HomeMy WebLinkAbout132009 TIMOTHY UPHAM - CONTRACT - RFP - P1036 APP STREETS 30534CONSTRUCTION AGREEMENT
THIS AGREEMENT is made and entered into this day of J J , , 2007, by
and between THE CITY OF FORT COLLINS, COLORADO, a municipal corporation (hereinafter
referred to as "the City"), and Tim Upham, Inc., a Colorado corporation (hereinafter referred to as
"Artist.")
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between
the parties hereto as follows:
1. Scope of the Work. The Artist shall furnish all of the materials and perform all of the
work shown on the drawings and described in the specifications for the Streets Facility Project attached
hereto as Exhibit "A" and incorporated herein by this reference (the "Project"), and consisting in general
terms of the design, construction, signage and installation of "Beet Streets" which is a stainless steel
sculpture with bench for the front entryway of the facility. Work performed shall be of high quality, in
compliance with generally accepted standards of workmanship, and in conformity with the contract
documents.
2. Time of Completion. The work to be performed pursuant to this Agreement shall
commence upon receipt by artist of the Notice to Proceed and shall be fully completed by September 28,
2007. Any extensions of the time limit set forth above must be agreed upon in writing by the parties
hereto. The City shall grant a reasonable extension of time to the Artist in the event there is a delay on
the part of the City in performing its obligations under this Agreement or if conditions beyond the
Artist's control or Acts of God render timely performance of the Artist's services impossible.
3. Capital Project Management Control System. In order to insure that the Project is
consistent with its authorized scope and schedule, the Artist shall provide an approximate SCHEDULE
for the completion of all unit work items covered by the Agreement. The schedule shall indicate the
anticipated percentage completion of each unit work item for each week for the duration of the work.
The initial schedule must be submitted to the City prior to beginning the work. Artist will provide
monthly written reports to the City at the address specified in Section 15, below, advising of the status of
the Project.
4. City Representative. The City will designate, prior to commencement of the work, its
project representative who shall make, within the scope of his authority as provided by ordinance and in
the Capital Project Management Control System, all necessary and proper decisions with reference to
the Project. All requests for contract interpretations, change orders, or other clarification or instruction
shall be directed to the City representative.
5. Changes to Scope of Work.
A. Changes by Artist. Any change by Artist from the Project specifications and drawings in
Exhibit "A" must be approved in advance by the City.
8. Guarantee of Workmanship and Material. For a period of three (3) years from the date of
the City's Letter of Acceptance, Artist agrees to replace or correct any material defects in the Project,
whether caused by defects in the design, workmanship or materials used in the Project. If Artist fails to
replace or correct any such defects, or to make arrangements to do so within a reasonable time
satisfactory to the City, the City shall have the right to arrange for such replacement or correction, and
Artist agrees to reimburse the City for the costs of any such replacement or correction. Should the City
ask Artist to repair damage caused to the Project by vandalism, collision, or other unforeseeable
environmental damage, Artist shall be reimbursed for reasonable material and labor costs for such
repairs, except to the extent such damage is due to a defect in design, workmanship or materials used in
the Project.
9. Maintenance Instructions and Maintenance. Artist shall provide to the City written
instructions for maintenance of the Project, to include detailed information regarding the operation, care,
maintenance and repair of the Project and a complete set of color slides depicting no fewer than a total
of six views of the completed Project. Artist agrees to provide continuing advice to the City regarding
the operation, care, maintenance and repair of the Project at no charge to the City, unless otherwise
agreed to by both parties in writing.
10. Contract Sum. The City shall pay Artist for the performance of this Contract, subject to
additions and deletions provided herein, the sum of Twenty -Four Thousand Dollars ($24,000.)
The City agrees to pay the Artist under the following schedule:
A. $9,000 upon full execution of this Agreement;
B. $8,000 upon completion and installation of sculptural element;
C. $7,000 or any remaining amounts due under this Agreement, upon the City's final approval
and acceptance of the Project as complete, and receipt by the City of satisfactory maintenance
instructions as described in Section 9, above, lien waivers in substantially the form shown in
Exhibit `B" from Artist and a comparable lien waiver from any and all Subcontractors that have
performed work or provided materials in connection with the Project.
