Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 30324 6027 PRIMROSE ART STUDIOSECTION 00950 CHANGE ORDER NO. 01 PROJECT TITLE: Primrose Art Studio Remodel CONTRACTOR: Construction Concepts, Inc. PROJECT NUMBER: Bid No. 6027 "B" DESCRIPTION: Remodel Work In preparing change orders show In order as separate numbered paragraphs the following: 1. Reason for change: To reduce health hazards from mice and rat droppings and remove Crawl Space debris. 2. Description of change: Replace existing ductwork with all new material and clear/rake Crawl Space, 3. Change in contract cost: Add $1,068.00 4. Change in contract time: 0 days (Attach additlonal sheets as required) y' oD 3�1 0Zs4) ORIGINAL CONTRACT COST 300,471.00 TOTAL APPROVED CHANGE ORDERS 00.00 TOTAL PENDING CHANGE ORDERS 00.00 TOTAL THIS CHANGE ORDER 1,068.00 TOTAL % OF THIS CHANGE ORDER Less than 10/6 TOTAL % OF ORIGINAL CONTRACT Less than 1% ADJUSTED CONTRACT COST 301.539,00 !Assuming all change orders approved? ACCEPTED BY: 5-25-07 ;Construct n ncepts, [no. Date ACCEPTED BY:GZ!/ teve White, Project Ma ager Date t REVIEWED BY:� Aller-Lingle Date APPROVED BY: rf/0 % M k Sears, Natural Areas Date cc: Project File, Contractor, Purchasing, Engineer 303acl