Item # Item Description Quantity Unit Unit Cost Total Cost
201-01 Clear and Grubbing 1 LS
202-01 Remove Curb and Gutter 3555 LF
202-02 Remove Sidewalk 14297 SF
202-03 Remove Asphalt - Full Depth (4"-8") 17320 SY
202-04 Profile Milling 3320 SY
202-05 Remove Tree - 48"+ Diameter 4 EA
202-06 Remove Tree 24" Diameter 1 EA
202-07 Remove Pipe 460 LF
202-08 Remove Inlet 2 EA
202-09 Remove Existing FES 5 EA
202-10 Remove Concrete Channel 320 LF
202-11 Remove Leech Field and Sceptic Tank 1 LS
202-12 Remove Area Inlet 1 EA
202-13 Remove Irrigation Structure 1 EA
202-14 Remove Existing Hydrant per FCLWD Specs 1 EA
202-15 Remove Headwall 2 EA
202-16 Remove Gate 5 EA
202-17 Remove Retaining Wall 2 EA
203-01 Unclassified Excavation 1083 CY
203-02 Embankment - CIP 12720 CY
203-03 Borrow Suitable Fill 11637 CY
203-04 Topsoil (Striping, Stockpiling, and Placing) 6696 CY
203-05 Import Screened Topsoil (6") in Parkway Areas 657 CY
203-06 Median Fill - 60/40 Mix 2903 CY
203-07 Splashblock/Hardscape Shaping - CIP 30513 SF
203-08 Flowfill Over Shallow Utilities 407 CY
203-09 Muck Excavation - CIP 200 CY
206-01 Structure Excavation 267 CY
206-02 Structure Backfill On-Site Material 267 CY
206-03 Filter Material - 1 1/2" Washed Rock 65 TON
208-01 Erosion Control 1 LS
210-01 Adjust Manhole Ring/Cover 15 EA
210-02 Adjust Valve Box 10 EA
210-03 Modify Manhole 4 EA
210-04 Relocate PRV Vent per FCLWD Specs 1 EA
210-05 Relocate Meter Pit 4 EA
Prepared by: The City of Fort Collins - Engineering - Street Oversizing Program
Roadway Improvements
Addendum #1 Revised Bid Schedule
6055 Harmony and Ziegler Road Improvements
Front Range Village Development
Dated: 5/15/2007
Item # Item Description Quantity Unit Unit Cost Total Cost
Prepared by: The City of Fort Collins - Engineering - Street Oversizing Program
Addendum #1 Revised Bid Schedule
210-06 Relocate Fire Hydrant 1 EA
210-07 Relocate CP Test Station 7 EA
210-08 Remove and Relocate Fence 820 LF
210-09 Remove PVC Fence Intact and Deliver to Owner 200 LF
210-10 Remove and Reset Mailbox 6 EA
304-01 Agg Base Course - (Class 5 or 6) - 4" Depth - CIP 1675 TON
304-02 Agg Base Course - (Class 5 or 6) - 10" Depth - CIP 17965 TON
304-03 Gravel Shoulder - Class 5 or 6 Aggreegate base (6" Depth) 275 TON
304-04 Road Base for Driveway Tie-ins 120 TON
306-01 Reconditioning (8") 31400 SY
306-02 Sidewalk Preperation 3297 SY
307-01 Fly-Ash - 12" Depth - 12% 8860 SY
403-01 Hot Bituminous Pavement – Grading S – 100 – (2” Depth) – (PG 64-28) 2033 TON
403-02 Hot Bituminous Pavement – Grading S – 100 – (2.5” Depth) – (PG 64-22) 2467 TON
403-03 Hot Bituminous Pavement – Grading SG – 100 – (4” Depth) – (PG 58-28) 5440 TON
403-04 Asphalt Leveling Course ¾ Grading S - 100 – (PG 64-28) 2305 TON
403-05 Asphalt Hand Patching – Grading S – 100 – (3”) – (PG 64-28) 463 TON
403-06 Asphalt Hand Patching – Grading SG - 100- (7” Depth) – (PG 58-28) 1055 TON
403-07
WestBound Harmony Detour Paveing - 200'x60'x5" (2” PG 64-28 on 3”
PG 58-28) 720 TON
412-01 Concrete Pavement - 10" 8425 SY
412-02 Enhanced Concrete Crosswalk -10" - Tile Red w/ Stamped Border 547 SY
506-01 D-50 Buried Rip-Rap, 6” Topsoil (CIP Per Detail) 4 EA
601-01 Concrete Retaining Wall with Footer and 6' Attached Block Wall 150 LF
601-02 Concrete Wall Extension with Guardrail 1 LS
603-01 18" RCP Class III 1128 LF
603-02 24" RCP Class III 14 LF
603-03 19"x30" HERCP Class III 236 LF
603-04 34"x53" HERCP Class III 323 LF
603-05 8" HDPE Pipe 10 LF
603-06 18" RCP Class III FES 8 EA
603-07 19"x30" HERCP Class III FES 1 EA
603-08 Concrete Encasement 120 LF
603-09 18" RCP thru Retaining Wall 1 EA
603-10 Tie 34"x53" HERCP to Existing Concrete Irrigation Ditch - CIP 2 EA
603-11 Tie to Existing MH 3 EA
603-12 4" Median Underdrain Pipe (Perforated) 3640 LF
6055 Harmony and Ziegler Road Improvements