11. Failure to Complete. The parties agree that if Artist becomes ill, dies, or is otherwise
unable or unwilling to complete the Project in accordance with the Agreement, any work already done
on the Project shall be the property of the City. The City shall be entitled to withhold any sums not yet
paid to Artist, and may use any such sums toward completion of the Project in any manner deemed
appropriate by the City.
12. Project as Unique. Artist represents and warrants that the Project is artistically unique,
and agrees not to create or be involved in the creation of an identical or substantially similar artwork
within 100 miles of Fort Collins, Colorado.
13. Liquidated Damages. It is specifically recognized by and between the parties hereto that
the City will suffer certain unspecified damages in the event the Project is not completed within the time
set forth above, as adjusted for any delays agreed upon by the parties pursuant to Section 2, above. In
recognition of the difficulty of ascertaining the actual damages to be sustained by the City, the parties
agree that the assessment of liquidated damages shall be appropriate. In the event the Project is not
completed within the specified time, this shall be assessed against Artist, and Artist hereby authorizes
the City to retain from any monies due the Artist, the sum of One Hundred Dollars ($100.00) per day for
each and every calendar day the Project remains unfinished. In no event shall liquidated damages
exceed the sum of Three Thousand Dollars ($3,000.00).
14. Governing Law. This Agreement shall be governed by the laws of the State of Colorado.
15. Notice. Any notice to be sent pursuant to this Agreement shall be deemed delivered if
sent to the other party by certified or registered mail, return receipt requested and postage prepaid, at the
following address:
If to the Artist:
Tim Upham
Tim Upham Inc.
5012 Sandstone Drive
Fort Collins, CO 80526
(970) 484-9574
16. Termination/Default.
If to the City:
Ellen Martin
Lincoln Center
417 West Magnolia
Fort Collins, CO 80521
A. Termination. This Agreement may be terminated by the City upon at least seven (7) days
written notice to the Artist. In such event the City shall compensate Artist for all services
performed to the date notice of termination is received, together with reasonable expenses then
due, unless otherwise agreed in writing by the parties.
B. Default. Each and every term and condition of this Agreement shall be deemed to be a
material element of this Agreement. Time is of the essence. In the event either party should fail
or refuse to perform according to the terms of this Agreement; they may be declared in default
thereof. If Artist defaults or neglects to carry out the work in accordance with this Agreement,
the City may elect to make good such deficiencies and charge Artist therefore.
C. Remedies Upon Default. In the event a party has been declared in default hereof and
performance is possible within the completion time as established herein, such defaulting party
shall be allowed a period of five (5) days within which to cure said default. In the event the
default remains uncorrected (or timely performance is not possible), the party declaring default
may elect to: (1) immediately terminate the Agreement; (2) treat the Agreement as continuing
and require specific performance; and/or (3) avail himself of any other remedy at law or equity.
If either party elects to terminate the agreement for default, termination shall be effective upon
the mailing, by the terminating party, of written notice of termination to the defaulting party.
D. Attorne sY Fees. In the event of default of any of the agreements herein by either party
which shall require the party not in default to commence legal or equitable action against the
defaulting party, the defaulting party shall be liable to the non -defaulting party for the non-
Sculpture - 14' high X 12' wide X 5' depth
Bench - 18" high X 18" wide X 6'6" long
The sculpture contains a stainless steel replica of the current city map used by the
streets facility crews. Superimposed on this map is a smaller map, in contrasting
color, that illustrates the streets of Fort Collins circa 1900, the heyday of the Sugar
Beet Factory. The maps demonstrate the growth and change that shapes the
streets of Fort Collins. Containing the map structure is a brick red frame that
references both the shape of the renovated beet factory's windows, as well as the
color.
The location of the Sugar Beet Factory and Streets Facility building are accented on
the maps with a big brass star, symbolizing the important location or "center of the
universe" for this project.
