No preview available
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 30554CHANGE ORDER NO.5 (Revised #2) PROJECT TITLE: Northside Aztlan Center (PO. No. 5505679) CONTRACTOR: Pinkard Construction Co. DESCRIPTION: 1. Reason for change 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: AMENDED ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED BY ACCEPTED BY: Delay in construction progress. Per Attached COR#15R2 $ 28,095.00 19 additional calendar days $ 8,292,616.00 $ 332,932.00 $ 28,095.00 0.33% 0.34% $ 8,653,643.00 ACCEPTED BY: DATE: _ Purchasing Agent over $30,000 cc: City Clerk Project File Engineer Contractor Architect Purchasing • Pinkard Construction RAISING T N E STANDARD. CHANGE ORDER REQUEST Date: June 25, 2007 No. 015R2 To: Steve Seefeld cc: City of Fort Collins 117 North Mason Fort Collins, CO 80522-0580 Project: Northside Aztlan Center Description: Costs and additional time associated with Owner filing an Asbestos -Contaminated Soils Work Plan causing a delay in working in soils from February 10, 2007 through February 28, 2007 inclusive, until the plan was approved by the state. These represent additional costs as a result of the credit to the Owner for the hazardous material allowance in Change Order 93 relieving Pinkard of responsibility to remove, dispose of and management hazardous materials, as well as pursuant to the memo dated March 2, 2007 indicating that Pinkard will stop work at the direction of the Owner if any suspect hazardous material is discovered and will not resume work in the area until given written direction from the Owner. Approval Date: 6/26/2007 Proparal Qrtal!flerNons: 1 77tLf quohNlott is vnlirl jar Lett (l0) rinys rvhereajler et nuey be rvi/hrlrnwu unless slater! afHenvise. 2 )ye)WI require atut a fully executed copy ojthis COB be returned to our office by "Approvrd Date" noted above to avoid construction scherlaie deirtt s nut rrcrourNed jar ht our prldug. 3 This auotadou is also aualiRed in accordance with notes listed at attached cost breakdown smmtnrv. Method of determining change in the Contract: 0 Fixed ❑ Estimated Change in Contract Sum of ADD $28,095.00 0 Maximum Approved: Architect By: Architect Authorized Owner —By: Date Owner Lump Sum (Lump Stun, Unit Prices, Cost Plus Fee, Other) ❑r Fixed ❑ Estimated Change in Contract Time of I9 additional calendar days ❑ Maximum Date Confirmed: Pinkard Construction Co. Con ctor Datc 1 FINICARD CONSTRUCTION CO. RC #: CORN: 15R2 REF: - PROJECT: Northside Aztlan Center LOCATION: ARCHITECT: Mier Lingle SUBJECT: Costs and additional time associated with delays from Asbestos -Contaminated Soils WorkPlan approval process. PRICED BY: JQ REVIEWED BY: MO APPROVED BY: MO DATE PRINTED: 25 7un-07 Gen Requirements EQUIPMENT LABOR SUBCONTRACT NO DESCRIPTION QTY UNIT UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST 1 GC's daily rate (465,5101343days) 19 days 1,397.00 25,783.00 1,357.00 25,793.00 0.00 0.00 0.00 Trainer costs for asbestos awareness 2 training 2 ca 300.00 600,00 300.00 603.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00 0,00 0.00 4 0.00 0.00 0.00 0,00 0.00 0.00 5 0,00 0.00 0.00 0.00 0.00 0.00 6 0.00 0.00 0.00 0.00 0.00 0.00 7 0.00 0.00 0.00 0.00 0.00 0.00 8 0.00 0.00 0.00 0.00 0.00 0.00 9 0.00 0.00 0.00 10 0.00 0.00 0.00 1 l 0.00 0.00 0.00 12 0.00 0.00 0.00 13 0.00 0.00 0.00 0.00 0.00 0.00 SUB TOTAL: 26 3$3,00 26 393.00 6.00 1 0.00 0.00 26,383.00 SUB TOTAL: NOTES: 263.83 BOND Q M 174.13 INSURANCE ©GG% 26,820.96 SUB TOTAL: „ 1,274.00 FEE @ 4.75% 4• ;5. _. TOTAL THIS COST PROPOSAL: 528,095