HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 30447Change Order Form
Engineering Department
PROJECT TITLE: Drake/Ziegler Improvements Project - Phase II
PROJECT NUMBER: 30523280.6 (Bid #6029)
CONTRACTOR: Gerrard Excavation (PO #7701943)
CHANGE ORDER NUMBER: 3
n preparing change or ers s ow In order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. The contract cost will increase by $ 61,534.48
4. There will be no change in contract time
ORIGINAL CONTRACT COST . $1,447,739.65,
TOTAL APPROVED CHANGE ORDERS $67,808.66
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $61,534.48
TOTAL % OF THIS CHANGE ORDER 4.25%
TOTAL C.O. % OF ORIGINAL CONTRACT 8.93%
ADJUSTED CONTRACT COST $1,577,082.79
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY
APPROVED BY:
APPROVED BY:
cc: Contractor
Purchasing
Project File
(Contractor's Representative)
IEnaineerl
DATE: Z
DATE: y f 2
z7 o
i' h� �i zle 6X DATE: C vz 7 O 7
(Department ad) /� Q
DATE: Z
(Purchasing Agent over $30,000)
Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
Gerrard Excavating
CHANGE ORDER NO.3
Drake/Ziegler Improvement Project - Phase 2
SUMMARY OF WORK
See attached submittal
Item
/ Unit
1 I Waterline Work for Sanitary Sewer Department 1 0.51 LS 1 $ 106,210.95 1 $ 53,105.481
15' RCP
REASON FOR CHANGE
1 Waterline Material for Waterline Installation along Future Percheron Drive for COFC Sewer Department. Will pay other half of LS price when installed.
2 15" RCP installed at Stoneridge Pond per plan - missed Quantity in Estimate
3
WHEN POSTED
Posted to Pay Estimate No.3