A bench is placed beneath the steel map and frame structure to invite viewers to
relax and take ownership in the piece by offering a place to sit and appreciate the
artwork.
The artist team will design, fabricate and install the sculptural element at the front
exterior entryway to the Streets Facility building. Location will be approved by Pro-
ject Team.
2
B. Changes by the City. The City shall be entitled to request changes in the design and
construction of the Project through written Change Order Requests. No work related to the
requested change shall proceed until the parties have reached agreement regarding changes in
price or scheduling requirements related to the requested change, and a written Change Order
documenting the agreed upon terms is issued by the City.
6. Formal Acceptance and Ownership of the Project. No more than thirty (30) days after the
Artist has informed the City that the Project has been fully installed and is complete, the City will
provide a written response to the Artist, informing the same either that: (1) the City agrees that the
Project has been fully installed and is complete consistent with the terms of this Agreement, all other
related work is completed in accordance with this Agreement and Exhibit "A," and the City formally
accepts the Project as completed ("Letter of Acceptance"); or (2) the Project is not deemed to be
completed due to unresolved issues or defects that remain, and describing such outstanding issues or
defects which Artist must then cure before a Letter of Acceptance will be issued. The Project is not
finally complete for purposes of this Agreement until the City has issued a Letter of Acceptance. Upon
the City's issuance of a Letter of Acceptance the City will become the sole owner of the Project, and
artist shall have no further obligations hereunder, except as set forth in Sections 8, 9, 12, and 26.
7. Ownership of Works Created.
A. Assignment of Copyright. The Artist hereby assigns, transfers, and conveys to the City
all right, title and interest in and to the Project together with the copyright therein and the right to
secure copyright registration therefore, in accordance with Sections 101, 204, and 205 of Title 17
of the United States Code, the Copyright Law of the United States. This assignment, transfer
and conveyance includes, without limitation, any and all features, sections, and components of
the Project, any and all works derived therefrom, the Unites States and worldwide copyrights
therein, and any renewals or extensions thereof, and any and all other rights that the Artist now
has or to which Artist may become entitled under existing or subsequently enacted federal, state,
or foreign laws, including, but not limited to the following rights: to reproduce, publish, and
display the Project publicly, to prepare derivative works of and from the Project, to combine the
Project with other materials, and to otherwise exploit and control the use of the Project. As
additional consideration for this assignment, the City agrees that all reproductions of the Project
by the City shall credit the Artist.
B. License Back to Artist of Certain Rights. The City hereby grants to Artist the following
rights in and to the Project: the non-exclusive right to make two-dimensional reproductions of
the Project for any purpose, provided that any such reproduction clearly states the location of the
Project, acknowledges the City and the Art in Public Places Program, and contains a copyright
notice. With the exception of publicity pieces, the Artist shall not knowingly permit others to
make reproductions of the Project for commercial purposes without the written permission of the
City.
C. Rights under the Visual Artists' Rights Act. To the extent the uses or removal of the
Project under this Contract affect any rights Artist may have under the provisions of federal or
state law, including the 1990 Visual Artists' Rights Act, the Artist hereby knowingly waives any
rights of preservation of the Project provided by those laws.
defaulting party's reasonable legal fees, including attorney's fees, incurred because of the
default.
17. Assignment. It is understood that the City enters into this Agreement based on the
special abilities of Tim Upham and Lisa Cameron, and that this Agreement shall be considered as an
agreement for personal services. Accordingly, Artist shall neither assign any responsibilities nor
delegate any duties arising under this Agreement without the prior written consent of the City.
18. Artist -- Independent Agent. The Artist shall perform all work under this Agreement as
an independent agent and shall not be considered an agent of the City, nor shall the Artist's
Subcontractors or employees be subagents of the City.
19. License and Business. The Artist shall hold, in the Artist's name, all necessary licenses to
perform the work, and shall have full authority to do business in the State of Colorado. The Artist shall
have a designated place of business for making and accepting communications with or from the City.