Front Range Village Development
Dated: 5/15/2007
Item # Item Description Quantity Unit Unit Cost Total Cost
Prepared by: The City of Fort Collins - Engineering - Street Oversizing Program
Addendum #1 Revised Bid Schedule
603-13 4" Median Underdrain Pipe (Solid) 910 LF
603-14 4" Median Underdrain Clean Out 24 EA
603-15
4” Median Underdrain/Storm Sewer Tie-in (Core Drill and Connect with
Non-shrink Grout) 5 EA
604-01 5' Type R Inlet 3 EA
604-02 10' Type R Inlet 1 EA
604-03 15' Type R Inlet 2 EA
604-04 18" Area Inlet 1 EA
604-05 Inlet Type "C" 3 EA
604-06
8” HDPE Area inlet and Tie in (Core Drill and Connect with Non-shrink
Grout) 2 EA
604-07 Double Type 13 Inlet 1 EA
604-08 24" Headwall - CIP 1 EA
604-09 Tie 18" RCP to Existing Storm Sewer with Concrete Collar 1 EA
604-10 4' Diameter Sewer Manhole 1 EA
604-11 4" PVC Conduit Sleeving for Median Irrigation 600 LF
608-01 Concrete Sidewalk - 6" 27350 SF
608-02 Concrete Pedestrian Access Ramps with Truncated Domes (8”) 2320 SF
608-03 Pedestrian Refuge Island Ramp with Truncated Domes (8”) 1380 SF
608-04 Sidewalk Chase - per Detail 3 EA
608-05 Concrete Drive Approach w/ Aprons (8") 8025 SF
608-06 Concrete Drive Approach (6") 1608 SF
608-07 Exposed Aggregate Median Cover - San Diego Buff 25743 SF
609-01 Vertical Curb and Gutter - 30" 6055 LF
609-02 Vertical Curb and Gutter - 18" Outfall 10875 LF
609-03 Combination Vertical Curb with 6' Bike Lane/Gutter 500 LF
619-01
¾” Irrigation Service & Meter Pit/Copper-Corp-Curb Stop per COFC
Spec including Backflow Preventer/Pressure Reducer
Assembly/Metal Screen Cover 2 EA
619-02
1” Irrigation Service & Meter Pit/Copper-Corp-Curb Stop per COFC
Spec including Backflow Preventer/Pressure Reducer
Assembly/Metal Screen Cover 1 EA
619-03 Fire Hydrant Assembly (6”, tap valve, pipe, hydrant) per COFC Spec 1 EA
SUBTOTAL:
2000-01 Dry-Land Seeding 7 AC
2000-02 MSE Block Retaining Wall - 12" to 24" Tall 290 LF
2000-03 Median Irrigation System for Harmony Road Medians 1 LS
2000-04 Median Irrigation System for Ziegler Road Medians 1 LS
Landscaping Quantities
6055 Harmony and Ziegler Road Improvements
Front Range Village Development
Dated: 5/15/2007
Item # Item Description Quantity Unit Unit Cost Total Cost
Prepared by: The City of Fort Collins - Engineering - Street Oversizing Program
Addendum #1 Revised Bid Schedule
2000-05 6"x6" Landscape Timber Tree Well 24 EA
2000-06 Skyline Honey Locust 2" Cal. 21 EA
2000-07 Skyline Honey Locust 3" Cal. 19 EA
2000-08 Crimson Spire Oak - 2" Cal. 6 EA
2000-09 Burr Oak - 2" Cal. 9 EA
2000-10 Chinkapin Oak - 2" Cal. 11 EA
2000-11 SkyMaster English Oak - 3" Cal. 15 EA
2000-12 Chanticleer Pear 1.5" Cal. 33 EA
2000-13 Harrison Yellow Shrub Rose - 5 Gal. 28 EA
2000-14 Single Pink Shrub Rose - 5 Gal. 23 EA
2000-15 Native Pink Rose - 5 Gal. 35 EA
2000-16 Dwarf Korean Lilac - 5 Gal. 47 EA
2000-17 Bar harbour Juniper - 5 Gal. 56 EA
2000-18 Hughes Juniper - 5 Gal. 142 EA
2000-19 Icee Blue Juniper 71 EA
2000-20 Dwarf Yellow Day Lily - 1 Gal. 20 EA
2000-21 Feather Reed Grass - 1 Gal. 124 EA
2000-22 Variegated Feather Reed Grass - 1 Gal. 66 EA
2000-21 Dwarf Fountain Grass - 1 Gal. 114 EA
2000-22 Mulching 39190 EA
SUBTOTAL:
- Contract Bond 1 LS
625-01 Construction Surveying 1 LS
626-01 Mobilization 1 LS
630-01 Specialty Signs 3" letters on 48"x48" 27 EA
630-02 Variable Message Boards 20 EA per Day
630-03 Type III Barricades 8 Section
630-04 Traffic Control 1 LS
SUBTOTAL:
$Dollars
COMPANY NAME
Miscellaneous Quantites:
TOTAL PROJECT:
TOTAL WRITTEN IN WORDS
6055 Harmony and Ziegler Road Improvements
Front Range Village Development
Dated: 5/15/2007
Item # Item Description Quantity Unit Unit Cost Total Cost
Prepared by: The City of Fort Collins - Engineering - Street Oversizing Program
Addendum #1 Revised Bid Schedule
SIGNATURE TITLE
PRINTED NAME