will stop work at the direction of the Owner if any suspect hazardous material is
discovered and will not resume work in the area until given written direction from the Owner.
Approval Date: 6/26/2007
Proparal Qrtal!flerNons:
1 77tLf quohNlott is vnlirl jar Lett (l0) rinys rvhereajler et nuey be rvi/hrlrnwu unless slater! afHenvise.
2 )ye)WI require atut a fully executed copy ojthis COB be returned to our office by "Approvrd Date" noted above to avoid construction scherlaie deirtt s
nut rrcrourNed jar ht our prldug.
3 This auotadou is also aualiRed in accordance with notes listed at attached cost breakdown smmtnrv.
Method of determining change in the Contract:
0 Fixed
❑ Estimated Change in Contract Sum
of ADD $28,095.00
0 Maximum
Approved:
Architect
By:
Architect
Authorized
Owner
—By:
Date Owner
Lump Sum
(Lump Stun, Unit Prices, Cost Plus Fee, Other)
❑r Fixed
❑ Estimated Change in Contract Time
of I9 additional calendar days
❑ Maximum
Date
Confirmed:
Pinkard Construction Co.
Con ctor Datc
1
FINICARD CONSTRUCTION CO.
RC #:
CORN: 15R2
REF: -
PROJECT: Northside Aztlan Center
LOCATION:
ARCHITECT: Mier Lingle
SUBJECT: Costs and additional time associated with delays
from Asbestos -Contaminated Soils WorkPlan
approval process.
PRICED BY:
JQ
REVIEWED BY:
MO
APPROVED BY:
MO
DATE PRINTED:
25 7un-07
Gen Requirements
EQUIPMENT
LABOR
SUBCONTRACT
NO
DESCRIPTION
QTY
UNIT
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
COST
COST
COST
COST
COST
1
GC's daily rate (465,5101343days)
19
days
1,397.00
25,783.00
1,357.00
25,793.00
0.00
0.00
0.00
Trainer costs for asbestos awareness
2
training
2
ca
300.00
600,00
300.00
603.00
0.00
0.00
0.00
3
0.00
0.00
0.00
0.00
0,00
0.00
4
0.00
0.00
0.00
0,00
0.00
0.00
5
0,00
0.00
0.00
0.00
0.00
0.00
6
0.00
0.00
0.00
0.00
0.00
0.00
7
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
9
0.00
0.00
0.00
10
0.00
0.00
0.00
1 l
0.00
0.00
0.00
12
0.00
0.00
0.00
13
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL:
26 3$3,00
26 393.00
6.00
1
0.00
0.00
26,383.00
SUB TOTAL:
NOTES:
263.83
BOND Q M
174.13
INSURANCE ©GG%
26,820.96
SUB TOTAL:
„
1,274.00
FEE @ 4.75%
4•
;5.
_.
TOTAL THIS COST PROPOSAL:
528,095