The address and telephone number of Artist shall be maintained with the City throughout the contract
period.
20. Superintendence. The Artist shall keep competent supervisory personnel on the work
during its progress and designate before starting work an authorized representative who shall have
complete authority to represent and to act for the Artist. The Artist shall provide efficient supervision of
the work, using Artist's best skill and attention. The Artist shall be solely responsible for all
construction means, methods, techniques, and procedures, and for providing adequate safety precautions
and coordinating all portions of the work.
21. Employees. The Artist shall employ only competent, skillful workers to do the work;
whenever any person shall appear to be incompetent or to act in a disorderly or improper manner; such
person shall be removed from the work.
22. Subcontractors. It is understood by the parties that the Artist may utilize Subcontractors
to complete the fabrication, transportation and/or installation of the Project, under Artist's direction and
supervision. The Artist shall, within fifteen (15) days of the effective date of this Agreement, submit to
the City the names of all Subcontractors proposed for the work. The Artist shall not employ any
Subcontractors that the City may object to as lacking capability to properly perform work of the type
and scope anticipated. The Artist agrees that it is as fully responsible to the City for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by it as it is for the
acts and omissions of persons directly employed by it. Nothing contained in the contract documents
shall create any contractual relation between any Subcontractor and the City, except to the extent the
City is indemnified or insured through requirements upon said Subcontractor. If subcontractors are
used, the City may, in its discretion, require the submission of lien waivers in a form reasonably
acceptable to the City by any such subcontractors prior to final payment to the Artist.
23. Prosecution of the Work. It is expressly understood and agreed that the time of
beginning, rate of progress, and time of completion of the work are the essence of this Agreement. The
work shall be prosecuted at such time, and in or on such part or parts of the project as may be required to
complete the Project during the time specified in the Agreement and the approved construction schedule.
The Artist's tools and equipment used on the work shall be furnished in sufficient quantity and of a
capacity and type that will safely perform the work specified without delay in the progress of the work.
24. Safety. The Artist shall be solely responsible for maintaining a safe work area and
protecting the safety and welfare of Artist's employees, subcontractors, and the general public, including
without limitation area residents, motorists, bicyclists, pedestrians, and children from work area hazards.
The Artist shall provide all work area safety control devices, at Artist's cost, including, for example,
barricades and safety fences around excavations and drop-offs. The Artist's safety precautions shall be
in compliance with all applicable laws, rules and regulations.
25. Work and Property. The Artist shall use his best efforts to at all times safely guard the
City's property from injury or loss in connection with the work. The Artist shall, at all times, use his
best efforts to safely guard and protect from damage the work and adjacent property, including
underground utilities. All passageways, guard fences, lights, and other facilities required for protection
by state or municipal laws and regulations and location conditions must be provided and maintained.
The Artist shall protect the work and materials from damage due to the nature of the work, the elements,
carelessness of the Artist, or from any foreseeable cause whatever until the completion and acceptance
of the Project. All loss or damages arising out of the nature of the work to be done under this
Agreement, or from any unforeseen obstruction or defects which may be encountered in the prosecution
of the work, or from the action of the elements, shall be the liability of the Artist.
26. Indemnity. The Artist shall indemnify and hold harmless the City, and its officers, agents
and employees, from and against all claims, damages, losses, and expenses, and legal fees including
attorney's fees, arising out of or resulting from the Artist's performance under this Agreement.
In any and all claims against the City, or any of its officers, agents, or employees by any employee or
agent of the Artist, or of any Subcontractor, the indemnification obligation under this Section shall not
be limited in any way by any limitation on the amount or type of damages, compensation, or benefits
payable by or for the Artist or any Subcontractor under Workmen's Compensation laws, Disability
Benefit laws, or other employee benefit laws.
27. Insurance and Liability. The Artist shall provide, or in lieu of himself providing, shall
require all Subcontractors providing services in connection with this Agreement to provide from
insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all
costs before commencing work under this Agreement. The Artist shall furnish the City with certificates
of insurance specified herein showing the type, amount, class of operations covered, effective dates, and
date of expiration of policies, and containing substantially the following statement:
"The insurance covered by this Certificate will not be canceled or materially
altered, except after ten (10) days written notice has been received by the Owner,
the City of Fort Collins."
In case of the breach of any provision of this Section, the City, at its option, may take out and maintain,
at the expense of the Artist, such insurance.
The Artist shall not commence work under this Agreement until all the insurance required thereunder
has been reviewed by the City and an acceptable certificate of insurance has been provided to the City.
The Artist, or in lieu thereof, all Subcontractors of Artist, shall maintain during the life of this
Agreement the statutory Worker's Compensation Insurance required and, in addition, Employer's
Liability Insurance in an amount not less than $400,000 for each occurrence, for all of his her
employees, if any, to be engaged in work on the Project under this Agreement.
The Artist and all Subcontractors of Artist shall maintain during the life of this Agreement such
commercial general liability insurance as will provide coverage for claims for damages for personal
injury, including accidental death, as well as for claims for property damage, which may arise directly or
indirectly from performance of the work under this Agreement. Coverage for property damage shall be
on a "broad form" basis. Amount of insurance to be provided shall be not less than $300,000 combined
single limits for bodily injury and property damage.
In the event any work under this Agreement is performed by a Subcontractor, the Artist shall be
responsible for any liability directly or indirectly arising out of the work performed under this
Agreement by a Subcontractor, which liability is not covered by the Subcontractor's insurance.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first
above written.
SEAL
ATTEST:
Ali. A�' Z/ h*1�?�y-
__ - r , l� I lgo% Ntoii t4owis
City Clerk
APPR7(Ielb�
AS T FORM:
Assistant`City Attorney
THE CITY OF FORT COLLINS, COLORADO,
A Municipal Corporation
BY: `�, - \?,c t C
J� B. O'Neill II, CPPO, FNIGP
Dire&or of Purchasing and Risk Management
ATTEST:
Corporate Secretary
STATE OF (c�,{ 6,r�o )
)ss.
COUNTY OF Lav" mer )
Subscribed and sworn to before me this 3
Tim Upham as President of Tim Upham, Inc.
Witness my hand and official seal.
My Commission Expires: 9 - -)O -1 v
Notary
ARTIST:
TIM UPHAM, INC.
a Colorer corpo ti n
By:
Tim Upham,
President
day of �i 11.E , 2007, by:
WCOWAIG"8:
WER for all work, labor,
e in the construction,
I adequacy of which are
t limited to, mechanic's
rward have, claim or
uction, design,
is officers, agents,
.e project or against all
to or for the construction,
rmed by the ARTIST or
aterial men or their agents,
1 any and all existing or
'S rights or control
concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project.
4. The ARTIST agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project
against and from any claim hereinafter made by the ARTIST'S Subcontractors, material men, employees, servants agents or
assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for
all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the
property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver
Release is for the benefit of and may be relied upon by the OWNER, the LENDER, if any, and Surety on any labor and
material bonds for the project.
Signed this
TIM UPHAM, INC.
a Colorado corporation
By:
Tim Upham, President
day of , 2007.
STATE OF COLORADO )
) ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this
Inc.
Witness my hand and official seal.
My Commission Expires:
Notary Public
day of , 2007, by Tim Upham as President of Tim Upham,
r-la
r�
A plaque will further explain the project and it's historical reference.
Beet Streets plaque:
Beet Streets
designed & built by
Tim Upham & Lisa Cameron
2007
The Great Western Sugar Factory (1904)
Streets Facility (200?)
millennium maps of Fort Collins
circa 1900 & 2000
Art In Public Places Program
City of Fort Collins
Beet Streets Budget
Insurance $500
Materials: stainless steel, steel, rolled steel and stone bench $4000
Fabrication: welding, painting $11,000
Installation: concrete caissons, concrete pad, crane, welding, plaque $3500
Production fee $3320
7% contingency $1680
Total $24,000